Media Center > Special Projects > Northern Pass
Although the NHDOT handles many requests from utility companies, none have generated more attention than the Northern Pass Transmission (NPT) project.
egg

This webpage was developed to explain the NHDOT's role in relation to a utility's (gas, water, sewer, electricity, and telecomm) request to use a State asset (bridge, rail bed, road or highway right of way), and to provide detailed information about the requests submitted by NPT.

DOT's Role

Per State Statute the DOT has a dual role in applications submitted to the Site Evaluation Committee (SEC). The first is as a member of the committee to decide whether or not a new energy facility will be permitted. The second role is as a state agency that has permitting or other regulatory authority but only as it relates to the proposed project and impacts to transportation assets. These two roles are completely separate and must be kept completely separate. Therefore, the DOT member of the committee is not part of the staff reviewing the application for compliance with DOT rules and regulations. The staff conducting those reviews evaluate the proposal like any other utility that may impact transportation facilities. They do not evaluate the merits of the project – that is up to the SEC.

What's New

6/18/2018 - Final Survey Reports were added.

2/14/2018 - Survey documents added.

1/30/2018 - New Surveys added.

1/9/2018 - December 2017 meeting documents were added.

11/29/2017 - Draft Survey Reports and responses to Exception Request 3 (Rev 4), and 4 (Rev 4) were added.

10/23/2017 - October 2017 meeting documents were added.

10/20/2017 - TCC Determination Memo, and Corridor Maps were added.

10/3/2017 - NHDOT's Approval of the Proposed Survey Procedure was added.

9/29/2017 - September 2017 meeting documents were added.

9/6/2017 - August 2017 meeting documents were added.

9/5/2017 - A letter to the Town of Easton was added.

8/29/2017 - The original NPT Exception Requests were added.

8/18/2017 - Survey Report Information was added.

8/8/2017 - NPT Exception Requests and DOT Responses were added.

8/2/2017 - July 2017 meeting documents were added.

6/22/2017 - An excavation permit (Easton Rt 116) was added.

6/20/2017 - February and April meeting documents were added.

4/4/2017 - Response Letters (DOT Comments to Design Submissions) to NPT Contractor were added.

2/1/2017 - January 2017 meeting documents were added.

12/23/2016 - November 2016 meeting documents were added.

12/7/2016 - October 2016 meeting documents were added.

11/9/2016 - Added additional Borehole Log Files.

10/18/2016 - Added Borehole Log Files. Added September 2015 Conference Report.

10/07/2016 - September 2016 Agenda, Conference Report and Schedules were added.

September 2016 - This page was developed, links and documents were added. Questions? Please call 603-271-6495 or email the Public Information Office.

September 2016 - Agendas and the Reports from several Design Conferences with the utility were added.

September 2016 - Excavation Permits and other documents were added.

Answers to Frequently Asked Questions

  • Does the NHDOT approve water, gas, or electricity projects?
    • NO - The NHDOT approves applications for access or use of State Assets (State Roads, Bridges, Right of Way areas), for driveways, excavation (for maintenance or exploration) and poles. Learn more about these applications.
  • Will the NHDOT approve the NPT?
    • NO - The NHDOT does not decide if a facility will be built. The NHDOT does decide how it will be built in and around the NH transportation network if the project is approved by the SEC.
  • Is the Commissioner of the Transportation Department a Member of the NH Site Evaluation Committee (SEC)?
    • YES - The commissioner is a member of the site evaluation committee which was established by state statutes (RSA 162-H). The committee is the body that will determine if an energy facility will be permitted. In order to maintain the separation of the two roles Commissioner Sheehan has delegated the responsibility for this project to Assistant Director of Project Development William Oldenburg. The Commissioner is not involved in the NPT subcommittee deliberations.

Applications to access or use State Roads, Bridges, Right of Way Areas

Driveway Permits - Residents and utilities often apply for access (a driveway) on State roads. These applications are evaluated and approved by the District Engineers.

Excavation Permits - Utilities that want or need to install gas, water, sewer or electric facilities need to apply for an excavation permit. These applications are evaluated and approved by the District Engineers.

October 2016

Easton Rt 116

June 2016

Campton Rt 3, Plymouth Rt 3, Thornton Rt 3, Woodstock Rt 3

May 2016

Bethlehem Rt 116 & 18, BridgewaterEaston Rt 112, Easton Rt 116, Franconia Rt 116, Franconia Rt 116 & 18, Stewartstown, Woodstock Rt 3, Sugar Hill Rt 116 & 18

April 2016

Bethlehem Rt 116 & 18, Bethlehem Rt 302, Bridgewater Rt 3, Easton Rt 112, Easton Rt 116, Franconia Rt 116, Franconia Rt 116 & 18, Thornton Rt 3, Woodstock Rt 112, Woodstock Rt 112, Sugar Hill Rt 116 & 18

December 2015

Bethlehem Rt 18, Campton Rt 3, Easton Rt 112, Easton Rt 116, Franconia Rt 116, Thornton Rt 3, Sugar Hill Rt 18, Woodstock Rt 112, Woodstock Rt 3, Woodstock Rt 3

Encroachment Permits are permits that are identical to the Excavation Permits except that they are issued by the NHDOT Turnpikes Bureau.

Additional information can be found in the Department's Utility Accommodation Manual.


Borehole Log Files and Geotechnical Reports

NPT Master Boring Locations (This is a Geo Location File: Google Earth or another Geo Location application is required to open this document).


Design Conferences

December 2017 - Agenda, Report

October 2017 - Agenda, Report

September 2017 - Agenda, Report, Approval of the Proposed Survey Procedure

August 2017 - Agenda , Report

July 2017 - Agenda , Report

April 2017 - Agenda, Report

February 2017 - Agenda, Report

January 2017 - Design Conference Agenda, Report

November 2016 - Design Conference Agenda, Report, Field Work Schedule

October 2016 - Design Conference Agenda, Report, Field Work Schedule

September 2016 - Design Conference Agenda, Report, Design Schedule, Field Work Schedule

July 2016 - Design Conference Agenda, Report

June 2016 - Design Conference Agenda, Report

May 2016 - Design Conference Agenda, Report

April 2016 - Design Conference Agenda, ReportDOT Comments

March 22, 2016 - Design Conference Agenda, Report

March 1, 2016 - Design Conference Agenda, Report

September 1, 2015 - Design Conference Agenda, Report

March 4, 2015 - Design Conference Report


Exception Requests and Notice of Decisions

NPT Cover Letter for Group 1 Requests

Request Number Notice of Decision
Exception Request 1, Rev 2 Responses to ER 1-11b
Exception Request 2, Rev 2  
Exception Request 3, Rev 2 Responses to ER 3-37
Exception Request 3, Rev 3  
Exception Request 3, Rev 4 Response to ER 3, Rev 4
Exception Request 4, Rev 2  
Exception Request 4, Rev 3  
Exception Request 4, Rev 4 Response to ER 4, Rev 4
Exception Request 5, Rev 2  
Exception Request 5, Rev 3  
Exception Request 6, Rev 1  
Exception Request 6, Rev 2  
Exception Request 7, Rev 1  
Exception Request 9, Rev 1  
Exception Request 9, Rev 2  
Exception Request 10, Rev 1  
Exception Request 11a, Rev 2  
Exception Request 11b, Rev 2  

NPT Cover Letter for Group 2 Requests

Request Number Notice of Decision
Exception Request 12 Responses to ER 3-37
Exception Request 13  
Exception Request 15  
Exception Request 16  
Exception Request 17  
Exception Request 18  
Exception Request 20  
Exception Request 22 Rev 1  
Exception Request 23 Rev 1  
Exception Request 31 Rev 1  
Exception Request 34  
Exception Request 36  
Exception Request 37  

NPT Cover Letter for Group 3 Requests

Request Number Notice of Decision
Exception Request 39 Rev 1 Responses to ER 39-58
Exception Request 40 Rev 1  
Exception Request 41  
Exception Request 42 Rev 1  
Exception Request 45  
Exception Request 47  
Exception Request 48  
Exception Request 52 Rev 1  
Exception Request 54  
Exception Request 55  
Exception Request 56 Rev 1  
Exception Request 58 Rev 1  

NPT Group 4 Requests

Request Number Notice of Decision
Exception Request 64  
Exception Request 65 Rev 1  
Exception Request 67 Rev 1  
Exception Request 69  
Exception Request 70 Rev 1  
Exception Request 73  
Exception Request 74 Rev 1  
Exception Request 77 Rev 1  
Exception Request 79 Rev 1  
Exception Request 82  
Exception Request 83 Rev 1  
Exception Request 85 Rev 1  
Exception Request 89 Rev 1  
Exception Request 93 Rev 1  
Exception Request 95 Rev 1  

NPT Group 5 Requests

Request Number Notice Decision
Exception Request 97  
Exception Request 98  
Exception Request 99 Rev 1  
Exception Request 100  

NPT Group 6 Requests

Request Number Notice Decision
Exception Request 101  
Exception Request 102  
Exception Request 103  
Exception Request 104  
Exception Request 106  
Exception Request 107  
Exception Request 108  
Exception Request 110  
Exception Request 114  

NPT Group 7 Requests

Request Number Notice Decision
Exception Requests 115  
Exception Requests 117  
Exception Requests 119  
Exception Requests 121  
Exception Requests 122  
Exception Requests 123  
Exception Requests 124  
Exception Requests 125  
Exception Requests 129  
Exception Requests 130  
Exception Requests 131  
Exception Requests 134  
Exception Requests 136  

NPT Cover Letter for Group 8 Requests

Request Number Notice Decision
Exception Request 137  
Exception Request 138  
Exception Request 140  
Exception Request 141  
Exception Request 142  
Exception Request 144  
Exception Request 145  
Exception Request 146  
Exception Request 147  
Exception Request 148  
Exception Request 149  
Exception Request 150  
Exception Request 151  

NPT Cover Letter for Group 9 Requests

Request Number Notice Decision
Exception Request 153  
Exception Request 154  
Exception Request 155  
Exception Request 157  
Exception Request 159  
Exception Request 160  
Exception Request 161  
Exception Request 162  
Exception Request 164  
Exception Request 165  
Exception Request 168  

NPT Cover Letter for Group 10 Requests

Request Number Notice Decision
Exception Request 169  
Exception Request 170  
Exception Request 171  
Exception Request 172  
Exception Request 173  
Exception Request 175  

NPT Cover Letter for Group 11 Requests

Request Number Notice Decision
Exception Request 178a  
Exception Request 178b  
Exception Request 179  
Exception Request 180  
Exception Request 182  
Exception Request 183  
Exception Request 184  
Exception Request 185  


Links to other Web Pages:


Other Documents

Survey Reports, Responses

Traffic Management Information





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire