Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
June 23, 2020
Contacts:
Andrew Hall, Bridge Maintenance Bureau, (603) 271-3667
Eileen Meaney, Chief Communications Officer, (603) 271-6495
Daytime Closure of the Saco River Covered Bridge in Conway
Closure Necessary for Inspection and Maintenance Work

The New Hampshire Department of Transportation announces the planned temporary closure of the Saco River Covered Bridge in Conway on Monday, June 29, 2020 to perform inspection and maintenance work on the timber decking.

The covered bridge which carries East Side Road over the Saco River will be closed to traffic from 7:00 am until 2 pm. Signs on East Side Road will alert motorists to the temporary closure.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire