This is the document library for the Bureau of Aeronautics. All plans, reports and files originating from this bureau are listed below. Looking for information relating to aeronautics that isn't listed here? Contact
Bureau of Aeronautics.
- Aircraft Registration Forms
|
|
- Airport and Pilot Information
|
|
|
|
Business Information |
OE/AAA Workshop – October 15, 2015
The OE/AAA workshop focused on the requirements and process of the OE/AAA electronic filing system. Workshop materials can be found here:
2015 New Hampshire Aeronautics Program Conference - May 8, 2015
The topics of the 2015 New Hampshire Aeronautics Program Conference ranged from the functions of the Bureau, the 2015 State Airport System Plan overview, and aircraft registration explanations to Airport Block Grant Program (AGBGP) and non-ABGP project tips and expectations. The presentation and additional reference materials are available in pdf format.
- Airports
- Aviation Regulations
- Chapters 422-424:
- Chapter 422: New Hampshire Aeronautics Act
- Chapter 422-A: Aircraft Financial Responsibility (repealed)
- Chapter 422-B: Control of Tall Structures
- Chapter 422-C: Abandoned Aircraft
- Chapter 423: Municipal Airports
- Chapter 423-A: Airport Property Tax Base Sharing
- Chapter 424: Airport Zoning
|
|
Engineering/Technical Information |
Airport Approach Plan Study
In 2018, NHDOT/Bureau of Aeronautics wrapped up a study to produce updated airport approach plans, sample airport zoning ordinances, and an interactive tool to quickly evaluate the allowable construction heights of structures within airports’ protected airspace surfaces. For more information, please visit Airport Approach Plan Study.
Research Report:
- Phase I - Improve the Quality and Service Life of Water-based Pavement Marking Paints on Pavements with High-Iron Aggregates
In 2015, the final report was published detailing the cause and possible mitigation for minimizing the rust staining of white pavement markings at airports.
- Phase II - Airport Pavement Paint Study Implementation & Evaluation
In 2020, the final report, summary handout, and a possible modification to FAA pavement paint specifications were published detailing the case studies that evaluated different pavement paint and bead preparations that could minimize the rust staining of white pavement paint markings at airports.
2015 New England Region’s General Aviation Airport Assessment
The following are the findings of the assessment of general aviation airports all across New England that was completed in September 2015:
2015 State Airport System Plan
The following are the final deliverables for the 2015 State Airport System Plan.
- Regional Public Information Meetings
- 2003 State Airport System Plan - Technical Report
|
Unmanned Aircraft Systems |
2019 Use of Unmanned Aircraft Systems to Increase Safety and Decrease Costs of Transportation Projects and/or Related Tasks
In 2019, a research report on “Use of Unmanned Aircraft Systems to Increase Safety and Decrease Costs of Transportation Projects and/or Related Tasks” was completed. This report was funded in part with a FHWA Statewide Planning and Research grant and includes case studies of possible UAS operations or tasks of work efforts currently undertaken without UAS within various New Hampshire state agencies. Various final deliverable formats were also provided as examples of what can be done once the UAS has collected the data.
|
|