Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit
Aeronautics, Rail and Transit > Rail and Transit > Plaistow Commuter Rail Extension Study
The New Hampshire Department of Transportation (NHDOT) is undertaking a study of alternatives for a potential extension of MBTA commuter rail service from Haverhill, MA to the Plaistow, NH area. The study, which will be conducted by the Department in partnership with Plaistow, Atkinson, and the Rockingham Planning Commission, will examine potential alternatives for a train station and layover facility, and their resultant impacts, including cost-benefit analysis and ridership projections. The NHDOT has engaged a team of design and planning professionals, led by HDR Engineering, to identify possible sites, develop design concepts, and analyze their potential impacts.

UPCOMING PROJECT MEETINGS (final time, specific date & location will be updated as scheduled):

  • Project Advisory Committee Meeting #5: December 16, 2014 @ 1pm @ Atkinson Town Hall
    • Discussion on screening process and identification of Draft Recommended Alternative for Layover Facility & Rail Station, Ridership Estimates, Noise & Vibration, Economic Impacts
  • Public Informational Meeting #3: Planned for mid to late January 2015 timeframe
    • Review of Draft Recommended Alternative for Layover Facility & Rail Station, Cost & Ridership Estimates, Noise & Vibration Analysis, and Economic Impacts
  • Project Advisory Committee Meeting #6: Tentatively planned for mid March 2015
    • Review of Environmental Assessment, which includes Recommended Alternative for Layover Facility & Rail Station and any proposed mitigation
  • Environmental Assessment Public Hearing: Tentatively planned for mid to late March 2015
    • Review of Environmental Assessment, which includes Recommended Alternative for Layover Facility & Rail Station and any proposed mitigation

Note: Project Advisory Committee (PAC) meetings will only allow public comment at the start of the meeting and then will become working group meetings that will only allow discussions to occur between PAC members, NHDOT staff, and the consulting team.

facebook icon

PROJECT ADVISORY COMMITTEE (PAC) MEMBERS:

  • Town of Plaistow – Sean Fitzgerald; (Alternate: Tim Moore)
  • Town of Atkinson – David Harrigan; (Alternate: Robert Clark)
  • Rockingham Planning Comm. - Cliff Sinnott; (Alternate: Scott Bogle)
  • Merrimack Valley Planning Comm. – Todd Fontanella
  • Pan Am Railways – Cynthia S. Scarano
  • Northern New England Passenger Rail Authority – Patricia Quinn; (Alternate: Jim Russell)
  • Massachusetts Bay Transportation Authority – Joe Cosgrove; (Alternate: Ron Morgan)
  • City of Haverhill - Invited (no representative named yet)

PREVIOUSLY HELD PROJECT ADVISORY COMMITTEE (PAC) MEETINGS

PUBLIC MEETINGS

Public Informational Meeting #1 was held on May 22, 2014 @ 7pm @ Plaistow Town Hall

A Project Listening Session was held on Thursday, August 22, 2013 @ 7pm at Plaistow Town Hall

If you have QUESTIONS or COMMENTS about this study, please email PlaistowStudy@dot.state.nh.us





New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914

copyright 2009. State of New Hampshire