Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
May 4, 2016
Contacts:
Tim Boodey, Bridge Maintenance Bureau, 603-496-5059
Bill Boynton, Public Information Office, 603-271-6495
Bridge Repairs on NH Route 13 in New Boston
Single Lane Traffic Over South Branch of Piscataquog River

The New Hampshire Department of Transportation (NHDOT) announces bridge repairs are scheduled to begin Monday, May 16, 2016 on the NH Route 13 bridge over the South Branch of the Piscataquog River in New Boston.

This bridge deck maintenance work is expected to take three months to complete and will require single lane (11 ft.) alternating traffic controlled by a temporary signal.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire