Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Hampton 40797 Status: Design
Scope of Work: Improvements to Ocean Boulevard (NH1A). The 2018 Transportation Update of theTown’s Hampton Beach Area Master Plan will serve as a basis for analysis and design alternative development; however, additional improvement opportunities to the transportation network will also be explored where possible. Primary areas of focus will include a review of bicycle and pedestrian accommodation enhancements, review of impacts due to sea level rise, strategies to address impacts on environmental and historic resources, and improvements to traffic circulation, wayfinding, parking and drainage within the study area.”
Contact: Jennifer E. Reczek, P.E.
Jennifer.Reczek@dot.nh.gov
Telephone: (603) 271-3401

Combined Public Officials/Public Informational Meeting
March 2, 2021 at 6 pm via Zoom

  • Presentation
  • Meeting Information

    The NHDOT will be holding a combined Public Officials/Public Information Meeting to discuss this project, which will make transportation improvements to NH 1A in the Town of Hampton. The initial study area will extend 3.5 miles from the Neil R. Underwood Memorial Bridge to NH 27 (High Street), with specific project type(s) and location(s) to be determined during the early stages of the project.

    During the meeting, the project team will use Zoom breakout rooms to facilitate discussion and allow us to hear from more people. There will be three rooms, with each one discussing a separate section of the corridor. To help us plan for and staff the rooms, we ask that you do two things ahead of time:

    1. Please register in advance of the meeting at: https://zoom.us/meeting/register/tJwsf-morz8tG9CXIL8kEN_uf-_AjdCKZauJ

      After registering, you will receive a confirmation email containing information about joining the meeting. You may register up until the start of the meeting.

    2. Please e-mail oceanblvd@fhiplan.com with the name you used to register and your choice of breakout room:
      • Segment 1 – NH 1A from State Park Driveway at South Beach to NH 101 (Church Street),
      • Segment 2 – NH 1A north of NH 101 (Church Street) through the NH 101E (Winnacunnet Road) intersection, or
      • Segment 3 - NH 1A north of NH 101E (Winnacunnet Road) through the NH 27 (High Street) intersection

    We understand that some people may be interested in several segments, but for this meeting please choose the one that is most important to you. A recap of the discussion in each room will be shared with all attendees, and any topics that may have been missed can be submitted on the project Wikimap (see link under Project Survey), or e-mailed to the project team at oceanblvd@fhiplan.com.

Available Files:  
Project Survey
Project Advisory Committee (PAC)
Meeting #1
October 29, 2020