Project Development > Right Of Way > Customer Surveys
| Project: | Tilton 12635 |
|---|---|
| Description: | E Main St (US 3/NH 11), construct 1400 ft. of sidewalk on N side of E Main St. from Agway Dr. to the existing sidewalk at Grant St. and reconstruct 1400 ft. sidewalk along US 3/NH 11 with 4 ft. shoulders on both sides |
| Acquisition Surveys distributed: | 4 |
| Acquisition Surveys received: | 4 |
| Results: | 1 | 2 | 3 | 4 | |
| Relocation Surveys distributed: | |
| Relocation Surveys received: | |
| Results: |