Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
April 25, 2019
Contacts:
Levi Byers, Bridge Maintenance Bureau, (603) 271-3667
Bill Boynton, Public Information Officer, (603) 271-6495
Bridge Repairs in Brookline to Require Single Lane Traffic
Deck Replacement on Pepperell Road Over Rocky Pond Brook

The New Hampshire Department of Transportation announces bridge repairs are scheduled to begin May 6, 2019 in Brookline on the Pepperell Road Bridge over Rocky Pond Brook.

This bridge deck replacement project is expected to take three months to complete and will require single lane, alternating traffic controlled by Stop and Yield signs. The available travel width will be 10 feet.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire