THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT I 16161A, CAMBRIDGE 14805 & STRATFORD 21386 COUNTIES AND CODES: CARROLL 003 COOS 007 GRAFTON 009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 28, 2012 A PIKE INDUSTRIES INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,426,752.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 12,900. 78.00 1,006,200.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 650. 85.00 55,250.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 125.00 6,250.00 403.6 PAVEMENT JOINT ADHESIVE LF 70,800. .24 16,992.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,700. 80.00 136,000.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 10,300. 80.00 824,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 10,800. 4.00 43,200.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 150. 150.00 22,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 3,000.00 3,000.00 618.7 FLAGGERS HR 1,600. 22.25 35,600.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 500.00 3,000.00 692. MOBILIZATION U 1. 150,000.00 150,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 6,760.00 6,760.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 6,000.00 6,000.00 1010.15 FUEL ADJUSTMENT $ 1. 22,000.00 22,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 90,000.00 90,000.00 $2,426,752.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: RESURFACING DISTRICT I 16161A, CAMBRIDGE 14805 & STRATFORD 21386 COUNTIES AND CODES: CARROLL 003 COOS 007 GRAFTON 009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 28, 2012 A PIKE INDUSTRIES INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 2,426,752.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 12,900. 78.00 1,006,200.00 74.50 961,050.00 45,150.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 650. 85.00 55,250.00 85.00 55,250.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 125.00 6,250.00 125.00 6,250.00 403.6 PAVEMENT JOINT ADHESIVE LF 70,800. .24 16,992.00 .30 21,240.00 -4,248.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,700. 80.00 136,000.00 74.50 126,650.00 9,350.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 10,300. 80.00 824,000.00 75.00 772,500.00 51,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 10,800. 4.00 43,200.00 3.00 32,400.00 10,800.00 559.4 ELASTOMERIC PLUG TYPE EXPANSION JOINT (F) LF 150. 150.00 22,500.00 125.00 18,750.00 3,750.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 618.7 FLAGGERS HR 1,600. 22.25 35,600.00 28.00 44,800.00 -9,200.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 500.00 3,000.00 450.00 2,700.00 300.00 692. MOBILIZATION U 1. 150,000.00 150,000.00 75,000.00 75,000.00 75,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 6,760.00 6,760.00 6,760.00 6,760.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 6,000.00 6,000.00 6,000.00 6,000.00 1010.15 FUEL ADJUSTMENT $ 1. 22,000.00 22,000.00 22,000.00 22,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 90,000.00 90,000.00 90,000.00 90,000.00 $2,426,752.00 $2,244,350.00 182,402.00