Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

NEWS RELEASE

For Immediate Release
July 9, 2014
Contacts:
Steve Johnson
Bridge Maintenance Bureau
(603) 271-3667
Bill Boynton
Public Information Office
(603) 271-6495
Bridge Repair Work Scheduled in Merrimack
Wire Road Bridge Over The Everett Turnpike

The New Hampshire Department of Transportation announces bridge repairs are scheduled to begin July 17th on the Wire Road Bridge over the Everett Turnpike in Merrimack.

This expansion joint, deck patching, and abutment repair work is expected to take up to four weeks to complete. Temporary traffic signals will be in place to allow for one-way alternating traffic.






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2015. State of New Hampshire