Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Statewide Rumble Strips 26842
Scope of Work: Installation of centerline rumble strips and shoulder rumble stripes along sections of NH Route 125 from Plaistow to Rochester and replacement of rumble strips impacted by pavement preservation projects on other routes statewide.
Contact: Ronald Grandmaison, P.E.
Telephone: (603) 271-6198
Available Files:
Kingston Board of Selectman Meeting September 16, 2013
Lee Public Informational Meeting
September 11, 2013
Epping Board of Selectman Meeting
September 3, 2013
Plaistow-Kingston
Public Informational Meeting
August, 28, 2013

Epping-Brentwood
Public Informational Meeting
August 13, 2013





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire