THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT IV 16164B AND RINDGE 24944 COUNTIES AND CODES: CHESHIRE 005 HILLSBOROUGH 011 DATE BIDS OPEN: FEBRUARY 27, 2013 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 23, 2013 A CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,604,537.50 B FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 1,723,445.00 C BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,725,700.00 D PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,726,362.50 E THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 1,954,465.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 214. FINE GRADING U 1. 9,000.00 9,000.00 19,000.00 19,000.00 17,000.00 17,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 5,000. 5.00 25,000.00 13.80 69,000.00 5.00 25,000.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12 IN DEEP (F) SY 18,000. 1.00 18,000.00 .88 15,840.00 .65 11,700.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 2,350. 13.25 31,137.50 16.40 38,540.00 8.00 18,800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 8,600. 69.00 593,400.00 65.40 562,440.00 73.00 627,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 105.00 7,875.00 180.00 13,500.00 125.00 9,375.00 403.6 PAVEMENT JOINT ADHESIVE LF 49,500. .25 12,375.00 .28 13,860.00 .25 12,375.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 9,400. 71.50 672,100.00 74.40 699,360.00 79.00 742,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 30,900. 1.50 46,350.00 1.95 60,255.00 1.50 46,350.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 1,050. 22.00 23,100.00 17.00 17,850.00 24.00 25,200.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 200.00 1,200.00 1,200.00 7,200.00 250.00 1,500.00 692. MOBILIZATION U 1. 45,000.00 45,000.00 59,000.00 59,000.00 68,000.00 68,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 16164B PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 $1,604,537.50 $1,695,845.00 $1,725,700.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT IV 16164B AND RINDGE 24944 COUNTIES AND CODES: CHESHIRE 005 HILLSBOROUGH 011 DATE BIDS OPEN: FEBRUARY 27, 2013 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 23, 2013 A CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,604,537.50 B FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 1,723,445.00 C BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,725,700.00 D PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,726,362.50 E THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 1,954,465.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 214. FINE GRADING U 1. 17,500.00 17,500.00 3,300.00 3,300.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 5,000. 13.60 68,000.00 21.50 107,500.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12 IN DEEP (F) SY 18,000. .94 16,920.00 2.20 39,600.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 2,350. 13.95 32,782.50 9.50 22,325.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 8,600. 67.50 580,500.00 75.00 645,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 115.00 8,625.00 140.00 10,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 49,500. .23 11,385.00 .20 9,900.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 9,400. 76.00 714,400.00 91.10 856,340.00 417. COLD PLANING BITUMINOUS SURFACES SY 30,900. 1.50 46,350.00 2.00 61,800.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 1,050. 22.00 23,100.00 24.00 25,200.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 300.00 1,800.00 500.00 3,000.00 692. MOBILIZATION U 1. 85,000.00 85,000.00 50,000.00 50,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 16164B PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 $1,726,362.50 $1,954,465.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: RESURFACING DISTRICT IV 16164B AND RINDGE 24944 COUNTIES AND CODES: CHESHIRE 005 HILLSBOROUGH 011 DATE BIDS OPEN: FEBRUARY 27, 2013 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 23, 2013 A CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,604,537.50 B FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 1,723,445.00 C BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,725,700.00 D PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,726,362.50 E THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 1,954,465.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 214. FINE GRADING U 1. 9,000.00 9,000.00 20,000.00 20,000.00 -11,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 5,000. 5.00 25,000.00 13.00 65,000.00 -40,000.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12 IN DEEP (F) SY 18,000. 1.00 18,000.00 1.00 18,000.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 2,350. 13.25 31,137.50 13.00 30,550.00 587.50 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 8,600. 69.00 593,400.00 69.00 593,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 105.00 7,875.00 125.00 9,375.00 -1,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 49,500. .25 12,375.00 .25 12,375.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 9,400. 71.50 672,100.00 73.00 686,200.00 -14,100.00 417. COLD PLANING BITUMINOUS SURFACES SY 30,900. 1.50 46,350.00 1.50 46,350.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 1,050. 22.00 23,100.00 22.00 23,100.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 200.00 1,200.00 250.00 1,500.00 -300.00 692. MOBILIZATION U 1. 45,000.00 45,000.00 50,000.00 50,000.00 -5,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 16164B PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 $1,604,537.50 $1,675,850.00 -71,312.50