Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
July 5, 2016
Contacts:
Andrew Silovich, Construction Bureau, 603-933-2028
Bill Boynton, Public Information Office, 603-271-6495
US Route 4 Bridge Reconstruction Project in Canaan
Alternating One-Way Traffic Over Mascoma River

The New Hampshire Department of Transportation announces a planned lane width change at the US Route 4 bridge project over the Mascoma River in Canaan.

Alternating one-way traffic controlled by temporary signals, which has been in place since April 2016, will remain in effect until mid-September 2016. Effective Friday, July 8, the lane width will be reduced from 12 feet to 11 feet 9 inches wide.

The project consists of a complete concrete deck replacement of the US 4 bridge, as well as additional repairs to the concrete abutments. Miller Construction of Windsor, Vermont is the contractor for the $1.0 million project, which has a final completion date of October 26, 2016.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire