Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
October 29, 2014
Contacts:
Brian Wilmot
Construction Bureau
(603) 738-4451
Public Information Office
(603) 271-6495
Toll Plaza Removal at Exit 12 in Merrimack
Ramp Closures Necessary on November 1

The New Hampshire Department of Transportation (NHDOT) announces work associated with the removal of the Exit 12 Toll Plaza in Merrimack will require periodic ramp closures on Saturday, November 1, 2014.

To allow for the removal of the toll plaza canopy, the northbound off-ramp and the southbound on-ramp will be closed for periods of time on November 1 between 8:00 am and 4:00 pm. Message boards will alert motorists to the closures and detours will be in effect.

Toll collection operations at the Exit 12 Plaza on the Everett Turnpike in Merrimack ceased at 9:00 pm on Friday, July 18, 2014.

R.M. Piper, of Plymouth, New Hampshire is the general contractor for the $388,000 project, which is scheduled to be completed in December 2014.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire