Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
May 20, 2020
Contacts:
Levi Byers, Bridge Maintenance Bureau, (603) 419-9694
Eileen Meaney, Chief Communications Officer, (603) 271-6495
Daytime Bridge Work on the Spaulding Turnpike in Dover
The Work will require Temporary Ramp and Lane Closures for Three Days

The New Hampshire Department of Transportation (NHDOT) maintenance crews will be making required repairs to the Spaulding Turnpike Bridge over NH 108 in Dover, NH beginning on May 26, 2020.

The work will be done from 9:00 am - 5:00 pm and is expected to be completed, weather permitting, on May 28, 2020.

During the day the Spaulding Turnpike southbound will be reduced to one lane at the Exit 7 interchange and the on ramp will be closed. NH 108 traffic seeking to enter the Spaulding Turnpike southbound ramp will be directed via signs and messages boards to use the Spaulding Turnpike northbound on ramp and reverse direction at Exit 8. Steel plates will be left in the travel way during off work hours.

Motorists are advised to reduce speeds and follow signs, message boards, and traffic cones through the work zone.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire