Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Portsmouth-York 16189B Status: Design
Scope of Work: I-95 Part Time Shoulder Use between Exit 5 in NH and Exit 3 in Maine both NB and SB, in conjunction with the MaineDOT and the Maine Turnpike Authority.
Contact: Charles Blackman, P.E.
Charles.E.Blackman@dot.nh.gov
Telephone: (603) 227-0016
Available Files:

 

REF Addendum #1
April 9, 2021

Book 1 - RFP

Book 2 - Technical Provisions

Book 3A - Special Provisions

Book 4 Concept Plans

Supporting Docuents

Public Informational Meeting
March 24, 2021
6pm

Meeting will be presented as a Zoom Conference call

Original RFP
(Books 1-4) (2/17/21)

Book 1 - RFP
(Instruction to Proposers (ITP) and Design-Build Contract)

Book 2 - Technical Provisions

Book 3A - Special Provisions

Book 3B - Federal Provision

RFP Forms

Book 1

  Book 2
Supporting Documents

Book 1





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire