Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
October 19, 2017
Contacts:
Jeffrey Potter Construction Bureau, 603-520-7802
Bill Boynton, Public Information Officer, 603-271-6495
Interstate 89 Ramp Closure at Exit 15 in Enfield
Southbound on-ramp closed on 10/23 for culvert work

The New Hampshire Department of Transportation (NHDOT) announces the planned closure of the I-89 Exit 15 southbound on-ramp in Enfield on Monday, October 23, 2017 between the hours of 7:00 am and 7:00 pm to allow for the repair of a culvert that crosses the ramp.

The signed detour during the ramp closure will be to travel north from Exit 15 to Exit 16 to reverse direction.  It is approximately 1.5 miles between Exit 16 and Exit 15. This work will be weather dependent and may be postponed if there is inclement weather.

This pavement preservation project on Interstate 89 in Grantham and Enfield includes the ramps at Exits 14 and 15, as well as some drainage work, rock scaling, and bike path paving. Pike Industries, Inc. of Belmont, New Hampshire is the general contractor for the $3.4 million project, which has a completion date of June 29, 2018.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire