Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
June 28, 2017
Contacts:
Tim Boodey, Bridge Maintenance Bureau, 603-271-3667
Bill Boynton, Public Information, 603-271-6405
Temporary Closures of Covered Bridges in Conway and Jackson
Bridge Washing Work Scheduled for Mornings of July 5 and 6

The New Hampshire Department of Transportation (NHDOT) announces planned bridge washing work on covered bridges in Conway and Jackson will require separate morning closures of the two bridges to traffic.

The Conway Covered Bridge on East Side Road over the Saco River will be closed to traffic on Wednesday, July 5, 2017 from 8:00 am until 12:00 pm.

The Jackson (Honeymoon) Covered Bridge on NH 16A over the Ellis River will be closed to traffic on Thursday, July 6 from 8:00 am until 12:00 pm.

Posted signs will alert motorists to the temporary bridge closures.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire