Project: Hampton 42295 Status: Design
Scope of Work: Evaluate and design curb ramp improvements to meet Americans with Disabilities Act (ADA) requirements and joint Department of Justice (DOJ)/US Department of Transportation (USDOT) 2013 Rule. The project’s intent is to provide improved pedestrian connectivity from the roadway level to the existing curbed pedestrian facilities following or in advance of the Department’s roadway surfacing improvements.
Project Limits: The project limits extend 3.4 miles along the northbound side of NH Route 1A (Ocean Boulevard) from Epping Avenue to Cusack Road and 2.4 miles along the southbound side of NH Route 1A from Cusack Road to Nudd Avenue, for a total of 5.8 miles
Contact: Ronald Grandmaison, P.E.
Ronald.Grandmaison@dot.nh.gov
Telephone: (603) 271-6198
Available Files:

Additional Information:

Advertising Date: September 24, 2019