Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
June 29, 2016
Contacts:
Jay Levine, Construction Bureau, 603-890-1661
Bill Boynton, Public Information Office, 603-271-6495
Night Work on I-93 Between Exit 3 and Exit 4 in Derry and Windham
I-93 Southbound Lane Closure for Three Nights

The New Hampshire Department of Transportation announces night work associated with the construction of Interstate 93 southbound in Derry and Windham, from mile marker 10.6 to 10.8. This area is 3/4 of a mile south of the Exit 4 interchange.

Weather permitting; night construction operations will take place Tuesday, July 5 through Thursday, July 7 from approximately 7:00 pm to 5:00 am each night. The work will consist of drainage and paving across the existing southbound travel lanes.

These construction operations will require traffic on Interstate 93 to be reduced to one lane utilizing a lane closure. Motorists should remain alert while traveling through the construction zone and obey all posted signs.

This work is part of the $49 million I-93 widening and reconstruction project located between exits 3 and exits 4. The general contractor is R.S. Audley, Inc. from Bow, New Hampshire.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire