Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Andover 20650 Status:Design
Scope of Work: Replace two bridges on NH 11 in Andover, one over the Northern Rail Trail (NHRR) (206/137) and one over Sucker Brook (208/137). The project location is approximately 5.8 miles east of US Route 4.
Contact: Timothy Dunn, P.E.
Timothy.D.Dunn@dot.nh.gov
Telephone: (603) 271-1618
Available Files:  
Public Informational Meeting
Andover Selectman’s Office
September 29, 2022
6:00 PM
Public Officials Meeting
(as part of the Selectmen’s Meeting)
March 21, 2022

 





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire