Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Project Information > Project Specific Information

Public Hearing plans, meeting notes and other project-specific documents for Department of Transportation road and bridge projects are available for viewing or download here. Depending on your Internet connection, larger files may take several minutes to download. Please Be Patient!

Note: The documents available below are for informational purposes only and should not be considered as final or complete unless otherwise noted.

Project: Portsmouth-Kittery 13678E Status: Complete
Scope of Work: US 1, US 1 Bypass, I-95, Connection Study for Memorial Bridge, Sarah Mildred Long Bridge, and High-Level Bridge over Piscataqua River.
Contact: Robert Landry, P.E.
Telephone: (603) 271-3921
Final Report
January 31, 2011

Appendices are available upon request

Memorial Bridge

Inspection Report

Sarah Mildred Long Bridge

Inspection Report





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire