Public Information - Rochester 10620D
 

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!  Unless noted otherwise, files are in Portable Document Format (PDF). pdfViewing PDF files requires Adobe Acrobat Reader. Click here for more information.

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project:
Rochester 10620D
Scope of Work: scope Spaulding Turnpike expansion from Exit 11 to Exit 16
Contact: contact

Robert Landry, P.E.

Telephone: (603) 271-3725

Available Files:

 

  file Overall Rochester Corridor - Color Plan, December 10, 2007 | Color Plan w/Aerial April 28, 2008
  file 10620G - Construct two new SB lanes from the Rochester Tollbooth through Exit 11, 12 and Phase 1 of the Mitigation site.
  file 10620K - March 18, 2008 - Rehabilitate the existing two lanes from the Rochester Tollbooth through Exit 11 and 12.
  file 10620H - February 29, 2008 - Construct two new lanes and rehab the existing 2 lanes through Exit 13.
  file 10620H (202) - Larger scale of US 202 (Washington Street)
  file 10620I - February 11, 2008 - Rehabilitate the associated local roads in the area of Exit 14 and Exit 15 and Phase 2 of the Mitigation site.
  file 10620L - February 11, 2008 - Construct two new lanes and rehab the existing two lanes through Exit 14 and Exit 15.
  file 10620J - Construct two new lanes and rehab the existing two lanes through Exit 16.
  file 10620J - Chestnut Hill
Documents:  

 

  file Public Informational Meeting April 30, 2008
  file Report of the Commissioner - Public Hearing dated June 13, 2000
     
    Smart Work Zone
This Smart Work Zone website link provides the traveling public an Internet location to view the messages displayed on the message signs, the speeds measured through the work zone and an image of the traffic on the turnpike.
Current construction efforts exist from the Rochester toll booth thru Exit 12.

 