Below is a listing of Possible Action Projects anticipated for the 6 month period from January 2020 to June 2020. These may be Qualifications-Based contracts for consideration by the Consultant Selection Committee, or Low-Bid contracts which will be awarded to prequalified firms by low-bid in accordance with the procedures developed by the Bureau requiring services. This list is for information purposes only. For projects that the Department is seeking letters of interest please go to the Projects Soliciting for Interest page.

Construction:

  • Statewide On –Call Construction Engineering and Inspection - $1,500,000 each (3 contracts)

Bridge Design:

  • Statewide Complex Bridge Inspection and Emergency Response - $750,000 (1 contract)
  • Campton 41472 – NH49 bridge over Pemigewasset River (124/129) Part A
  • Rollinsford-Dover 42578 – Oak Street over Pan Am Railroad (069/046) Part A
  • Statewide Bridge Design On-Call - $1,000,000 each (4 contracts)

Highway Design Needs:

  • Bedford 4066 - US 3 Widening from Hawthorne Dr. north to Manchester Airport Access Rd.
  • Statewide Highway Design On-Call - $1,000,000 each (4 contracts)
  • Statewide Highway Design On-Call for Rail Crossings - $500,000 (1 contract)
  • Statewide Corridor Study Program Management - $500,000 (1 contract)
  • Statewide Highway Design On-Call SUE- $500,000 (1 contract)

Rail:

  • Develop/Update of the State’s Rail Plan, last plan update was 2012.