Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
October 30, 2018
Contacts:
Nick Goulas, Bridge Design Bureau, (603) 271-7341
Bill Boynton, Public Information Officer, (603) 271-6495
NH Route 11 Bridge Inspection in Charlestown Will Affect Traffic


The New Hampshire Department of Transportation announces an in-depth inspection of the bridge carrying NH Route 11 over the Connecticut River between Charlestown, New Hampshire and Springfield, Vermont is scheduled to begin Monday, November 5, 2018.

The NH 11 bridge will have lane closures as needed and as weather permits from 7:30 am to 4:00 pm daily for up to five days. The available lane width on the bridge will be 11 feet during the inspection time periods.

Flag persons, and warning signs will be used to notify motorists of the lane closure. Motorists traveling between Charlestown and Springfield are asked to use alternate routes if possible to avoid delays.

In the event of adverse weather, the inspection work may be delayed until the next suitable workday.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire