Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Manchester-Hooksett-Bow 13917 Status: Complete
Scope of Work: NH3A feasibility study from I293 exit 7 in Manchester to Bow/Concord municipal boundary.
Contact: Keith Cota, P.E.
Keith.Cota@dot.nh.gov
Telephone: (603) 271-2171
Available Files:  
Feasibility Study NH3A Feasibility Study




New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire