Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
May 2, 2019
Contacts:
Duane Call, Construction Bureau, (603) 331-1508
Bill Boynton, Public Information Officer, (603) 271-6495
Bridge Replacement Project Beginning in Lancaster
Rogers Rangers Bridge Carrying US 2 Over Connecticut River

The New Hampshire Department of Transportation announces construction work is beginning on the replacement of the Rogers Rangers Bridge that carries US Route 2 over the Connecticut River between Lancaster, NH and Guildhall, VT.

The new bridge will be constructed offline and upstream, with traffic maintained on the existing bridge during construction. Roadway work will include new bridge approaches and a reconstructed intersection in Vermont.

The existing Rogers Rangers Bridge was built in 1950 and is on the State Red List.

Beck & Bellucci Inc. of Franklin, New Hampshire is the prime contractor for the $10,086,473 project. The interim completion date for traffic to be shifted onto the new bridge is October 2020. The final completion date is June 2021.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire