Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Seabrook-Hampton 15904 Status: Design
Scope of Work: The project is located on Route 1A in the Town of Hampton, Rockingham County. The project entails the rehabilitation or replacement of the Neil R Underwood Bridge (NHDOT Bridge No. 235/025) which spans the Hampton River at the inlet to Hampton Harbor. The bridge is a vital transportation link between the Village of Hampton Beach and Seabrook Village.

The bascule bridge was built in 1949 and replaced a wooden bridge originally constructed for trollies and cars, known as the “Mile-Long Bridge”. It has been rehabilitated multiple times, including in 1963, 1978, 1983, 1990, 2002 and 2010. Emergency repairs to the bascule span mechanical system were undertaken in 2018.

A Bridge, Type, Size and Location Study (TS&L) will be conducted by NHDOT. This study will evaluate three alternatives, Major Rehabilitation, Replacement with a Bascule, and Replacement with a Fixed Structure.

Contact: Jennifer E. Reczek, P.E.
Jennifer.Reczek@dot.nh.gov
Telephone:(603) 271-3401
RAISE Discretionary Grant Application 2021

Benefit Cost Analysis

Certificate of Compliance with Davis-Bacon Requirements

 

Available Files:
NEPA Hearing, April 8, 2021
6:00 PM
The NHDOT has prepared an Environmental Assessment (EA), in accordance with the National Environmental Policy Act and the NHDOT’s guidelines for environmental documents, for the proposed replacement of the Neil R. Underwood Memorial Bridge. The 30-day public comment period begins March 24, 2021, with written comments being accepted through April 23, 2021. Comments may be submitted in writing or by email to Ms. Jennifer Reczek, NH Department of Transportation, 7 Hazen Drive, PO Box 483, Concord, NH 03302-0483 or through the e-mail link above.

There will be a public hearing to present the project’s impact on environmental resources and accept comments on the EA document. This hearing will be held virtually, via Zoom, on Thursday, April 8, 2021 at 6:00 PM. To attend the Zoom Meeting from a PC, Mac, iPad, iPhone, or Android device please go to https://zoom.us/j/96583846007?pwd=aVpRWU9IeHk4ZUd3Z3ZjUGpaeHlVdz09. When prompted type in the passcode: 949550.

To join the Zoom Meeting by telephone, dial 1-646-558-8656. When prompted, enter on your keypad the Meeting ID: 965 8384 6007 followed by #: 949550.
Participants that call in on the telephone must enter *6 to mute or unmute and *9 to raise and lower your hand. International numbers are available at https://zoom.us/u/aJsTC21g

US Coast Guard
Public Information Meeting
January 14, 2021
PAC Meeting #6
January 6, 2021
PAC Meeting #5
April 1, 2020
PAC Meeting #4
August 29, 2019
NH Dredge Management Task Force Meeting, February 6, 2019
Public Informational Meeting, January 30, 2019
Meeting with Abutters
December 12, 2018
PAC Meeting #3
December 4, 2018
PAC Meeting #2
November 13, 2018
Public Informational Meeting, September 26, 2018
PAC Meeting #1
July 12, 2018
Emergency Repairs
February - March 2018




New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire