THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: GREENLAND-NORTH HAMPTON-MILTON 16363 COUNTIES AND CODES: STRAFFORD 017 ROCKINGHAM 015 DATE BIDS OPEN: FEBRUARY 28, 2012 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSEUCTION OF WORK COMPLETION DATE: SEPTEMBER 7, 2012 A PIKE INDUSTRIES, INC. 3 EASTGATE ROAD, BELMONT, NH 03220 $ 3,828,533.50 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 3,957,210.50 C CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 4,192,809.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,000. 10.00 20,000.00 10.00 20,000.00 10.00 20,000.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 22,125. 62.25 1,377,281.25 64.00 1,416,000.00 68.00 1,504,500.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 21,075. 60.50 1,275,037.50 64.00 1,348,800.00 68.00 1,433,100.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 200. 110.00 22,000.00 125.00 25,000.00 110.00 22,000.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 43,200. 1.00 43,200.00 .50 21,600.00 1.50 64,800.00 403.6 PAVEMENT JOINT ADHESIVE LF 319,000. .25 79,750.00 .25 79,750.00 .25 79,750.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 500. 66.50 33,250.00 64.00 32,000.00 75.00 37,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 193,000. 1.00 193,000.00 1.50 289,500.00 1.50 289,500.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 82,125. 1.45 119,081.25 1.30 106,762.50 1.25 102,656.25 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 115.00 2,875.00 110.00 2,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 50. 185.00 9,250.00 250.00 12,500.00 250.00 12,500.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 2. 185.00 370.00 250.00 500.00 350.00 700.00 604.72 GRATES & FRAMES, TYPE B EA 10. 300.00 3,000.00 500.00 5,000.00 300.00 3,000.00 608.26 6" CONCRETE SIDEWALK (F) SY 150. 35.00 5,250.00 75.00 11,250.00 40.00 6,000.00 609.5 RESET GRANITE CURB LF 500. 8.00 4,000.00 14.00 7,000.00 7.50 3,750.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 16363 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 619.1 MAINTENANCE OF TRAFFIC U 1. 49,500.00 49,500.00 30,000.00 30,000.00 45,000.00 45,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,400.00 4,800.00 2,400.00 4,800.00 2,000.00 4,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 10. 250.00 2,500.00 180.00 1,800.00 200.00 2,000.00 619.4111 WHITE MONO DIRECTIONAL TEMPORARY DURABLE RAISED PAVEMENT MARKERS EA 200. 1.00 200.00 1.25 250.00 2.00 400.00 619.4121 YELLOW MONO DIRECTIONAL TEMPORARY DURABLE RAISED PAVEMENT MARKERS EA 100. 1.00 100.00 1.25 125.00 2.00 200.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 400. 30.00 12,000.00 44.00 17,600.00 36.00 14,400.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 288,450. .11 31,729.50 .12 34,614.00 .11 31,729.50 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 6,160. 1.00 6,160.00 1.00 6,160.00 1.50 9,240.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 11,200. .42 4,704.00 .42 4,704.00 .42 4,704.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 3,000. 1.41 4,230.00 1.41 4,230.00 1.41 4,230.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 200. 3.95 790.00 3.95 790.00 4.00 800.00 692. MOBILIZATION U 1. 80,000.00 80,000.00 30,000.00 30,000.00 50,000.00 50,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 133,600.00 133,600.00 133,600.00 133,600.00 133,600.00 133,600.00 $3,828,533.50 $3,957,210.50 $4,192,809.75 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: GREENLAND-NORTH HAMPTON-MILTON 16363 COUNTIES AND CODES: STRAFFORD 017 ROCKINGHAM 015 DATE BIDS OPEN: FEBRUARY 28, 2012 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSEUCTION OF WORK COMPLETION DATE: SEPTEMBER 7, 2012 A PIKE INDUSTRIES, INC. 3 EASTGATE ROAD, BELMONT, NH 03220 $ 3,828,533.80 B BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 3,957,210.50 C CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 4,192,809.75 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,000. 10.00 20,000.00 19.00 38,000.00 -18,000.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 22,125. 62.25 1,377,281.25 65.00 1,438,125.00 -60,843.75 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 21,075. 60.50 1,275,037.50 65.00 1,369,875.00 -94,837.50 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 200. 110.00 22,000.00 125.00 25,000.00 -3,000.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 43,200. 1.00 43,200.00 1.00 43,200.00 403.6 PAVEMENT JOINT ADHESIVE LF 319,000. .25 79,750.00 .25 79,750.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 500. 66.50 33,250.00 72.00 36,000.00 -2,750.00 417. COLD PLANING BITUMINOUS SURFACES SY 193,000. 1.00 193,000.00 1.50 289,500.00 -96,500.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 82,125. 1.45 119,081.25 1.50 123,187.50 -4,106.25 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 100.00 2,500.00 1,250.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 50. 185.00 9,250.00 250.00 12,500.00 -3,250.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 2. 185.00 370.00 300.00 600.00 -230.00 604.72 GRATES & FRAMES, TYPE B EA 10. 300.00 3,000.00 375.00 3,750.00 -750.00 608.26 6" CONCRETE SIDEWALK (F) SY 150. 35.00 5,250.00 50.00 7,500.00 -2,250.00 609.5 RESET GRANITE CURB LF 500. 8.00 4,000.00 10.00 5,000.00 -1,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 16363 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 619.1 MAINTENANCE OF TRAFFIC U 1. 49,500.00 49,500.00 30,000.00 30,000.00 19,500.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,400.00 4,800.00 2,000.00 4,000.00 800.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 10. 250.00 2,500.00 200.00 2,000.00 500.00 619.4111 WHITE MONO DIRECTIONAL TEMPORARY DURABLE RAISED PAVEMENT MARKERS EA 200. 1.00 200.00 1.00 200.00 619.4121 YELLOW MONO DIRECTIONAL TEMPORARY DURABLE RAISED PAVEMENT MARKERS EA 100. 1.00 100.00 1.00 100.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 400. 30.00 12,000.00 15.00 6,000.00 6,000.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 288,450. .11 31,729.50 .11 31,729.50 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 6,160. 1.00 6,160.00 1.25 7,700.00 -1,540.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 11,200. .42 4,704.00 .85 9,520.00 -4,816.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 3,000. 1.41 4,230.00 1.75 5,250.00 -1,020.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 200. 3.95 790.00 6.00 1,200.00 -410.00 692. MOBILIZATION U 1. 80,000.00 80,000.00 68,260.00 68,260.00 11,740.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 133,600.00 133,600.00 133,600.00 133,600.00 $3,828,533.50 $4,084,047.00 -255,513.50