Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
August 16, 2016
Contacts:
Andrew Hall, Bridge Maintenance Bureau, 603-271-3667
Bill Boynton, Public Information Office, 603-271-6495
Bridge Work on NH Route 25C in Warren
Alternating One-Way Traffic Over Black Brook

The New Hampshire Department of Transportation (NHDOT) announces bridge work is getting underway this week on the NH Route 25C bridge over Black Brook in Warren. This is located in the area known as Warren Flats.

This installation of a concrete box culvert is expect to take two and a half months to complete. During construction, traffic will be restricted to alternating one-way controlled by Stop and Yield signs 24 hours a day, seven days a week. The single lane width will be 12 feet. This traffic configuration is expected to be in effect on August 25th.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire