Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
August 6, 2019
Contacts:
Tim Boodey, Bridge Maintenance Bureau, (603) 271-6779
Richard Arcand, Program Specialist, (603) 271-0799
Pier Repair Work on NH Route 26 Bridge in Colebrook
Bridge will be Restricted to One Lane of Traffic Controlled by means of Temporary Traffic Signals.

On Wednesday, August 7, 2019, crews from the New Hampshire Department of Transportation will begin repairing the bridge on NH Route 26 (also known as Bridge Street) across the Connecticut River from Colebrook, NH to Lemington, VT.

This work will make substantial repairs to the pier in the center of the span. During this time traffic over the bridge will be restricted to one 12 foot wide lane.

Traffic will be controlled by means of temporary traffic signals located on NH 26 and VT 102. The signals will operate 24/7. The lane restriction will begin on Wednesday, August 7, 2019 and the work is expected to be finished before October 30, 2019.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire