THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NEWINGTON-DOVER 11238M COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: JUNE 28, 2012 SCOPE OF WORK: WIDENING AND RECONSTRUCTION OF A SEGMENT OF THE SPAULDING TURNPIKE LOCATION: SPAULDING TURNPIKE (NH 16) COMPLETION DATE: JULY 17, 2015 A ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $43,155,392.45 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $45,719,260.62 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $46,435,160.05 D R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $46,937,813.25 E SARGENT CORPORATION 378 BENOCH ROAD, PO BOX 435, STILLWATER, MAINE 04489 $49,883,716.20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 38. 6,530.00 248,140.00 3,500.00 133,000.00 3,700.00 140,600.00 201.21 REMOVING SMALL TREES EA 110. 250.00 27,500.00 50.00 5,500.00 105.00 11,550.00 201.22 REMOVING LARGE TREES EA 2. 750.00 1,500.00 1,200.00 2,400.00 900.00 1,800.00 201.881 INVASIVE SPECIES CONTROL TYPE I SY 146,100. .42 61,362.00 .25 36,525.00 1.00 146,100.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 16,000. 1.00 16,000.00 .75 12,000.00 1.08 17,280.00 202.31 FILL ABANDONED PIPE CY 150. 150.00 22,500.00 250.00 37,500.00 140.00 21,000.00 202.32 FILL AND ABANDON STRUCTUR CY 21. 150.00 3,150.00 250.00 5,250.00 155.00 3,255.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 16,500. 6.00 99,000.00 6.50 107,250.00 8.25 136,125.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 1,200. 12.00 14,400.00 10.00 12,000.00 16.75 20,100.00 202.43 REMOVAL OF EXIST. ASBEST. CEMENT PIPE, 0-24" DIAM. LF 428. 23.55 10,079.40 35.00 14,980.00 19.00 8,132.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 85. 250.00 21,250.00 175.00 14,875.00 295.00 25,075.00 202.6 CURB REMOVAL FOR STORAGE LF 1,300. 4.20 5,460.00 2.00 2,600.00 2.55 3,315.00 202.7 REMOVAL OF GUARDRAIL LF 11,280. 1.00 11,280.00 3.00 33,840.00 1.20 13,536.00 202.74 REMOVAL OF CONCRETE BARRIER LF 2,050. 10.45 21,422.50 6.50 13,325.00 6.90 14,145.00 202.8 REMOVAL OF FENCE LF 1,900. 1.10 2,090.00 2.00 3,800.00 2.65 5,035.00 11238M PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 366,700. 4.90 1,796,830.00 6.00 2,200,200.00 7.00 2,566,900.00 203.2 ROCK EXCAVATION CY 116,500. 11.25 1,310,625.00 6.00 699,000.00 9.50 1,106,750.00 203.35 HANDLING EXCAVATED, CONTAMINATED SOILS (DEPARTMENT DISPOSAL) CY 255. 50.00 12,750.00 35.00 8,925.00 125.00 31,875.00 203.352 EXCAVATE AND STOCKPILE CONTAMINATED SOIL CY 21,000. 3.00 63,000.00 6.00 126,000.00 10.00 210,000.00 203.4 MUCK EXCAVATION CY 7,500. 4.20 31,500.00 6.00 45,000.00 9.15 68,625.00 203.49 WETLAND SOIL EXCAVATION CY 760. 21.35 16,226.00 6.00 4,560.00 11.25 8,550.00 203.52 IMPERVIOUS MATERIAL (F) CY 3,055. 14.95 45,672.25 12.00 36,660.00 2.30 7,026.50 203.55261 INSTALLATION AND REMOVAL OF SWZ - PORTABLE QUEUE TRAILER PLATFORM U 10. 1,500.00 15,000.00 750.00 7,500.00 450.00 4,500.00 203.55262 INSTALLATION AND REMOVAL OF PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM U 2. 1,500.00 3,000.00 750.00 1,500.00 525.00 1,050.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 775.00 2,325.00 1,250.00 3,750.00 800.00 2,400.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 16. 500.00 8,000.00 1,000.00 16,000.00 555.00 8,880.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 2. 500.00 1,000.00 1,000.00 2,000.00 565.00 1,130.00 203.6 EMBANKMENT-IN-PLACE (F) CY 514,300. 6.80 3,497,240.00 4.00 2,057,200.00 3.95 2,031,485.00 203.62 EMBANKMENT-IN-PLACE REPLACEMENT MATERIALS CY 7,500. 10.00 75,000.00 12.50 93,750.00 20.25 151,875.00 203.642 TEST EMBANKMENT U 1. 131,000.00 131,000.00 440,000.00 440,000.00 300,000.00 300,000.00 203.7 REHANDLING SURCHARGE MATERIAL CY 430. 4.20 1,806.00 4.00 1,720.00 15.00 6,450.00 206.1 COMMON STRUCTURE EXCAVATION CY 7,200. 7.15 51,480.00 15.00 108,000.00 11.00 79,200.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 620. 20.00 12,400.00 35.00 21,700.00 35.00 21,700.00 206.2 ROCK STRUCTURE EXCAVATION CY 6,100. 35.65 217,465.00 28.00 170,800.00 43.00 262,300.00 209.1 GRANULAR BACKFILL CY 830. 20.00 16,600.00 20.00 16,600.00 16.25 13,487.50 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 1,815. 19.70 35,755.50 50.00 90,750.00 29.50 53,542.50 209.5 GRANULAR BACKFILL FOR MSE WALLS CY 14,200. 17.80 252,760.00 40.00 568,000.00 20.50 291,100.00 211.11 VIBRATION MONITORING SERVICES HR 12. 80.00 960.00 100.00 1,200.00 130.00 1,560.00 214. FINE GRADING U 1. 320,000.00 320,000.00 300,000.00 300,000.00 145,000.00 145,000.00 214.41 FINE GRADING- WETLAND MITIGATION U 1. 20,400.00 20,400.00 50,000.00 50,000.00 .88 .88 304.1 SAND (F) CY 134,257. 11.50 1,543,955.50 15.00 2,013,855.00 11.20 1,503,678.40 304.101 SAND CY 14,400. 13.50 194,400.00 15.00 216,000.00 13.00 187,200.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 49,250. 15.45 760,912.50 18.50 911,125.00 20.50 1,009,625.00 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIMMING CY 2,450. 16.75 41,037.50 18.50 45,325.00 22.00 53,900.00 11238M PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.43 CRUSHED STONE (FINE GRADATION) FOR SHOULDER LEVELING CY 730. 25.00 18,250.00 50.00 36,500.00 33.00 24,090.00 304.45 CRUSHED STONE (FINE GRADATION) FOR DRIVES CY 3,550. 15.85 56,267.50 35.00 124,250.00 22.75 80,762.50 304.499 TEMPORARY CRUSHED STONE (FINE GRADATION) CY 40. 50.00 2,000.00 35.00 1,400.00 24.00 960.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 44,400. 15.45 685,980.00 18.50 821,400.00 20.25 899,100.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 7,520. 69.75 524,520.00 66.00 496,320.00 66.00 496,320.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 47,690. 64.80 3,090,312.00 62.00 2,956,780.00 62.00 2,956,780.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 11,480. 64.80 743,904.00 66.50 763,420.00 67.00 769,160.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 2,800. 74.75 209,300.00 76.00 212,800.00 77.00 215,600.00 403.11201 HOT BITUMINOUS PAVEMENT ASPHALT RUBBER GAPGRADED (HMA-ARGG) (QC/QA TIER 1 TON 9,320. 87.70 817,364.00 91.00 848,120.00 101.00 941,320.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 1,350. 105.00 141,750.00 110.00 148,500.00 125.00 168,750.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 88,300. 1.00 88,300.00 1.00 88,300.00 2.00 176,600.00 403.6 PAVEMENT JOINT ADHESIVE LF 475,800. .22 104,676.00 .24 114,192.00 .22 104,676.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 156. 125.00 19,500.00 135.00 21,060.00 155.00 24,180.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,300. 72.75 94,575.00 74.00 96,200.00 77.00 100,100.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 18,000. 65.80 1,184,400.00 65.00 1,170,000.00 66.50 1,197,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 210. 74.75 15,697.50 75.00 15,750.00 77.00 16,170.00 411.47 PLANT MIX SURFACE TREATMENT (MODIFIED ASPHALT CEMENT), NO 4 TON 4,020. 88.80 356,976.00 88.00 353,760.00 75.00 301,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 56,500. 1.50 84,750.00 1.50 84,750.00 1.60 90,400.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 27,500. .50 13,750.00 1.50 41,250.00 1.65 45,375.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 100,000.00 100,000.00 75,000.00 75,000.00 112,000.00 112,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 40,000.00 40,000.00 20,000.00 20,000.00 44,800.00 44,800.00 503.101 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 3,500.00 3,500.00 15,000.00 15,000.00 11238M PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 503.102 WATER DIVERSION STRUCTURE U 1. 15,000.00 15,000.00 3,500.00 3,500.00 17,250.00 17,250.00 503.103 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 8,500.00 8,500.00 14,000.00 14,000.00 503.104 WATER DIVERSION STRUCTURE U 1. 60,000.00 60,000.00 70,000.00 70,000.00 63,000.00 63,000.00 503.105 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 4,500.00 4,500.00 14,000.00 14,000.00 503.106 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 4,500.00 4,500.00 13,500.00 13,500.00 503.107 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 3,500.00 3,500.00 14,000.00 14,000.00 503.108 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 3,500.00 3,500.00 17,000.00 17,000.00 503.109 WATER DIVERSION STRUCTURE U 1. 6,000.00 6,000.00 4,000.00 4,000.00 17,000.00 17,000.00 503.110 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 30,000.00 30,000.00 14,000.00 14,000.00 503.201 COFFERDAMS U 1. 155,000.00 155,000.00 85,000.00 85,000.00 150,000.00 150,000.00 503.202 COFFERDAMS U 1. 51,600.00 51,600.00 125,000.00 125,000.00 50,000.00 50,000.00 503.203 COFFERDAMS U 1. 20,600.00 20,600.00 60,000.00 60,000.00 22,000.00 22,000.00 503.204 COFFERDAMS U 1. 4,000.00 4,000.00 1,000.00 1,000.00 8,500.00 8,500.00 503.205 COFFERDAMS U 1. 4,000.00 4,000.00 1,500.00 1,500.00 8,500.00 8,500.00 503.206 COFFERDAMS U 1. 4,000.00 4,000.00 2,000.00 2,000.00 8,500.00 8,500.00 503.207 COFFERDAMS U 1. 4,000.00 4,000.00 1,000.00 1,000.00 8,500.00 8,500.00 503.208 COFFERDAMS U 1. 4,000.00 4,000.00 1,250.00 1,250.00 8,500.00 8,500.00 503.209 COFFERDAMS U 1. 4,000.00 4,000.00 1,500.00 1,500.00 8,500.00 8,500.00 503.210 COFFERDAMS U 1. 4,000.00 4,000.00 2,200.00 2,200.00 8,500.00 8,500.00 503.211 COFFERDAMS U 1. 4,000.00 4,000.00 1,000.00 1,000.00 8,500.00 8,500.00 503.212 COFFERDAMS U 2. 12,000.00 24,000.00 5,000.00 10,000.00 8,500.00 17,000.00 503.213 COFFERDAMS U 1. 4,000.00 4,000.00 1,500.00 1,500.00 8,500.00 8,500.00 503.214 COFFERDAMS U 1. 4,000.00 4,000.00 1,000.00 1,000.00 8,500.00 8,500.00 503.215 COFFERDAMS U 1. 8,000.00 8,000.00 1,000.00 1,000.00 8,500.00 8,500.00 503.216 COFFERDAMS U 1. 6,000.00 6,000.00 5,000.00 5,000.00 8,500.00 8,500.00 503.217 COFFERDAMS U 1. 6,000.00 6,000.00 1,000.00 1,000.00 8,500.00 8,500.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 1,530. 10.00 15,300.00 11.00 16,830.00 11.00 16,830.00 504.101 COMMON BRIDGE EXCAVATION CY 10,656. 7.00 74,592.00 8.00 85,248.00 9.50 101,232.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 130. 130.00 16,900.00 100.00 13,000.00 50.00 6,500.00 506.4 STEEL SHEETING FOR ENVIRONMENTAL PROTECTION SY 1,800. 43.85 78,930.00 50.00 90,000.00 85.00 153,000.00 508. STRUCTURAL FILL CY 809. 19.25 15,573.25 40.00 32,360.00 30.00 24,270.00 510.101 PILE DRIVING EQUIPMENT U 1. 51,600.00 51,600.00 42,000.00 42,000.00 50,000.00 50,000.00 510.102 PILE DRIVING EQUIPMENT U 1. 15,500.00 15,500.00 35,000.00 35,000.00 15,000.00 15,000.00 510.6101 FURNISHING & DRIVING STEEL BEARING PILES LB 133,560. .55 73,458.00 .54 72,122.40 .53 70,786.80 510.6102 FURNISHING & DRIVING STEEL BEARING PILES LB 28,250. .55 15,537.50 .56 15,820.00 .53 14,972.50 510.6501 DRIVING POINTS FOR STEEL BEARING PILES EA 56. 206.00 11,536.00 90.00 5,040.00 210.00 11,760.00 510.6502 DRIVING-POINTS FOR STEEL BEARING PILES EA 16. 206.00 3,296.00 90.00 1,440.00 200.00 3,200.00 510.9 PILE SPLICES EA 13. 1.05 13.65 10.00 130.00 1.00 13.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 53. 258.00 13,674.00 300.00 15,900.00 250.00 13,250.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 4. 516.00 2,064.00 500.00 2,000.00 500.00 2,000.00 11238M PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 2. 619.00 1,238.00 700.00 1,400.00 600.00 1,200.00 520.01 CONCRETE CLASS AA CY 16. 413.00 6,608.00 1,225.00 19,600.00 400.00 6,400.00 520.0302 CONCRETE CLASS AA APPROAC SLABS (QC/QA) (F) CY 214. 258.00 55,212.00 222.00 47,508.00 250.00 53,500.00 520.1 CONCRETE CLASS A CY 152. 155.00 23,560.00 550.00 83,600.00 500.00 76,000.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 519. 516.00 267,804.00 674.00 349,806.00 500.00 259,500.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 730. 671.00 489,830.00 690.00 503,700.00 650.00 474,500.00 520.2 CONCRETE CLASS B CY 420. 285.00 119,700.00 253.00 106,260.00 250.00 105,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 600. 258.00 154,800.00 243.00 145,800.00 250.00 150,000.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 345. 130.00 44,850.00 105.00 36,225.00 105.00 36,225.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 804. 774.00 622,296.00 850.00 683,400.00 750.00 603,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 180. 77.40 13,932.00 75.00 13,500.00 75.00 13,500.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 186. 51.60 9,597.60 60.00 11,160.00 50.00 9,300.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 2,943. 18.50 54,445.50 19.00 55,917.00 18.50 54,445.50 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 165. 5.15 849.75 10.00 1,650.00 5.00 825.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 40. 5.15 206.00 10.00 400.00 5.00 200.00 541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 72. 5.15 370.80 10.00 720.00 5.00 360.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 140. 10.30 1,442.00 10.00 1,400.00 10.00 1,400.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 85. 10.30 875.50 10.00 850.00 10.00 850.00 544.1 REINFORCING STEEL (ROADWAY) LB 50,850. 1.00 50,850.00 .95 48,307.50 1.05 53,392.50 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 73,340. 1.15 84,341.00 1.17 85,807.80 1.10 80,674.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 415,500. 1.05 436,275.00 1.09 452,895.00 1.00 415,500.00 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 1,498. 7.75 11,609.50 7.50 11,235.00 7.50 11,235.00 547.1 SHEAR CONNECTORS (F) EA 7,332. 5.15 37,759.80 4.15 30,427.80 5.00 36,660.00 550.1 STRUCTURAL STEEL (F) LB 994,207. 1.75 1,739,862.25 1.66 1,650,383.62 1.70 1,690,151.90 550.210 BRIDGE SHOES - HLMR (F) EA 27. 3,610.00 97,470.00 3,310.00 89,370.00 3,500.00 94,500.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) (F) LF 85. 109.00 9,265.00 110.00 9,350.00 110.00 9,350.00 11238M PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LF 101. 1,290.00 130,290.00 1,465.00 147,965.00 1,250.00 126,250.00 562.1 SILICONE JOINT SEALANT (F LF 910. 10.30 9,373.00 15.00 13,650.00 10.00 9,100.00 563.22 BRIDGE RAIL T2 (F) LF 91. 104.00 9,464.00 105.00 9,555.00 105.00 9,555.00 563.221 BRIDGE RAIL T2 WITH PROTECTIVE SCREENING (F) LF 269. 158.00 42,502.00 160.00 43,040.00 160.00 43,040.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LF 48. 144.00 6,912.00 146.00 7,008.00 140.00 6,720.00 563.241 BRIDGE RAIL T4 WITH PROTECTIVE SCREENING (F) LF 261. 221.00 57,681.00 224.00 58,464.00 227.00 59,247.00 563.973 SNOW SCREENING FOR OVERPASS STRUCTURES RAIL F LF 124. 42.40 5,257.60 43.00 5,332.00 42.00 5,208.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) U 4. 4,360.00 17,440.00 4,425.00 17,700.00 4,475.00 17,900.00 565.242 BRIDGE APPROACH RAIL T4 (STEEL POSTS) U 2. 5,720.00 11,440.00 5,800.00 11,600.00 5,733.00 11,466.00 570.92 RECONSTRUCT MASONRY WALL CY 27. 850.00 22,950.00 850.00 22,950.00 850.00 22,950.00 572.2 RECONSTRUCTING STONE WALL MULTIPLE STONES WIDE LF 45. 450.00 20,250.00 450.00 20,250.00 500.00 22,500.00 582.1 SLOPE PAVING WITH CONCRETE (F) SY 622. 48.00 29,856.00 48.00 29,856.00 50.00 31,100.00 585.2 STONE FILL, CLASS B CY 140. 35.00 4,900.00 28.00 3,920.00 36.00 5,040.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 110. 50.00 5,500.00 30.00 3,300.00 48.00 5,280.00 585.25 COBBLE-GRAVEL-SAND CY 2,200. 25.00 55,000.00 40.00 88,000.00 60.00 132,000.00 585.3 STONE FILL, CLASS C CY 3,500. 25.00 87,500.00 35.00 122,500.00 32.00 112,000.00 587.1 KEYED STONE FILL CY 200. 35.00 7,000.00 125.00 25,000.00 86.00 17,200.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 9,632. 34.00 327,488.00 40.00 385,280.00 40.00 385,280.00 593.211 GEOTEXTILE; SEPARATION CL.1, NON-WOVEN SY 954. 3.00 2,862.00 2.00 1,908.00 1.50 1,431.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN SY 18,900. 1.75 33,075.00 2.00 37,800.00 1.35 25,515.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 175. 3.00 525.00 3.00 525.00 1.45 253.75 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 7,100. 2.00 14,200.00 2.00 14,200.00 1.35 9,585.00 603.0001 VIDEO INSPECTION LF 32,250. .88 28,380.00 1.00 32,250.00 .75 24,187.50 603.00215 15" R.C. PIPE, 2000D LF 2,550. 30.00 76,500.00 32.00 81,600.00 31.00 79,050.00 603.00218 18" R.C. PIPE, 2000D LF 840. 34.00 28,560.00 50.00 42,000.00 31.00 26,040.00 603.00224 24" R.C. PIPE, 2000D LF 1,750. 43.00 75,250.00 55.00 96,250.00 40.00 70,000.00 603.00230 30" R.C. PIPE, 2000D LF 360. 55.00 19,800.00 62.00 22,320.00 51.00 18,360.00 603.00242 42" R.C. PIPE, 2000D LF 160. 80.00 12,800.00 130.00 20,800.00 75.00 12,000.00 603.00248 48" R.C. PIPE, 2000D LF 425. 115.00 48,875.00 125.00 53,125.00 97.00 41,225.00 603.00260 60" R.C. PIPE, 2000D LF 305. 253.00 77,165.00 160.00 48,800.00 162.00 49,410.00 603.00315 15" R.C. PIPE, 3000D LF 45. 35.00 1,575.00 37.00 1,665.00 34.00 1,530.00 603.00430 30" R.C. PIPE, 3750D LF 220. 40.00 8,800.00 70.00 15,400.00 65.00 14,300.00 603.11008 8" CORR. STEEL PIPE, .064 LF 17. 40.00 680.00 35.00 595.00 44.00 748.00 11238M PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.11012 12" CORR. STEEL PIPE, .064" LF 19. 50.00 950.00 37.00 703.00 43.50 826.50 603.33115 15" CORR. POLYETHYLENE END SECTION EA 4. 175.00 700.00 140.00 560.00 180.00 720.00 603.33118 18" CORR. POLYETHYLENE END SECTION EA 4. 250.00 1,000.00 180.00 720.00 190.00 760.00 603.33124 24" CORR. POLYETHYLENE END SECTION EA 1. 300.00 300.00 210.00 210.00 275.00 275.00 603.33130 30" CORR. POLYETHYLENE END SECTION EA 3. 500.00 1,500.00 480.00 1,440.00 380.00 1,140.00 603.36112 12" ALUMINIZED STEEL END SECTION EA 6. 150.00 900.00 160.00 960.00 215.00 1,290.00 603.36118 18" ALUMINIZED STEEL END SECTION EA 1. 250.00 250.00 210.00 210.00 305.00 305.00 603.36130 30" ALUMINIZED STEEL END SECTION EA 2. 550.00 1,100.00 430.00 860.00 685.00 1,370.00 603.391 RESETTING CONCRETE END SECTIONS EA 2. 250.00 500.00 125.00 250.00 575.00 1,150.00 603.44015 15" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 57. 25.00 1,425.00 40.00 2,280.00 30.25 1,724.25 603.491 24" CMP REPAIR SLEEVE EA 3. 1,000.00 3,000.00 350.00 1,050.00 215.00 645.00 603.50012 12" PIPE FOR DRIVES & MINOR APPROACHES LF 130. 25.00 3,250.00 30.00 3,900.00 24.00 3,120.00 603.60015 LAYING/RELAYING 15" DRAINAGE PIPE LF 25. 30.00 750.00 38.00 950.00 25.75 643.75 603.60024 LAYING/RELAYING 24" DRAINAGE PIPE LF 60. 30.00 1,800.00 40.00 2,400.00 26.50 1,590.00 603.82118 18" PE PIPE (TYPE C) LF 47. 30.00 1,410.00 45.00 2,115.00 32.00 1,504.00 603.82124 24" PE PIPE (TYPE C) LF 68. 38.00 2,584.00 50.00 3,400.00 41.75 2,839.00 603.82215 15" PE PIPE (TYPE S) LF 22,050. 27.30 601,965.00 30.00 661,500.00 23.00 507,150.00 603.82218 18" PE PIPE (TYPE S) LF 4,500. 32.15 144,675.00 32.00 144,000.00 27.00 121,500.00 603.82224 24" PE PIPE (TYPE S) LF 4,200. 39.55 166,110.00 39.00 163,800.00 33.00 138,600.00 603.82230 30" PE PIPE (TYPE S) LF 970. 52.80 51,216.00 53.00 51,410.00 46.00 44,620.00 604.0007 POLYETHYLENE LINER EA 220. 200.00 44,000.00 165.00 36,300.00 195.00 42,900.00 604.114 CATCH BASINS TYPE A, 4-FOOT DIAMETER U 84. 1,750.00 147,000.00 2,200.00 184,800.00 1,800.00 151,200.00 604.115 CATCH BASINS TYPE A, 5-FOOT DIAMETER U 21. 2,500.00 52,500.00 2,825.00 59,325.00 2,550.00 53,550.00 604.1152 CATCH BASIN TYPE A, DOUBLE GRATE, 5' DIA U 7. 2,900.00 20,300.00 3,000.00 21,000.00 2,800.00 19,600.00 604.11525 CATCH BASINS TYPE A, DOUBLE GRATE 5' DIA 5% CROSS SLOPE U 1. 2,800.00 2,800.00 3,300.00 3,300.00 3,050.00 3,050.00 604.116 CATCH BASINS TYPE A, 6-FOOT DIAMETER U 6. 3,100.00 18,600.00 3,150.00 18,900.00 2,900.00 17,400.00 604.118 CATCH BASIN TYPE A, 8-FOOT DIAMETER U 2. 5,000.00 10,000.00 7,000.00 14,000.00 2,775.00 5,550.00 604.12 CATCH BASINS TYPE B U 60. 1,750.00 105,000.00 2,000.00 120,000.00 1,750.00 105,000.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 3. 2,600.00 7,800.00 2,600.00 7,800.00 2,050.00 6,150.00 11238M PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.1252 CATCH BASIN TYPE B, 5' DIA., DOUBLE GRATE U 3. 2,850.00 8,550.00 3,000.00 9,000.00 2,375.00 7,125.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 2,500.00 5,000.00 3,200.00 6,400.00 3,000.00 6,000.00 604.15 CATCH BASINS TYPE E U 55. 1,900.00 104,500.00 2,300.00 126,500.00 2,100.00 115,500.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 22. 2,600.00 57,200.00 3,000.00 66,000.00 2,400.00 52,800.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 2. 3,000.00 6,000.00 3,700.00 7,400.00 3,900.00 7,800.00 604.158 CATCH BASINS TYPE E, 8-FOOT DIAMETER U 2. 5,200.00 10,400.00 6,500.00 13,000.00 6,325.00 12,650.00 604.16 CATCH BASINS TYPE F U 40. 2,000.00 80,000.00 2,100.00 84,000.00 1,850.00 74,000.00 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 5. 3,000.00 15,000.00 2,900.00 14,500.00 2,300.00 11,500.00 604.1652 CATCH BASINS TYPE F, 5' DIA., DOUBLE GRATE U 6. 3,300.00 19,800.00 3,265.00 19,590.00 3,200.00 19,200.00 604.241 DROP INLETS TYPE D-A U 5. 1,100.00 5,500.00 1,800.00 9,000.00 1,550.00 7,750.00 604.245 DROP INLETS TYPE D-E U 9. 1,300.00 11,700.00 1,800.00 16,200.00 1,700.00 15,300.00 604.25 DROP INLETS TYPE E U 6. 1,500.00 9,000.00 1,700.00 10,200.00 2,050.00 12,300.00 604.258 DROP INLETS TYPE E, 8-FOOT DIAMETER U 2. 3,000.00 6,000.00 5,000.00 10,000.00 4,825.00 9,650.00 604.32 DRAINAGE MANHOLES U 19. 2,100.00 39,900.00 2,000.00 38,000.00 2,000.00 38,000.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 7. 2,800.00 19,600.00 2,700.00 18,900.00 2,525.00 17,675.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 21. 350.00 7,350.00 450.00 9,450.00 300.00 6,300.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 24. 350.00 8,400.00 450.00 10,800.00 300.00 7,200.00 604.62 DRAINAGE MANHOLE COVERS AND FRAMES EA 1. 500.00 500.00 600.00 600.00 625.00 625.00 604.9101 OUTLET CONTROL STRUCTURE U 1. 2,440.00 2,440.00 3,650.00 3,650.00 3,425.00 3,425.00 604.9102 OUTLET CONTROL STRUCTURE U 2. 2,630.00 5,260.00 3,250.00 6,500.00 2,900.00 5,800.00 604.9103 OUTLET CONTROL STRUCTURE U 2. 2,630.00 5,260.00 3,700.00 7,400.00 2,900.00 5,800.00 604.9104 OUTLET CONTROL STRUCTURE U 2. 2,600.00 5,200.00 3,500.00 7,000.00 2,900.00 5,800.00 604.9105 OUTLET CONTROL STRUCTURE U 2. 2,580.00 5,160.00 3,700.00 7,400.00 2,900.00 5,800.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 19,500. 13.00 253,500.00 13.00 253,500.00 12.75 248,625.00 605.508 8" PERF. CORR. POLYETHYL PIPE UND. LF 6,300. 16.00 100,800.00 14.00 88,200.00 14.50 91,350.00 605.79 UNDERDRAIN FLUSHING BASINS EA 57. 310.00 17,670.00 450.00 25,650.00 275.00 15,675.00 605.82251 24" AGGRE. UND. TYPE 2 WITH 6" P.C. POLY PIPE LF 3,500. 25.00 87,500.00 21.00 73,500.00 21.00 73,500.00 605.82258 24" AGGRE. UND. TYPE 2 WITH 8" P.C. POLY PIPE LF 2,950. 28.00 82,600.00 23.00 67,850.00 22.50 66,375.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,700. 17.10 148,770.00 17.35 150,945.00 17.25 150,075.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) (STEEL POST) LF 190. 23.65 4,493.50 24.00 4,560.00 24.23 4,603.70 11238M PAGE 9 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 3. 1,970.00 5,910.00 2,000.00 6,000.00 1,975.00 5,925.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 20. 1,730.00 34,600.00 1,750.00 35,000.00 1,766.00 35,320.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 12. 493.00 5,916.00 500.00 6,000.00 497.00 5,964.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 110. 19.70 2,167.00 20.00 2,200.00 20.35 2,238.50 606.2120 DOUBLE-FACED BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,200. 24.65 29,580.00 25.00 30,000.00 24.93 29,916.00 606.21203 DOUBLE-FACED BEAM GUARDRAIL (GALVANIZED), THRIE BEAM (STEEL POST) LF 850. 37.00 31,450.00 37.50 31,875.00 37.42 31,807.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 5. 2,900.00 14,500.00 2,945.00 14,725.00 3,021.00 15,105.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 1. 4,140.00 4,140.00 4,200.00 4,200.00 4,188.00 4,188.00 606.3221 DOUBLE FACED TRANSITION RAIL, STEEL POST (F-SHAPE BARRIER) U 1. 4,140.00 4,140.00 4,200.00 4,200.00 4,188.00 4,188.00 606.41211 TRANSITION MEDIAN CONCRET BARRIER, PRECAST U 1. 2,300.00 2,300.00 1,800.00 1,800.00 2,350.00 2,350.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 5. 6,500.00 32,500.00 5,000.00 25,000.00 5,100.00 25,500.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 7,400. 75.00 555,000.00 75.00 555,000.00 75.00 555,000.00 606.4133 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST (10' SECTION) LF 340. 88.00 29,920.00 94.00 31,960.00 95.00 32,300.00 606.4139 SINGLE SLOPE CONCRETE BARRIER, PRECAST (MODIFIED)(54") LF 660. 88.00 58,080.00 88.00 58,080.00 85.00 56,100.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 22,600. 12.00 271,200.00 25.00 565,000.00 50.00 1,130,000.00 606.4171 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL - LEFT IN PLACE LF 140. 40.00 5,600.00 37.00 5,180.00 34.00 4,760.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 2. 1,350.00 2,700.00 1,370.00 2,740.00 1,400.00 2,800.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 8. 3,950.00 31,600.00 3,000.00 24,000.00 2,500.00 20,000.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 9. 5,950.00 53,550.00 5,000.00 45,000.00 3,750.00 33,750.00 607.146 WOVEN WIRE FENCE 4'-6" HIGH LF 1,925. 6.00 11,550.00 8.00 15,400.00 7.00 13,475.00 11238M PAGE 10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 607.360 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC, 6' HIGH LF 13,160. 19.25 253,330.00 19.00 250,040.00 23.30 306,628.00 607.4146 POST ASSEMBLIES FOR WOVEN WIRE FENCE, 4'-6" HIGH EA 11. 150.00 1,650.00 350.00 3,850.00 215.00 2,365.00 607.4360 POST ASSEMBLIES FOR CHAIN LINK FENCE WITH VINYL CTD STL FABRIC, 6' HIGH EA 73. 225.00 16,425.00 140.00 10,220.00 267.00 19,491.00 607.73518 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 5' HIGH U 2. 1,900.00 3,800.00 1,500.00 3,000.00 1,510.00 3,020.00 607.73618 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 6' HIGH U 1. 1,900.00 1,900.00 1,700.00 1,700.00 1,580.00 1,580.00 607.78618 18' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 3. 2,500.00 7,500.00 1,800.00 5,400.00 1,685.00 5,055.00 607.78624 24' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 1. 3,000.00 3,000.00 2,519.00 2,519.00 2,500.00 2,500.00 607.860 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC & BARBED WIRE, 6' LF 3,160. 30.00 94,800.00 20.25 63,990.00 25.00 79,000.00 607.9804 RESETTING IRON GATE, 4' HIGH LF 14. 40.00 560.00 30.00 420.00 200.00 2,800.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 4,800. 14.00 67,200.00 20.00 96,000.00 14.00 67,200.00 608.24 4" CONCRETE SIDEWALK (F) SY 240. 34.00 8,160.00 39.00 9,360.00 36.00 8,640.00 608.26 6" CONCRETE SIDEWALK (F) SY 1,640. 37.00 60,680.00 42.00 68,880.00 38.00 62,320.00 608.28 8" CONCRETE SIDEWALK (F) SY 470. 40.00 18,800.00 45.00 21,150.00 41.00 19,270.00 608.38 8" REINFORCED CONCRETE SIDEWALK (F) SY 605. 43.00 26,015.00 48.00 29,040.00 44.00 26,620.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 63. 375.00 23,625.00 375.00 23,625.00 375.00 23,625.00 609.01 STRAIGHT GRANITE CURB LF 6,790. 16.50 112,035.00 16.50 112,035.00 16.00 108,640.00 609.01123 STRAIGHT GRANITE CURB 12" HIGH, WITH 3"X3" MOUNTABLE BEVELED EDGE LF 340. 23.50 7,990.00 23.50 7,990.00 19.00 6,460.00 609.02 CURVED GRANITE CURB LF 230. 26.00 5,980.00 26.00 5,980.00 25.50 5,865.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 13,280. 11.95 158,696.00 11.95 158,696.00 13.00 172,640.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 5,540. 14.20 78,668.00 14.20 78,668.00 15.25 84,485.00 609.22 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS LF 63. 11.95 752.85 11.95 752.85 13.00 819.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 80. 14.20 1,136.00 14.20 1,136.00 15.25 1,220.00 609.23 CURVED GRANITE SLOPE CURB LF 25. 64.50 1,612.50 64.50 1,612.50 68.00 1,700.00 11238M PAGE 11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.236 CURVED GRANITE SLOPE CURB 6" HIGH LF 2. 65.00 130.00 64.50 129.00 70.00 140.00 609.5 RESET GRANITE CURB LF 1,550. 4.95 7,672.50 4.95 7,672.50 7.40 11,470.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 1,080. 3.50 3,780.00 3.50 3,780.00 5.00 5,400.00 609.930 SPECIAL GRANITE CURB (REVEAL 12" TO 18") LF 55. 75.00 4,125.00 75.00 4,125.00 34.00 1,870.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 90. 50.00 4,500.00 50.00 4,500.00 51.00 4,590.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 2,600. 71.35 185,510.00 68.00 176,800.00 66.00 171,600.00 611.05216 16" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 240. 98.05 23,532.00 100.00 24,000.00 92.00 22,080.00 611.05220 20" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,500. 135.00 202,500.00 100.00 150,000.00 108.00 162,000.00 611.05412 12" EXTRA HEAVY DUTY DUCTILE IRON WATER PIPE, CL. 54 LF 170. 93.30 15,861.00 95.00 16,150.00 84.00 14,280.00 611.35136 36" DIRECT BURY CASING PIPE WITH 16" DIAMETER CL 52 CARRIER PIPE LF 200. 278.00 55,600.00 295.00 59,000.00 360.00 72,000.00 611.36024 DIRECT BURY CASING PIPE LF 190. 113.00 21,470.00 82.00 15,580.00 155.00 29,450.00 611.70008 8" FITTING EA 6. 400.00 2,400.00 300.00 1,800.00 585.00 3,510.00 611.70010 10" FITTING EA 2. 500.00 1,000.00 340.00 680.00 525.00 1,050.00 611.70012 12" FITTING EA 23. 650.00 14,950.00 540.00 12,420.00 760.00 17,480.00 611.70016 16 " FITTING EA 4. 800.00 3,200.00 920.00 3,680.00 1,400.00 5,600.00 611.70020 20" FITTING EA 7. 1,750.00 12,250.00 1,800.00 12,600.00 2,200.00 15,400.00 611.71006 6" GATE VALVE EA 4. 1,170.00 4,680.00 600.00 2,400.00 710.00 2,840.00 611.71008 8" GATE VALVE EA 2. 1,510.00 3,020.00 825.00 1,650.00 925.00 1,850.00 611.71012 12" GATE VALVE EA 1. 2,320.00 2,320.00 1,550.00 1,550.00 1,550.00 1,550.00 611.71016 16" GATE VALVE EA 1. 5,660.00 5,660.00 4,550.00 4,550.00 6,300.00 6,300.00 611.71020 20" GATE VALVE EA 3. 12,600.00 37,800.00 5,800.00 17,400.00 14,800.00 44,400.00 611.81 HYDRANTS EA 4. 4,500.00 18,000.00 2,400.00 9,600.00 3,100.00 12,400.00 611.84 MANUAL AIR RELEASE EA 1. 1,500.00 1,500.00 1,500.00 1,500.00 1,550.00 1,550.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 350.00 5,250.00 150.00 2,250.00 210.00 3,150.00 611.951 WATER MAIN INSULATION SY 330. 9.00 2,970.00 10.00 3,300.00 15.25 5,032.50 612.3104 4-FOOT DIAMETER SEWER MANHOLE VF 21. 275.00 5,775.00 300.00 6,300.00 525.00 11,025.00 612.313 MODIFY EXISTING MANHOLE (REBUILD INVERT) EA 1. 500.00 500.00 750.00 750.00 1,375.00 1,375.00 612.33 INSTALL DROP CONNECTION VF 4. 100.00 400.00 100.00 400.00 350.00 1,400.00 612.3508 8" PVC SEWER PIPE LF 122. 60.00 7,320.00 75.00 9,150.00 48.00 5,856.00 612.35124 8" PVC SEWER PIPE WITH 24" STEEL CASING LF 440. 134.00 58,960.00 135.00 59,400.00 335.00 147,400.00 612.951 SEWER MAIN INSULATION SY 30. 9.00 270.00 10.00 300.00 14.25 427.50 614.321 2" STEEL CONDUIT LF 200. 9.00 1,800.00 9.00 1,800.00 12.00 2,400.00 614.331 3" STEEL CONDUIT LF 810. 16.00 12,960.00 16.00 12,960.00 16.00 12,960.00 614.3439 4 INCH 3-DUCT STEEL CONDUIT (BRIDGE) LF 345. 85.00 29,325.00 85.00 29,325.00 60.00 20,700.00 11238M PAGE 12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.511 CONCRETE PULL BOX 14" EA 9. 285.00 2,565.00 285.00 2,565.00 310.00 2,790.00 614.512 CONCRETE PULL BOX 18" EA 6. 325.00 1,950.00 325.00 1,950.00 410.00 2,460.00 614.51821 CONCRETE FIBER OPTIC SPLICE VAULT 48"X48"X48" U 8. 3,600.00 28,800.00 3,600.00 28,800.00 2,560.00 20,480.00 614.51823 CONCRETE FIBER OPTIC SPLICE VAULT 48"X96"X48" U 4. 5,000.00 20,000.00 5,000.00 20,000.00 4,500.00 18,000.00 614.5183 30" CONCRETE FIBER OPTIC MANHOLE EA 2. 1,800.00 3,600.00 1,800.00 3,600.00 2,120.00 4,240.00 614.523 MOLDED PULL BOX 17"X30" EA 56. 300.00 16,800.00 300.00 16,800.00 410.00 22,960.00 614.72114 2" PVC CONDUIT, SCHEDULE 40 LF 515. 5.00 2,575.00 5.00 2,575.00 6.00 3,090.00 614.72118 2" PVC CONDUIT, SCHEDULE 80 LF 58. 9.00 522.00 9.00 522.00 12.00 696.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 4,850. 6.25 30,312.50 6.25 30,312.50 6.20 30,070.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 1,750. 11.00 19,250.00 11.00 19,250.00 13.30 23,275.00 614.73214 3" 2-DUCT PVC CONDUIT, SCHEDULE 40 LF 7. 7.00 49.00 7.00 49.00 13.00 91.00 614.73218 3" 2-DUCT PVC CONDUIT, SCHEDULE 80 LF 90. 13.00 1,170.00 13.00 1,170.00 14.00 1,260.00 614.74221 4" 2-DUCT HDPE CONDUIT, SDR 13.5 LF 13,850. 17.00 235,450.00 17.00 235,450.00 14.40 199,440.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 714. 50.00 35,700.00 49.00 34,986.00 49.00 34,986.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 16. 400.00 6,400.00 500.00 8,000.00 500.00 8,000.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 7. 4,500.00 31,500.00 5,850.00 40,950.00 5,900.00 41,300.00 615.02 TRAFFIC SIGN TYPE B (F) SF 292.3 53.00 15,491.90 40.45 11,823.54 40.45 11,823.54 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 775.75 90.00 69,817.50 95.35 73,967.76 95.35 73,967.76 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 10. 1,200.00 12,000.00 1,865.00 18,650.00 1,900.00 19,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 868. 45.00 39,060.00 106.75 92,659.00 106.75 92,659.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 3. 100.00 300.00 175.00 525.00 175.00 525.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 1,936. 17.00 32,912.00 17.50 33,880.00 17.50 33,880.00 615.043 REMOVING TRAFFIC SIGN TYPE AA U 9. 250.00 2,250.00 500.00 4,500.00 500.00 4,500.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 64. 12.00 768.00 36.50 2,336.00 36.50 2,336.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 91. 10.00 910.00 9.35 850.85 9.35 850.85 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 141,000.00 141,000.00 134,000.00 134,000.00 135,000.00 135,000.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 153,000.00 153,000.00 147,000.00 147,000.00 148,000.00 148,000.00 615.10003 FULL TRAFFIC SIGN STRUCTURE U 1. 192,000.00 192,000.00 185,000.00 185,000.00 186,000.00 186,000.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 29,700.00 29,700.00 29,000.00 29,000.00 29,500.00 29,500.00 11238M PAGE 13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 36,100.00 36,100.00 34,800.00 34,800.00 35,000.00 35,000.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 2,500.00 2,500.00 2,500.00 2,500.00 615.20302 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 2,500.00 2,500.00 2,500.00 2,500.00 615.20303 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 2,500.00 2,500.00 2,500.00 2,500.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,770.00 8,770.00 12,600.00 12,600.00 12,600.00 12,600.00 616.101 TRAFFIC SIGNALS U 1. 88,000.00 88,000.00 88,000.00 88,000.00 86,900.00 86,900.00 616.141 COMPUTER EQUIPMENT AND TRAFFIC SIGNAL SOFTWARE U 1. 3,000.00 3,000.00 3,000.00 3,000.00 5,300.00 5,300.00 616.151 TRAFFIC SIGNAL (FIBER OPTIC) U 1. 22,000.00 22,000.00 22,000.00 22,000.00 6,200.00 6,200.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 15,800.00 15,800.00 15,800.00 15,800.00 15,600.00 15,600.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 14,800.00 14,800.00 14,800.00 14,800.00 12,400.00 12,400.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 23,100.00 23,100.00 23,100.00 23,100.00 15,700.00 15,700.00 616.164 TRAFFIC SIGNALS (TEMP.) U 1. 10,700.00 10,700.00 10,700.00 10,700.00 9,100.00 9,100.00 616.165 TRAFFIC SIGNALS (TEMP.) U 1. 10,700.00 10,700.00 10,700.00 10,700.00 9,100.00 9,100.00 616.166 TRAFFIC SIGNALS (TEMP.) U 1. 11,000.00 11,000.00 11,000.00 11,000.00 2,300.00 2,300.00 616.167 TRAFFIC SIGNALS (TEMP.) U 1. 18,200.00 18,200.00 18,200.00 18,200.00 19,200.00 19,200.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 19,000.00 19,000.00 19,000.00 19,000.00 17,900.00 17,900.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 583,000.00 583,000.00 583,000.00 583,000.00 583,000.00 583,000.00 618.7 FLAGGERS HR 4,000. 26.00 104,000.00 20.00 80,000.00 17.50 70,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 360,000.00 360,000.00 150,000.00 150,000.00 750,000.00 750,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 11. 16,500.00 181,500.00 10,000.00 110,000.00 18,000.00 198,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 3. 3,500.00 10,500.00 12,000.00 36,000.00 9,500.00 28,500.00 619.501 SMART WORK ZONE DEVELOPMENT U 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 619.502 SMART WORK ZONE OPERATIONAL COSTS MON 16. 1,800.00 28,800.00 1,800.00 28,800.00 1,800.00 28,800.00 619.503 SMART WORK ZONE OPERATIONAL COSTS (SUMMER) MON 35. 850.00 29,750.00 850.00 29,750.00 850.00 29,750.00 619.51 PORTABLE QUEUE TRAILER/ SENSOR (PQT) MON 612. 600.00 367,200.00 600.00 367,200.00 600.00 367,200.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 153. 925.00 141,525.00 925.00 141,525.00 925.00 141,525.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 2. 16,000.00 32,000.00 15,000.00 30,000.00 19,000.00 38,000.00 619.91 RELOCATE SMART WORK ZONE DEVICE U 25. 200.00 5,000.00 200.00 5,000.00 200.00 5,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 90. 14.80 1,332.00 17.50 1,575.00 14.96 1,346.40 11238M PAGE 14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 165. 3.95 651.75 4.00 660.00 4.04 666.60 621.31 SINGLE DELINEATOR WITH POST EA 140. 29.60 4,144.00 30.00 4,200.00 31.10 4,354.00 621.32 DOUBLE DELINEATOR WITH POST EA 22. 31.55 694.10 32.00 704.00 32.13 706.86 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 10. 31.55 315.50 32.00 320.00 32.13 321.30 621.61 FIBER OPTIC DELINEATOR EA 27. 100.00 2,700.00 100.00 2,700.00 74.88 2,021.76 621.71 FLEXIBLE DELINEATORS, SOIL MOUNT EA 200. 35.00 7,000.00 100.00 20,000.00 60.00 12,000.00 621.73 FLEXIBLE DELINEATORS, (TEMPORARY) EA 18. 35.00 630.00 70.00 1,260.00 60.00 1,080.00 622.1 STEEL WITNESS MARKERS EA 185. 27.60 5,106.00 28.00 5,180.00 28.13 5,204.05 622.2 CONCRETE BOUNDS EA 44. 325.00 14,300.00 330.00 14,520.00 325.00 14,300.00 622.4 STONE BOUNDS EA 22. 286.00 6,292.00 290.00 6,380.00 297.00 6,534.00 625.2 CONCRETE LIGHT POLE BASES, TYPE B EA 16. 700.00 11,200.00 700.00 11,200.00 700.00 11,200.00 625.52 LIGHT POLE U 5. 2,300.00 11,500.00 2,300.00 11,500.00 1,720.00 8,600.00 625.62 RESET/RELOCATE LIGHT POLES EA 11. 600.00 6,600.00 600.00 6,600.00 375.00 4,125.00 628.2 SAWED BITUMINOUS PAVEMENT LF 6,500. 1.00 6,500.00 2.00 13,000.00 1.00 6,500.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 145,100. .10 14,510.00 .10 14,510.00 .10 14,510.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 514,800. .11 56,628.00 .11 56,628.00 .11 56,628.00 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 490. .75 367.50 .75 367.50 .75 367.50 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 21,850. .20 4,370.00 .20 4,370.00 .20 4,370.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 490. 2.00 980.00 2.00 980.00 2.00 980.00 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 165. 4.00 660.00 4.00 660.00 4.00 660.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 3,250. .50 1,625.00 .50 1,625.00 .50 1,625.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 4,100. .60 2,460.00 .60 2,460.00 .60 2,460.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 2,650. .80 2,120.00 .80 2,120.00 .80 2,120.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 14,250. 1.35 19,237.50 1.35 19,237.50 1.35 19,237.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 785. 4.00 3,140.00 4.00 3,140.00 4.00 3,140.00 632.3124 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 24" LINE LF 235. 6.00 1,410.00 6.00 1,410.00 6.00 1,410.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 3,050. 6.00 18,300.00 6.00 18,300.00 6.00 18,300.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 80,500. .30 24,150.00 .30 24,150.00 .30 24,150.00 11238M PAGE 15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 641. LOAM CY 1,860. 14.85 27,621.00 25.00 46,500.00 24.00 44,640.00 643.22 FERTILIZER FOR REFERTILIZATION TON 32. 660.00 21,120.00 825.00 26,400.00 660.00 21,120.00 644.22 SHRUB/FOREST WETLAND SEED MIX LB 65. 185.00 12,025.00 165.00 10,725.00 185.00 12,025.00 644.741 UPLAND SEED MIX LB 5. 25.00 125.00 75.00 375.00 25.00 125.00 645.0001 TURBIDITY BARRIER LF 755. 16.00 12,080.00 25.00 18,875.00 22.00 16,610.00 645.11 MULCH A 6. 825.00 4,950.00 600.00 3,600.00 825.00 4,950.00 645.113 HYDRAULIC MULCH LB 75,000. .75 56,250.00 .50 37,500.00 .75 56,250.00 645.119 MULCH WITH TACKIFIERS A 35. 1,050.00 36,750.00 700.00 24,500.00 1,050.00 36,750.00 645.2535 COIR FIBER MATTING FOR EROSION CONTROL SY 5,000. 4.10 20,500.00 4.25 21,250.00 6.50 32,500.00 645.254 COIR FIBER ROLLS LF 1,750. 2.60 4,550.00 25.00 43,750.00 22.00 38,500.00 645.3 EROSION STONE TON 18,050. 15.00 270,750.00 20.00 361,000.00 24.00 433,200.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 394,800. .50 197,400.00 1.50 592,200.00 1.75 690,900.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 59,550. 2.50 148,875.00 3.25 193,537.50 3.90 232,245.00 645.455 CHANNEL STABILIZATION - ROOTWADS U 9. 500.00 4,500.00 1,000.00 9,000.00 409.00 3,681.00 645.48 EROSION CONTROL MIX CY 5,650. 18.00 101,700.00 25.00 141,250.00 16.50 93,225.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 1,600. 8.00 12,800.00 10.00 16,000.00 21.00 33,600.00 645.482 STUMP GRINDING FOR TEMPORARY EROSION CONTROL CY 8,500. 8.00 68,000.00 15.00 127,500.00 11.00 93,500.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 7.00 1,400.00 15.00 3,000.00 8.50 1,700.00 645.512 COMPOST SOCK FOR PERIMETER BERM LF 46,700. 3.50 163,450.00 3.00 140,100.00 2.50 116,750.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL LB 3,200. .75 2,400.00 .50 1,600.00 .75 2,400.00 645.531 SILT FENCE LF 54,600. 1.25 68,250.00 2.00 109,200.00 1.70 92,820.00 645.611 BONDED FIBER MATRIX (BFM) LB 70,100. 1.05 73,605.00 1.00 70,100.00 1.05 73,605.00 645.612 FIBER REINFORCED MATRIX (FRM) LB 13,200. 2.60 34,320.00 1.95 25,740.00 2.60 34,320.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 29,100.00 29,100.00 70,000.00 70,000.00 72,000.00 72,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 2,850. 48.00 136,800.00 45.50 129,675.00 47.50 135,375.00 645.81 STORMWATER REMOVAL - TRUCKING HR 400. 85.00 34,000.00 85.00 34,000.00 45.25 18,100.00 645.8103 EROSION CONTROL PUMP (300 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,200.00 120,000.00 550.00 55,000.00 556.00 55,600.00 645.8105 EROSION CONTROL PUMP (500 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,200.00 120,000.00 600.00 60,000.00 850.00 85,000.00 11238M PAGE 16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.8110 EROSION CONTROL PUMP (1000 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,600.00 160,000.00 750.00 75,000.00 1,365.00 136,500.00 645.8203 EROSION CONTROL PUMP (300 GAL/MIN DISCHARGE CAPACITY) U 1. 5,000.00 5,000.00 70,000.00 70,000.00 5,000.00 5,000.00 645.8205 EROSION CONTROL PUMP (500 GAL/MIN DISCHARGE CAPACITY) U 1. 7,500.00 7,500.00 80,000.00 80,000.00 8,000.00 8,000.00 645.8210 EROSION CONTROL PUMP (1000 GAL/MIN DISCHARGE CAPACITY) U 6. 15,000.00 90,000.00 100,000.00 600,000.00 15,000.00 90,000.00 645.85 FLOCCULANT TREATMENT SYSTEM (FTS) MON 38. 6,850.00 260,300.00 11,000.00 418,000.00 2,000.00 76,000.00 645.851 WATER QUALITY MONITORING FOR CONSTRUCTION STORMWATER HR 730. 45.35 33,105.50 67.50 49,275.00 67.50 49,275.00 646.2 TURF ESTABLISHMENT WITHOUT MULCH A 73. 4,730.00 345,290.00 3,500.00 255,500.00 4,725.00 344,925.00 647.1 HUMUS CY 28,900. 10.35 299,115.00 24.00 693,600.00 13.00 375,700.00 647.29 WETLAND HUMUS CY 16,050. 17.05 273,652.50 20.00 321,000.00 15.85 254,392.50 650.2 LANDSCAPING U 1. 174,000.00 174,000.00 199,995.00 199,995.00 176,000.00 176,000.00 650.3 LANDSCAPING - WETLAND MITIGATION U 1. 107,000.00 107,000.00 116,550.00 116,550.00 108,000.00 108,000.00 659.401 LANDSCAPE ESTABLISHMENT CREW (4 MEN- 8 HR DAY) DAY 4. 1,100.00 4,400.00 1,200.00 4,800.00 1,200.00 4,800.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 5. 500.00 2,500.00 100.00 500.00 1,000.00 5,000.00 670.04501 CONSTRUCT AND REMOVE DIVERSION U 1. 37,300.00 37,300.00 120,000.00 120,000.00 99,000.00 99,000.00 670.04502 CONSTRUCT AND REMOVE DIVERSION U 1. 22,500.00 22,500.00 40,000.00 40,000.00 32,500.00 32,500.00 670.04503 CONSTRUCT AND REMOVE DIVERSION U 1. 65,000.00 65,000.00 80,000.00 80,000.00 47,000.00 47,000.00 670.04504 CONSTRUCT AND REMOVE DIVERSION U 1. 26,500.00 26,500.00 32,000.00 32,000.00 20,500.00 20,500.00 670.04505 CONSTRUCT AND REMOVE DIVERSION U 1. 7,720.00 7,720.00 3,500.00 3,500.00 5,700.00 5,700.00 670.04506 CONSTRUCT AND REMOVE DIVERSION U 1. 2,690.00 2,690.00 3,500.00 3,500.00 1,600.00 1,600.00 670.04507 CONSTRUCT AND REMOVE DIVERSION U 1. 4,280.00 4,280.00 5,000.00 5,000.00 3,700.00 3,700.00 670.04508 CONSTRUCT AND REMOVE DIVERSION U 1. 30,800.00 30,800.00 30,000.00 30,000.00 24,000.00 24,000.00 670.04509 CONSTRUCT AND REMOVE DIVERSION U 1. 8,950.00 8,950.00 20,000.00 20,000.00 14,000.00 14,000.00 670.04510 CONSTRUCT AND REMOVE DIVERSION U 1. 18,500.00 18,500.00 30,000.00 30,000.00 19,000.00 19,000.00 670.04511 CONSTRUCT AND REMOVE DIVERSION U 1. 23,500.00 23,500.00 40,000.00 40,000.00 34,000.00 34,000.00 11238M PAGE 17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.04512 CONSTRUCT AND REMOVE DIVERSION U 1. 5,600.00 5,600.00 30,000.00 30,000.00 4,400.00 4,400.00 670.04513 CONSTRUCT AND REMOVE DIVERSION U 1. 13,800.00 13,800.00 20,000.00 20,000.00 6,950.00 6,950.00 670.04514 CONSTRUCT AND REMOVE DIVERSION U 1. 1,350.00 1,350.00 5,000.00 5,000.00 1,300.00 1,300.00 670.04515 CONSTRUCT AND REMOVE DIVERSION U 1. 5,720.00 5,720.00 16,000.00 16,000.00 6,900.00 6,900.00 670.04516 CONSTRUCT AND REMOVE DIVERSION U 1. 47,800.00 47,800.00 60,000.00 60,000.00 38,000.00 38,000.00 670.04517 CONSTRUCT AND REMOVE DIVERSION U 1. 6,030.00 6,030.00 2,000.00 2,000.00 9,750.00 9,750.00 670.04518 CONSTRUCT AND REMOVE DIVERSION U 1. 52,700.00 52,700.00 20,000.00 20,000.00 9,900.00 9,900.00 670.04519 CONSTRUCT AND REMOVE DIVERSION U 1. 544.00 544.00 1,000.00 1,000.00 950.00 950.00 670.04520 CONSTRUCT AND REMOVE DIVERSION U 1. 14,000.00 14,000.00 15,000.00 15,000.00 13,500.00 13,500.00 670.04521 CONSTRUCT AND REMOVE DIVERSION U 1. 6,520.00 6,520.00 6,500.00 6,500.00 7,700.00 7,700.00 670.04522 CONSTRUCT AND REMOVE DIVERSION U 1. 6,690.00 6,690.00 15,000.00 15,000.00 9,500.00 9,500.00 670.04523 CONSTRUCT AND REMOVE DIVERSION U 1. 1,000.00 1,000.00 4,000.00 4,000.00 2,050.00 2,050.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 17,500.00 70,000.00 15,000.00 60,000.00 16,000.00 64,000.00 670.812 CONSTRUCT CONCRETE SIDEWALK U 1. 114,000.00 114,000.00 120,000.00 120,000.00 28.00 28.00 670.95 TEMPORARY SAFETY FENCE LF 750. 5.00 3,750.00 6.00 4,500.00 1.00 750.00 671.603 3" PVC CONDUIT, SCHEDULE 80, DIRECTIONAL BORE LF 70. 100.00 7,000.00 50.00 3,500.00 80.00 5,600.00 677.12 PERMANENT FIXED LOCATION DYNAMIC MESSAGE SIGN (DMS) U 1. 86,500.00 86,500.00 75,000.00 75,000.00 86,600.00 86,600.00 677.4101 CCTV SYSTEM U 1. 55,300.00 55,300.00 55,300.00 55,300.00 58,600.00 58,600.00 677.4102 CCTV SYSTEM U 1. 55,000.00 55,000.00 55,000.00 55,000.00 58,600.00 58,600.00 677.42 ROADWAY WEATHER INFORMATION STATION (RWIS) SYSTEM U 1. 68,000.00 68,000.00 68,000.00 68,000.00 75,000.00 75,000.00 677.421 NON-INVASIVE PAVEMENT SENSOR SYSTEM U 1. 45,000.00 45,000.00 45,500.00 45,500.00 19,500.00 19,500.00 677.51012 12-STRAND SINGLE MODE FIBER OPTIC CABLE LF 12,850. 4.00 51,400.00 4.00 51,400.00 3.30 42,405.00 677.51072 72-STRAND SINGLE MODE FIBER OPTIC CABLE LF 2,750. 4.50 12,375.00 4.50 12,375.00 5.00 13,750.00 677.53 FIBER OPTIC SPLICE EA 16. 425.00 6,800.00 425.00 6,800.00 80.00 1,280.00 677.54101 GROUND MOUNTED ITS EQUIPMENT CABINET U 1. 13,000.00 13,000.00 13,000.00 13,000.00 12,800.00 12,800.00 677.54201 POLE MOUNTED ITS EQUIPMENT CABINET U 1. 12,000.00 12,000.00 12,000.00 12,000.00 14,500.00 14,500.00 11238M PAGE 18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 677.561 FIBER OPTIC PATCH PANEL (12-POSITION) EA 2. 900.00 1,800.00 900.00 1,800.00 1,860.00 3,720.00 677.5821 100 MBPS FIBER ETHERNET SWITCH EA 2. 4,000.00 8,000.00 4,000.00 8,000.00 4,650.00 9,300.00 677.6201 MEDIA CONVERTER U 1. 500.00 500.00 500.00 500.00 4,100.00 4,100.00 677.6301 METER AND DISCONNECT PEDESTAL U 1. 1,800.00 1,800.00 1,800.00 1,800.00 3,800.00 3,800.00 677.6302 METER AND DISCONNECT PEDESTAL U 1. 1,800.00 1,800.00 1,800.00 1,800.00 3,800.00 3,800.00 677.64 UNINTERRUPTABLE POWER SUPPLY (UPS) EA 1. 12,000.00 12,000.00 12,000.00 12,000.00 14,500.00 14,500.00 677.9304 3-CONDUCTOR #4 AWG CABLE LF 620. 10.00 6,200.00 10.00 6,200.00 9.10 5,642.00 692. MOBILIZATION U 1. 2,050,000.00 2,050,000.00 2,529,582.50 2,529,582.50 3,400,000.00 3,400,000.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 12,300.00 12,300.00 3,000.00 3,000.00 3,000.00 3,000.00 697.21 PROJECT HEALTH AND SAFETY PLAN U 1. 10,000.00 10,000.00 4,500.00 4,500.00 2,500.00 2,500.00 697.41 CRITICAL PATH METHOD (CPM) ELECTRONIC SCHEDULE U 1. 10,000.00 10,000.00 20,000.00 20,000.00 25,500.00 25,500.00 698.11 FIELD OFFICE TYPE A MON 42. 2,000.00 84,000.00 2,000.00 84,000.00 2,750.00 115,500.00 698.2 PHYSICAL TESTING LABORATORY MON 38. 750.00 28,500.00 450.00 17,100.00 1,250.00 47,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 752,000.00 752,000.00 752,000.00 752,000.00 752,000.00 752,000.00 1006.22 SPECIAL WORK - SOIL TESTING $ 1. 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 1010.15 FUEL ADJUSTMENT $ 1. 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 275,000.00 275,000.00 275,000.00 275,000.00 275,000.00 275,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 $43,155,392.45 $45,719,260.62 $46,435,160.05 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NEWINGTON-DOVER 11238M COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: JUNE 28, 2012 SCOPE OF WORK: WIDENING AND RECONSTRUCTION OF A SEGMENT OF THE SPAULDING TURNPIKE LOCATION: SPAULDING TURNPIKE (NH 16) COMPLETION DATE: JULY 17, 2015 A ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $43,155,392.45 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $45,719,260.62 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $46,435,160.05 D R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $46,937,813.25 E SARGENT CORPORATION 378 BENOCH ROAD, PO BOX 435, STILLWATER, MAINE 04489 $49,883,716.20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 38. 3,400.00 129,200.00 7,500.00 285,000.00 201.21 REMOVING SMALL TREES EA 110. 100.00 11,000.00 75.00 8,250.00 201.22 REMOVING LARGE TREES EA 2. 200.00 400.00 200.00 400.00 201.881 INVASIVE SPECIES CONTROL TYPE I SY 146,100. 1.00 146,100.00 .30 43,830.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 16,000. 1.00 16,000.00 1.75 28,000.00 202.31 FILL ABANDONED PIPE CY 150. 175.00 26,250.00 125.00 18,750.00 202.32 FILL AND ABANDON STRUCTUR CY 21. 140.00 2,940.00 175.00 3,675.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 16,500. 8.00 132,000.00 6.00 99,000.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 1,200. 10.00 12,000.00 9.00 10,800.00 202.43 REMOVAL OF EXIST. ASBEST. CEMENT PIPE, 0-24" DIAM. LF 428. 40.00 17,120.00 28.00 11,984.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 85. 350.00 29,750.00 250.00 21,250.00 202.6 CURB REMOVAL FOR STORAGE LF 1,300. 2.50 3,250.00 2.00 2,600.00 202.7 REMOVAL OF GUARDRAIL LF 11,280. 1.00 11,280.00 2.50 28,200.00 202.74 REMOVAL OF CONCRETE BARRIER LF 2,050. 4.50 9,225.00 5.00 10,250.00 202.8 REMOVAL OF FENCE LF 1,900. 2.50 4,750.00 3.00 5,700.00 11238M PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 366,700. 4.00 1,466,800.00 5.40 1,980,180.00 203.2 ROCK EXCAVATION CY 116,500. 12.00 1,398,000.00 5.40 629,100.00 203.35 HANDLING EXCAVATED, CONTAMINATED SOILS (DEPARTMENT DISPOSAL) CY 255. 11.50 2,932.50 22.00 5,610.00 203.352 EXCAVATE AND STOCKPILE CONTAMINATED SOIL CY 21,000. 7.00 147,000.00 5.00 105,000.00 203.4 MUCK EXCAVATION CY 7,500. 11.50 86,250.00 7.00 52,500.00 203.49 WETLAND SOIL EXCAVATION CY 760. 10.00 7,600.00 5.00 3,800.00 203.52 IMPERVIOUS MATERIAL (F) CY 3,055. 12.00 36,660.00 12.00 36,660.00 203.55261 INSTALLATION AND REMOVAL OF SWZ - PORTABLE QUEUE TRAILER PLATFORM U 10. 800.00 8,000.00 1,100.00 11,000.00 203.55262 INSTALLATION AND REMOVAL OF PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM U 2. 800.00 1,600.00 1,100.00 2,200.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 1,200.00 3,600.00 2,100.00 6,300.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 16. 1,000.00 16,000.00 1,100.00 17,600.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 2. 1,000.00 2,000.00 1,100.00 2,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 514,300. 4.00 2,057,200.00 4.75 2,442,925.00 203.62 EMBANKMENT-IN-PLACE REPLACEMENT MATERIALS CY 7,500. 6.50 48,750.00 12.00 90,000.00 203.642 TEST EMBANKMENT U 1. 250,000.00 250,000.00 350,000.00 350,000.00 203.7 REHANDLING SURCHARGE MATERIAL CY 430. 9.00 3,870.00 12.00 5,160.00 206.1 COMMON STRUCTURE EXCAVATION CY 7,200. 11.50 82,800.00 19.00 136,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 620. 50.00 31,000.00 15.00 9,300.00 206.2 ROCK STRUCTURE EXCAVATION CY 6,100. 40.00 244,000.00 5.40 32,940.00 209.1 GRANULAR BACKFILL CY 830. 22.00 18,260.00 32.00 26,560.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 1,815. 32.00 58,080.00 32.00 58,080.00 209.5 GRANULAR BACKFILL FOR MSE WALLS CY 14,200. 31.00 440,200.00 30.00 426,000.00 211.11 VIBRATION MONITORING SERVICES HR 12. 100.00 1,200.00 155.00 1,860.00 214. FINE GRADING U 1. 350,000.00 350,000.00 400,000.00 400,000.00 214.41 FINE GRADING- WETLAND MITIGATION U 1. 60,000.00 60,000.00 15,000.00 15,000.00 304.1 SAND (F) CY 134,257. 16.00 2,148,112.00 16.00 2,148,112.00 304.101 SAND CY 14,400. 16.00 230,400.00 16.00 230,400.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 49,250. 24.00 1,182,000.00 22.00 1,083,500.00 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIMMING CY 2,450. 27.00 66,150.00 24.00 58,800.00 11238M PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.43 CRUSHED STONE (FINE GRADATION) FOR SHOULDER LEVELING CY 730. 27.00 19,710.00 24.00 17,520.00 304.45 CRUSHED STONE (FINE GRADATION) FOR DRIVES CY 3,550. 27.00 95,850.00 24.00 85,200.00 304.499 TEMPORARY CRUSHED STONE (FINE GRADATION) CY 40. 30.00 1,200.00 30.00 1,200.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 44,400. 24.00 1,065,600.00 22.00 976,800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 7,520. 60.50 454,960.00 68.00 511,360.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 47,690. 60.50 2,885,245.00 64.00 3,052,160.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 11,480. 60.50 694,540.00 68.00 780,640.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 2,800. 74.00 207,200.00 79.00 221,200.00 403.11201 HOT BITUMINOUS PAVEMENT ASPHALT RUBBER GAPGRADED (HMA-ARGG) (QC/QA TIER 1 TON 9,320. 90.00 838,800.00 110.00 1,025,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 1,350. 105.00 141,750.00 126.00 170,100.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 88,300. 1.00 88,300.00 1.50 132,450.00 403.6 PAVEMENT JOINT ADHESIVE LF 475,800. .23 109,434.00 .30 142,740.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 156. 125.00 19,500.00 157.00 24,492.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,300. 70.00 91,000.00 77.00 100,100.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 18,000. 61.00 1,098,000.00 68.00 1,224,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 210. 75.00 15,750.00 77.00 16,170.00 411.47 PLANT MIX SURFACE TREATMENT (MODIFIED ASPHALT CEMENT), NO 4 TON 4,020. 90.00 361,800.00 89.00 357,780.00 417. COLD PLANING BITUMINOUS SURFACES SY 56,500. 1.50 84,750.00 2.00 113,000.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 27,500. 1.50 41,250.00 2.00 55,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 103,000.00 103,000.00 100,000.00 100,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 25,000.00 25,000.00 42,000.00 42,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 500.00 500.00 10,000.00 10,000.00 11238M PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 503.102 WATER DIVERSION STRUCTURE U 1. 7,000.00 7,000.00 12,000.00 12,000.00 503.103 WATER DIVERSION STRUCTURE U 1. 3,500.00 3,500.00 10,000.00 10,000.00 503.104 WATER DIVERSION STRUCTURE U 1. 46,000.00 46,000.00 10,000.00 10,000.00 503.105 WATER DIVERSION STRUCTURE U 1. 3,500.00 3,500.00 8,000.00 8,000.00 503.106 WATER DIVERSION STRUCTURE U 1. 3,500.00 3,500.00 8,000.00 8,000.00 503.107 WATER DIVERSION STRUCTURE U 1. 500.00 500.00 5,000.00 5,000.00 503.108 WATER DIVERSION STRUCTURE U 1. 500.00 500.00 8,000.00 8,000.00 503.109 WATER DIVERSION STRUCTURE U 1. 500.00 500.00 8,000.00 8,000.00 503.110 WATER DIVERSION STRUCTURE U 1. 1,200.00 1,200.00 15,000.00 15,000.00 503.201 COFFERDAMS U 1. 170,000.00 170,000.00 165,000.00 165,000.00 503.202 COFFERDAMS U 1. 120,000.00 120,000.00 55,000.00 55,000.00 503.203 COFFERDAMS U 1. 58,000.00 58,000.00 25,000.00 25,000.00 503.204 COFFERDAMS U 1. 4,100.00 4,100.00 5,000.00 5,000.00 503.205 COFFERDAMS U 1. 4,100.00 4,100.00 5,000.00 5,000.00 503.206 COFFERDAMS U 1. 1,000.00 1,000.00 5,000.00 5,000.00 503.207 COFFERDAMS U 1. 1,000.00 1,000.00 5,000.00 5,000.00 503.208 COFFERDAMS U 1. 2,500.00 2,500.00 5,000.00 5,000.00 503.209 COFFERDAMS U 1. 2,500.00 2,500.00 5,000.00 5,000.00 503.210 COFFERDAMS U 1. 1,200.00 1,200.00 5,000.00 5,000.00 503.211 COFFERDAMS U 1. 1,200.00 1,200.00 5,000.00 5,000.00 503.212 COFFERDAMS U 2. 1,200.00 2,400.00 5,000.00 10,000.00 503.213 COFFERDAMS U 1. 500.00 500.00 5,000.00 5,000.00 503.214 COFFERDAMS U 1. 8,500.00 8,500.00 5,000.00 5,000.00 503.215 COFFERDAMS U 1. 2,500.00 2,500.00 5,000.00 5,000.00 503.216 COFFERDAMS U 1. 5,000.00 5,000.00 15,000.00 15,000.00 503.217 COFFERDAMS U 1. 10,000.00 10,000.00 20,000.00 20,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 1,530. 15.00 22,950.00 12.00 18,360.00 504.101 COMMON BRIDGE EXCAVATION CY 10,656. 12.00 127,872.00 12.00 127,872.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 130. 100.00 13,000.00 300.00 39,000.00 506.4 STEEL SHEETING FOR ENVIRONMENTAL PROTECTION SY 1,800. 81.00 145,800.00 44.00 79,200.00 508. STRUCTURAL FILL CY 809. 40.00 32,360.00 38.00 30,742.00 510.101 PILE DRIVING EQUIPMENT U 1. 42,000.00 42,000.00 55,000.00 55,000.00 510.102 PILE DRIVING EQUIPMENT U 1. 35,000.00 35,000.00 16,500.00 16,500.00 510.6101 FURNISHING & DRIVING STEEL BEARING PILES LB 133,560. .54 72,122.40 .55 73,458.00 510.6102 FURNISHING & DRIVING STEEL BEARING PILES LB 28,250. .56 15,820.00 .55 15,537.50 510.6501 DRIVING POINTS FOR STEEL BEARING PILES EA 56. 90.00 5,040.00 220.00 12,320.00 510.6502 DRIVING-POINTS FOR STEEL BEARING PILES EA 16. 90.00 1,440.00 220.00 3,520.00 510.9 PILE SPLICES EA 13. 10.00 130.00 1.00 13.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 53. 700.00 37,100.00 265.00 14,045.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 4. 950.00 3,800.00 525.00 2,100.00 11238M PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 2. 1,500.00 3,000.00 630.00 1,260.00 520.01 CONCRETE CLASS AA CY 16. 1,500.00 24,000.00 425.00 6,800.00 520.0302 CONCRETE CLASS AA APPROAC SLABS (QC/QA) (F) CY 214. 340.00 72,760.00 275.00 58,850.00 520.1 CONCRETE CLASS A CY 152. 1,000.00 152,000.00 425.00 64,600.00 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 519. 740.00 384,060.00 525.00 272,475.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 730. 750.00 547,500.00 700.00 511,000.00 520.2 CONCRETE CLASS B CY 420. 250.00 105,000.00 300.00 126,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 600. 300.00 180,000.00 265.00 159,000.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 345. 100.00 34,500.00 85.00 29,325.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 804. 800.00 643,200.00 815.00 655,260.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 180. 70.00 12,600.00 82.00 14,760.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 186. 50.00 9,300.00 52.00 9,672.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 2,943. 18.00 52,974.00 25.00 73,575.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 165. 5.50 907.50 5.00 825.00 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 40. 6.00 240.00 5.00 200.00 541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 72. 7.50 540.00 5.00 360.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 140. 9.00 1,260.00 11.00 1,540.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 85. 9.00 765.00 11.00 935.00 544.1 REINFORCING STEEL (ROADWAY) LB 50,850. 1.00 50,850.00 1.00 50,850.00 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 73,340. 1.26 92,408.40 1.00 73,340.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 415,500. 1.26 523,530.00 1.25 519,375.00 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 1,498. 6.00 8,988.00 8.00 11,984.00 547.1 SHEAR CONNECTORS (F) EA 7,332. 6.00 43,992.00 5.00 36,660.00 550.1 STRUCTURAL STEEL (F) LB 994,207. 1.55 1,541,020.85 1.50 1,491,310.50 550.210 BRIDGE SHOES - HLMR (F) EA 27. 3,700.00 99,900.00 3,800.00 102,600.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) (F) LF 85. 100.00 8,500.00 9.00 765.00 11238M PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LF 101. 1,300.00 131,300.00 1,300.00 131,300.00 562.1 SILICONE JOINT SEALANT (F LF 910. 10.00 9,100.00 11.00 10,010.00 563.22 BRIDGE RAIL T2 (F) LF 91. 115.00 10,465.00 125.00 11,375.00 563.221 BRIDGE RAIL T2 WITH PROTECTIVE SCREENING (F) LF 269. 160.00 43,040.00 190.00 51,110.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LF 48. 155.00 7,440.00 165.00 7,920.00 563.241 BRIDGE RAIL T4 WITH PROTECTIVE SCREENING (F) LF 261. 244.00 63,684.00 275.00 71,775.00 563.973 SNOW SCREENING FOR OVERPASS STRUCTURES RAIL F LF 124. 45.00 5,580.00 62.00 7,688.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) U 4. 4,300.00 17,200.00 5,000.00 20,000.00 565.242 BRIDGE APPROACH RAIL T4 (STEEL POSTS) U 2. 6,000.00 12,000.00 6,800.00 13,600.00 570.92 RECONSTRUCT MASONRY WALL CY 27. 850.00 22,950.00 900.00 24,300.00 572.2 RECONSTRUCTING STONE WALL MULTIPLE STONES WIDE LF 45. 450.00 20,250.00 500.00 22,500.00 582.1 SLOPE PAVING WITH CONCRETE (F) SY 622. 48.00 29,856.00 52.00 32,344.00 585.2 STONE FILL, CLASS B CY 140. 33.00 4,620.00 42.00 5,880.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 110. 29.00 3,190.00 42.00 4,620.00 585.25 COBBLE-GRAVEL-SAND CY 2,200. 28.00 61,600.00 30.00 66,000.00 585.3 STONE FILL, CLASS C CY 3,500. 34.00 119,000.00 36.00 126,000.00 587.1 KEYED STONE FILL CY 200. 50.00 10,000.00 48.00 9,600.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 9,632. 38.00 366,016.00 38.00 366,016.00 593.211 GEOTEXTILE; SEPARATION CL.1, NON-WOVEN SY 954. 4.00 3,816.00 2.00 1,908.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN SY 18,900. 1.25 23,625.00 2.00 37,800.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 175. 4.00 700.00 2.00 350.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 7,100. 3.50 24,850.00 1.00 7,100.00 603.0001 VIDEO INSPECTION LF 32,250. .75 24,187.50 1.00 32,250.00 603.00215 15" R.C. PIPE, 2000D LF 2,550. 34.00 86,700.00 45.00 114,750.00 603.00218 18" R.C. PIPE, 2000D LF 840. 38.00 31,920.00 48.00 40,320.00 603.00224 24" R.C. PIPE, 2000D LF 1,750. 45.00 78,750.00 64.00 112,000.00 603.00230 30" R.C. PIPE, 2000D LF 360. 56.00 20,160.00 81.00 29,160.00 603.00242 42" R.C. PIPE, 2000D LF 160. 82.00 13,120.00 132.00 21,120.00 603.00248 48" R.C. PIPE, 2000D LF 425. 100.00 42,500.00 160.00 68,000.00 603.00260 60" R.C. PIPE, 2000D LF 305. 160.00 48,800.00 250.00 76,250.00 603.00315 15" R.C. PIPE, 3000D LF 45. 36.00 1,620.00 50.00 2,250.00 603.00430 30" R.C. PIPE, 3750D LF 220. 73.00 16,060.00 95.00 20,900.00 603.11008 8" CORR. STEEL PIPE, .064 LF 17. 47.00 799.00 38.00 646.00 11238M PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.11012 12" CORR. STEEL PIPE, .064" LF 19. 48.00 912.00 42.00 798.00 603.33115 15" CORR. POLYETHYLENE END SECTION EA 4. 200.00 800.00 300.00 1,200.00 603.33118 18" CORR. POLYETHYLENE END SECTION EA 4. 235.00 940.00 350.00 1,400.00 603.33124 24" CORR. POLYETHYLENE END SECTION EA 1. 260.00 260.00 425.00 425.00 603.33130 30" CORR. POLYETHYLENE END SECTION EA 3. 480.00 1,440.00 750.00 2,250.00 603.36112 12" ALUMINIZED STEEL END SECTION EA 6. 215.00 1,290.00 250.00 1,500.00 603.36118 18" ALUMINIZED STEEL END SECTION EA 1. 265.00 265.00 350.00 350.00 603.36130 30" ALUMINIZED STEEL END SECTION EA 2. 480.00 960.00 850.00 1,700.00 603.391 RESETTING CONCRETE END SECTIONS EA 2. 285.00 570.00 300.00 600.00 603.44015 15" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 57. 38.00 2,166.00 41.00 2,337.00 603.491 24" CMP REPAIR SLEEVE EA 3. 275.00 825.00 350.00 1,050.00 603.50012 12" PIPE FOR DRIVES & MINOR APPROACHES LF 130. 38.00 4,940.00 48.00 6,240.00 603.60015 LAYING/RELAYING 15" DRAINAGE PIPE LF 25. 38.00 950.00 75.00 1,875.00 603.60024 LAYING/RELAYING 24" DRAINAGE PIPE LF 60. 38.00 2,280.00 80.00 4,800.00 603.82118 18" PE PIPE (TYPE C) LF 47. 31.00 1,457.00 42.00 1,974.00 603.82124 24" PE PIPE (TYPE C) LF 68. 36.00 2,448.00 52.00 3,536.00 603.82215 15" PE PIPE (TYPE S) LF 22,050. 26.00 573,300.00 38.00 837,900.00 603.82218 18" PE PIPE (TYPE S) LF 4,500. 31.00 139,500.00 45.00 202,500.00 603.82224 24" PE PIPE (TYPE S) LF 4,200. 36.00 151,200.00 55.00 231,000.00 603.82230 30" PE PIPE (TYPE S) LF 970. 48.00 46,560.00 70.00 67,900.00 604.0007 POLYETHYLENE LINER EA 220. 215.00 47,300.00 250.00 55,000.00 604.114 CATCH BASINS TYPE A, 4-FOOT DIAMETER U 84. 2,100.00 176,400.00 2,600.00 218,400.00 604.115 CATCH BASINS TYPE A, 5-FOOT DIAMETER U 21. 2,800.00 58,800.00 3,400.00 71,400.00 604.1152 CATCH BASIN TYPE A, DOUBLE GRATE, 5' DIA U 7. 3,400.00 23,800.00 4,200.00 29,400.00 604.11525 CATCH BASINS TYPE A, DOUBLE GRATE 5' DIA 5% CROSS SLOPE U 1. 3,400.00 3,400.00 4,900.00 4,900.00 604.116 CATCH BASINS TYPE A, 6-FOOT DIAMETER U 6. 3,400.00 20,400.00 5,000.00 30,000.00 604.118 CATCH BASIN TYPE A, 8-FOOT DIAMETER U 2. 8,000.00 16,000.00 10,000.00 20,000.00 604.12 CATCH BASINS TYPE B U 60. 2,000.00 120,000.00 2,600.00 156,000.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 3. 2,800.00 8,400.00 2,400.00 7,200.00 11238M PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.1252 CATCH BASIN TYPE B, 5' DIA., DOUBLE GRATE U 3. 3,200.00 9,600.00 4,900.00 14,700.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 3,300.00 6,600.00 4,000.00 8,000.00 604.15 CATCH BASINS TYPE E U 55. 2,150.00 118,250.00 2,600.00 143,000.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 22. 2,900.00 63,800.00 4,200.00 92,400.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 2. 3,500.00 7,000.00 4,900.00 9,800.00 604.158 CATCH BASINS TYPE E, 8-FOOT DIAMETER U 2. 6,500.00 13,000.00 10,000.00 20,000.00 604.16 CATCH BASINS TYPE F U 40. 2,100.00 84,000.00 2,500.00 100,000.00 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 5. 2,800.00 14,000.00 4,100.00 20,500.00 604.1652 CATCH BASINS TYPE F, 5' DIA., DOUBLE GRATE U 6. 3,100.00 18,600.00 4,900.00 29,400.00 604.241 DROP INLETS TYPE D-A U 5. 1,550.00 7,750.00 2,000.00 10,000.00 604.245 DROP INLETS TYPE D-E U 9. 1,600.00 14,400.00 2,000.00 18,000.00 604.25 DROP INLETS TYPE E U 6. 1,650.00 9,900.00 2,000.00 12,000.00 604.258 DROP INLETS TYPE E, 8-FOOT DIAMETER U 2. 5,800.00 11,600.00 10,000.00 20,000.00 604.32 DRAINAGE MANHOLES U 19. 2,100.00 39,900.00 2,900.00 55,100.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 7. 2,800.00 19,600.00 3,600.00 25,200.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 21. 325.00 6,825.00 400.00 8,400.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 24. 400.00 9,600.00 400.00 9,600.00 604.62 DRAINAGE MANHOLE COVERS AND FRAMES EA 1. 600.00 600.00 500.00 500.00 604.9101 OUTLET CONTROL STRUCTURE U 1. 1,900.00 1,900.00 4,000.00 4,000.00 604.9102 OUTLET CONTROL STRUCTURE U 2. 1,900.00 3,800.00 4,000.00 8,000.00 604.9103 OUTLET CONTROL STRUCTURE U 2. 1,900.00 3,800.00 4,000.00 8,000.00 604.9104 OUTLET CONTROL STRUCTURE U 2. 1,900.00 3,800.00 8,000.00 16,000.00 604.9105 OUTLET CONTROL STRUCTURE U 2. 1,900.00 3,800.00 4,200.00 8,400.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 19,500. 16.50 321,750.00 24.00 468,000.00 605.508 8" PERF. CORR. POLYETHYL PIPE UND. LF 6,300. 17.50 110,250.00 26.00 163,800.00 605.79 UNDERDRAIN FLUSHING BASINS EA 57. 300.00 17,100.00 400.00 22,800.00 605.82251 24" AGGRE. UND. TYPE 2 WITH 6" P.C. POLY PIPE LF 3,500. 30.00 105,000.00 31.00 108,500.00 605.82258 24" AGGRE. UND. TYPE 2 WITH 8" P.C. POLY PIPE LF 2,950. 30.00 88,500.00 34.00 100,300.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,700. 17.00 147,900.00 19.00 165,300.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) (STEEL POST) LF 190. 25.00 4,750.00 31.00 5,890.00 11238M PAGE 9 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 3. 2,000.00 6,000.00 2,200.00 6,600.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 20. 1,700.00 34,000.00 1,800.00 36,000.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 12. 500.00 6,000.00 550.00 6,600.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 110. 18.00 1,980.00 28.00 3,080.00 606.2120 DOUBLE-FACED BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,200. 22.00 26,400.00 26.00 31,200.00 606.21203 DOUBLE-FACED BEAM GUARDRAIL (GALVANIZED), THRIE BEAM (STEEL POST) LF 850. 38.00 32,300.00 40.00 34,000.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 5. 3,000.00 15,000.00 3,200.00 16,000.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 1. 4,500.00 4,500.00 4,500.00 4,500.00 606.3221 DOUBLE FACED TRANSITION RAIL, STEEL POST (F-SHAPE BARRIER) U 1. 4,500.00 4,500.00 4,500.00 4,500.00 606.41211 TRANSITION MEDIAN CONCRET BARRIER, PRECAST U 1. 1,800.00 1,800.00 1,600.00 1,600.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 5. 3,600.00 18,000.00 5,500.00 27,500.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 7,400. 72.00 532,800.00 75.00 555,000.00 606.4133 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST (10' SECTION) LF 340. 77.00 26,180.00 88.00 29,920.00 606.4139 SINGLE SLOPE CONCRETE BARRIER, PRECAST (MODIFIED)(54") LF 660. 90.00 59,400.00 88.00 58,080.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 22,600. 23.00 519,800.00 40.00 904,000.00 606.4171 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL - LEFT IN PLACE LF 140. 32.00 4,480.00 40.00 5,600.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 2. 1,300.00 2,600.00 1,400.00 2,800.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 8. 3,100.00 24,800.00 2,100.00 16,800.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 9. 4,200.00 37,800.00 3,800.00 34,200.00 607.146 WOVEN WIRE FENCE 4'-6" HIGH LF 1,925. 8.00 15,400.00 7.50 14,437.50 11238M PAGE 10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 607.360 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC, 6' HIGH LF 13,160. 17.00 223,720.00 24.00 315,840.00 607.4146 POST ASSEMBLIES FOR WOVEN WIRE FENCE, 4'-6" HIGH EA 11. 175.00 1,925.00 230.00 2,530.00 607.4360 POST ASSEMBLIES FOR CHAIN LINK FENCE WITH VINYL CTD STL FABRIC, 6' HIGH EA 73. 175.00 12,775.00 275.00 20,075.00 607.73518 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 5' HIGH U 2. 1,300.00 2,600.00 1,650.00 3,300.00 607.73618 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 6' HIGH U 1. 1,350.00 1,350.00 1,700.00 1,700.00 607.78618 18' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 3. 1,400.00 4,200.00 1,800.00 5,400.00 607.78624 24' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 1. 1,600.00 1,600.00 2,700.00 2,700.00 607.860 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC & BARBED WIRE, 6' LF 3,160. 20.00 63,200.00 26.00 82,160.00 607.9804 RESETTING IRON GATE, 4' HIGH LF 14. 85.00 1,190.00 210.00 2,940.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 4,800. 12.00 57,600.00 22.00 105,600.00 608.24 4" CONCRETE SIDEWALK (F) SY 240. 34.00 8,160.00 44.00 10,560.00 608.26 6" CONCRETE SIDEWALK (F) SY 1,640. 36.00 59,040.00 48.00 78,720.00 608.28 8" CONCRETE SIDEWALK (F) SY 470. 38.00 17,860.00 52.00 24,440.00 608.38 8" REINFORCED CONCRETE SIDEWALK (F) SY 605. 42.00 25,410.00 55.00 33,275.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 63. 375.00 23,625.00 400.00 25,200.00 609.01 STRAIGHT GRANITE CURB LF 6,790. 16.00 108,640.00 19.00 129,010.00 609.01123 STRAIGHT GRANITE CURB 12" HIGH, WITH 3"X3" MOUNTABLE BEVELED EDGE LF 340. 22.00 7,480.00 20.00 6,800.00 609.02 CURVED GRANITE CURB LF 230. 28.00 6,440.00 27.00 6,210.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 13,280. 12.25 162,680.00 16.50 219,120.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 5,540. 14.00 77,560.00 16.50 91,410.00 609.22 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS LF 63. 13.00 819.00 14.00 882.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 80. 14.00 1,120.00 16.50 1,320.00 609.23 CURVED GRANITE SLOPE CURB LF 25. 64.00 1,600.00 72.00 1,800.00 11238M PAGE 11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.236 CURVED GRANITE SLOPE CURB 6" HIGH LF 2. 64.00 128.00 75.00 150.00 609.5 RESET GRANITE CURB LF 1,550. 5.10 7,905.00 8.00 12,400.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 1,080. 4.00 4,320.00 5.00 5,400.00 609.930 SPECIAL GRANITE CURB (REVEAL 12" TO 18") LF 55. 72.00 3,960.00 37.00 2,035.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 90. 50.00 4,500.00 60.00 5,400.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 2,600. 65.00 169,000.00 78.00 202,800.00 611.05216 16" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 240. 75.00 18,000.00 102.00 24,480.00 611.05220 20" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,500. 110.00 165,000.00 46.00 69,000.00 611.05412 12" EXTRA HEAVY DUTY DUCTILE IRON WATER PIPE, CL. 54 LF 170. 90.00 15,300.00 115.00 19,550.00 611.35136 36" DIRECT BURY CASING PIPE WITH 16" DIAMETER CL 52 CARRIER PIPE LF 200. 250.00 50,000.00 400.00 80,000.00 611.36024 DIRECT BURY CASING PIPE LF 190. 50.00 9,500.00 100.00 19,000.00 611.70008 8" FITTING EA 6. 450.00 2,700.00 500.00 3,000.00 611.70010 10" FITTING EA 2. 500.00 1,000.00 600.00 1,200.00 611.70012 12" FITTING EA 23. 675.00 15,525.00 950.00 21,850.00 611.70016 16 " FITTING EA 4. 1,200.00 4,800.00 2,000.00 8,000.00 611.70020 20" FITTING EA 7. 1,850.00 12,950.00 3,000.00 21,000.00 611.71006 6" GATE VALVE EA 4. 1,000.00 4,000.00 1,200.00 4,800.00 611.71008 8" GATE VALVE EA 2. 1,200.00 2,400.00 1,800.00 3,600.00 611.71012 12" GATE VALVE EA 1. 2,150.00 2,150.00 3,000.00 3,000.00 611.71016 16" GATE VALVE EA 1. 5,800.00 5,800.00 7,000.00 7,000.00 611.71020 20" GATE VALVE EA 3. 13,700.00 41,100.00 18,000.00 54,000.00 611.81 HYDRANTS EA 4. 2,600.00 10,400.00 5,000.00 20,000.00 611.84 MANUAL AIR RELEASE EA 1. 1,450.00 1,450.00 3,500.00 3,500.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 200.00 3,000.00 120.00 1,800.00 611.951 WATER MAIN INSULATION SY 330. 20.00 6,600.00 12.00 3,960.00 612.3104 4-FOOT DIAMETER SEWER MANHOLE VF 21. 325.00 6,825.00 400.00 8,400.00 612.313 MODIFY EXISTING MANHOLE (REBUILD INVERT) EA 1. 600.00 600.00 500.00 500.00 612.33 INSTALL DROP CONNECTION VF 4. 180.00 720.00 200.00 800.00 612.3508 8" PVC SEWER PIPE LF 122. 42.00 5,124.00 45.00 5,490.00 612.35124 8" PVC SEWER PIPE WITH 24" STEEL CASING LF 440. 120.00 52,800.00 175.00 77,000.00 612.951 SEWER MAIN INSULATION SY 30. 20.00 600.00 12.00 360.00 614.321 2" STEEL CONDUIT LF 200. 12.00 2,400.00 13.00 2,600.00 614.331 3" STEEL CONDUIT LF 810. 16.00 12,960.00 18.00 14,580.00 614.3439 4 INCH 3-DUCT STEEL CONDUIT (BRIDGE) LF 345. 60.00 20,700.00 66.00 22,770.00 11238M PAGE 12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 614.511 CONCRETE PULL BOX 14" EA 9. 310.00 2,790.00 341.00 3,069.00 614.512 CONCRETE PULL BOX 18" EA 6. 410.00 2,460.00 449.00 2,694.00 614.51821 CONCRETE FIBER OPTIC SPLICE VAULT 48"X48"X48" U 8. 2,560.00 20,480.00 2,804.00 22,432.00 614.51823 CONCRETE FIBER OPTIC SPLICE VAULT 48"X96"X48" U 4. 4,400.00 17,600.00 4,896.00 19,584.00 614.5183 30" CONCRETE FIBER OPTIC MANHOLE EA 2. 2,125.00 4,250.00 2,322.00 4,644.00 614.523 MOLDED PULL BOX 17"X30" EA 56. 425.00 23,800.00 440.00 24,640.00 614.72114 2" PVC CONDUIT, SCHEDULE 40 LF 515. 6.00 3,090.00 7.00 3,605.00 614.72118 2" PVC CONDUIT, SCHEDULE 80 LF 58. 12.00 696.00 13.00 754.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 4,850. 6.00 29,100.00 7.00 33,950.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 1,750. 13.50 23,625.00 15.00 26,250.00 614.73214 3" 2-DUCT PVC CONDUIT, SCHEDULE 40 LF 7. 13.00 91.00 14.00 98.00 614.73218 3" 2-DUCT PVC CONDUIT, SCHEDULE 80 LF 90. 14.00 1,260.00 15.00 1,350.00 614.74221 4" 2-DUCT HDPE CONDUIT, SDR 13.5 LF 13,850. 14.50 200,825.00 16.00 221,600.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 714. 49.00 34,986.00 54.00 38,556.00 615.013 REMOVING TRAFFIC SIGN TYPE A U 16. 392.00 6,272.00 548.00 8,768.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 7. 4,410.00 30,870.00 6,408.00 44,856.00 615.02 TRAFFIC SIGN TYPE B (F) SF 292.3 52.00 15,199.60 44.00 12,861.20 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 775.75 88.00 68,266.00 104.00 80,678.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 10. 1,200.00 12,000.00 2,043.00 20,430.00 615.03 TRAFFIC SIGN TYPE C (F) SF 868. 44.00 38,192.00 117.00 101,556.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 3. 98.00 294.00 192.00 576.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 1,936. 16.50 31,944.00 19.00 36,784.00 615.043 REMOVING TRAFFIC SIGN TYPE AA U 9. 250.00 2,250.00 548.00 4,932.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 64. 12.00 768.00 40.00 2,560.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 91. 10.00 910.00 10.00 910.00 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 165,500.00 165,500.00 140,000.00 140,000.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 180,000.00 180,000.00 155,000.00 155,000.00 615.10003 FULL TRAFFIC SIGN STRUCTURE U 1. 225,000.00 225,000.00 200,000.00 200,000.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 35,000.00 35,000.00 32,000.00 32,000.00 11238M PAGE 13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 42,000.00 42,000.00 40,000.00 40,000.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,000.00 2,000.00 3,000.00 3,000.00 615.20302 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,000.00 2,000.00 3,000.00 3,000.00 615.20303 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,000.00 2,000.00 3,000.00 3,000.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 10,000.00 10,000.00 14,000.00 14,000.00 616.101 TRAFFIC SIGNALS U 1. 85,000.00 85,000.00 90,000.00 90,000.00 616.141 COMPUTER EQUIPMENT AND TRAFFIC SIGNAL SOFTWARE U 1. 5,450.00 5,450.00 6,000.00 6,000.00 616.151 TRAFFIC SIGNAL (FIBER OPTIC) U 1. 6,500.00 6,500.00 6,500.00 6,500.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 15,000.00 15,000.00 16,500.00 16,500.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 12,000.00 12,000.00 13,250.00 13,250.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 14,500.00 14,500.00 17,000.00 17,000.00 616.164 TRAFFIC SIGNALS (TEMP.) U 1. 8,500.00 8,500.00 10,000.00 10,000.00 616.165 TRAFFIC SIGNALS (TEMP.) U 1. 8,500.00 8,500.00 10,000.00 10,000.00 616.166 TRAFFIC SIGNALS (TEMP.) U 1. 2,500.00 2,500.00 2,500.00 2,500.00 616.167 TRAFFIC SIGNALS (TEMP.) U 1. 20,000.00 20,000.00 21,000.00 21,000.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 18,000.00 18,000.00 20,000.00 20,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 583,000.00 583,000.00 583,000.00 583,000.00 618.7 FLAGGERS HR 4,000. 16.00 64,000.00 19.00 76,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 400,000.00 400,000.00 384,193.00 384,193.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 11. 20,000.00 220,000.00 22,000.00 242,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 3. 4,500.00 13,500.00 8,000.00 24,000.00 619.501 SMART WORK ZONE DEVELOPMENT U 1. 25,000.00 25,000.00 27,000.00 27,000.00 619.502 SMART WORK ZONE OPERATIONAL COSTS MON 16. 1,750.00 28,000.00 1,950.00 31,200.00 619.503 SMART WORK ZONE OPERATIONAL COSTS (SUMMER) MON 35. 875.00 30,625.00 900.00 31,500.00 619.51 PORTABLE QUEUE TRAILER/ SENSOR (PQT) MON 612. 575.00 351,900.00 650.00 397,800.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 153. 1,000.00 153,000.00 1,000.00 153,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 2. 10,000.00 20,000.00 26,500.00 53,000.00 619.91 RELOCATE SMART WORK ZONE DEVICE U 25. 175.00 4,375.00 210.00 5,250.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 90. 4.90 441.00 16.00 1,440.00 11238M PAGE 14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 165. 4.00 660.00 5.00 825.00 621.31 SINGLE DELINEATOR WITH POST EA 140. 24.50 3,430.00 36.00 5,040.00 621.32 DOUBLE DELINEATOR WITH POST EA 22. 29.50 649.00 43.00 946.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 10. 29.50 295.00 43.00 430.00 621.61 FIBER OPTIC DELINEATOR EA 27. 100.00 2,700.00 160.00 4,320.00 621.71 FLEXIBLE DELINEATORS, SOIL MOUNT EA 200. 44.00 8,800.00 105.00 21,000.00 621.73 FLEXIBLE DELINEATORS, (TEMPORARY) EA 18. 34.00 612.00 82.00 1,476.00 622.1 STEEL WITNESS MARKERS EA 185. 28.00 5,180.00 32.00 5,920.00 622.2 CONCRETE BOUNDS EA 44. 330.00 14,520.00 200.00 8,800.00 622.4 STONE BOUNDS EA 22. 300.00 6,600.00 250.00 5,500.00 625.2 CONCRETE LIGHT POLE BASES, TYPE B EA 16. 550.00 8,800.00 750.00 12,000.00 625.52 LIGHT POLE U 5. 1,700.00 8,500.00 1,850.00 9,250.00 625.62 RESET/RELOCATE LIGHT POLES EA 11. 375.00 4,125.00 400.00 4,400.00 628.2 SAWED BITUMINOUS PAVEMENT LF 6,500. .60 3,900.00 2.00 13,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 145,100. .10 14,510.00 .10 14,510.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 514,800. .10 51,480.00 .13 66,924.00 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 490. .75 367.50 .80 392.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 21,850. .30 6,555.00 .21 4,588.50 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 490. 2.25 1,102.50 2.10 1,029.00 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 165. 4.00 660.00 4.00 660.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 3,250. .60 1,950.00 .55 1,787.50 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 4,100. .60 2,460.00 .66 2,706.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 2,650. .75 1,987.50 .85 2,252.50 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 14,250. 1.28 18,240.00 1.40 19,950.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 785. 4.00 3,140.00 4.00 3,140.00 632.3124 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 24" LINE LF 235. 6.00 1,410.00 6.00 1,410.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 3,050. 6.00 18,300.00 6.00 18,300.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 80,500. .25 20,125.00 .35 28,175.00 11238M PAGE 15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 641. LOAM CY 1,860. 20.00 37,200.00 22.00 40,920.00 643.22 FERTILIZER FOR REFERTILIZATION TON 32. 975.00 31,200.00 700.00 22,400.00 644.22 SHRUB/FOREST WETLAND SEED MIX LB 65. 115.00 7,475.00 200.00 13,000.00 644.741 UPLAND SEED MIX LB 5. 95.00 475.00 27.00 135.00 645.0001 TURBIDITY BARRIER LF 755. 20.00 15,100.00 16.00 12,080.00 645.11 MULCH A 6. 800.00 4,800.00 900.00 5,400.00 645.113 HYDRAULIC MULCH LB 75,000. .50 37,500.00 .80 60,000.00 645.119 MULCH WITH TACKIFIERS A 35. 950.00 33,250.00 1,150.00 40,250.00 645.2535 COIR FIBER MATTING FOR EROSION CONTROL SY 5,000. 3.50 17,500.00 2.25 11,250.00 645.254 COIR FIBER ROLLS LF 1,750. 5.00 8,750.00 11.00 19,250.00 645.3 EROSION STONE TON 18,050. 26.00 469,300.00 25.00 451,250.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 394,800. 1.28 505,344.00 1.50 592,200.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 59,550. 3.85 229,267.50 4.00 238,200.00 645.455 CHANNEL STABILIZATION - ROOTWADS U 9. 1,000.00 9,000.00 950.00 8,550.00 645.48 EROSION CONTROL MIX CY 5,650. 22.00 124,300.00 30.00 169,500.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 1,600. 22.00 35,200.00 3.00 4,800.00 645.482 STUMP GRINDING FOR TEMPORARY EROSION CONTROL CY 8,500. 22.00 187,000.00 3.00 25,500.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 8.00 1,600.00 10.00 2,000.00 645.512 COMPOST SOCK FOR PERIMETER BERM LF 46,700. 4.50 210,150.00 3.75 175,125.00 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL LB 3,200. 2.45 7,840.00 .80 2,560.00 645.531 SILT FENCE LF 54,600. 2.35 128,310.00 2.00 109,200.00 645.611 BONDED FIBER MATRIX (BFM) LB 70,100. 1.10 77,110.00 1.00 70,100.00 645.612 FIBER REINFORCED MATRIX (FRM) LB 13,200. 1.25 16,500.00 3.00 39,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 60,000.00 60,000.00 40,000.00 40,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 2,850. 45.00 128,250.00 52.00 148,200.00 645.81 STORMWATER REMOVAL - TRUCKING HR 400. 90.00 36,000.00 85.00 34,000.00 645.8103 EROSION CONTROL PUMP (300 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,650.00 165,000.00 1.00 100.00 645.8105 EROSION CONTROL PUMP (500 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,750.00 175,000.00 1.00 100.00 11238M PAGE 16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.8110 EROSION CONTROL PUMP (1000 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 2,100.00 210,000.00 1.00 100.00 645.8203 EROSION CONTROL PUMP (300 GAL/MIN DISCHARGE CAPACITY) U 1. 72,500.00 72,500.00 1.00 1.00 645.8205 EROSION CONTROL PUMP (500 GAL/MIN DISCHARGE CAPACITY) U 1. 78,000.00 78,000.00 1.00 1.00 645.8210 EROSION CONTROL PUMP (1000 GAL/MIN DISCHARGE CAPACITY) U 6. 114,000.00 684,000.00 1.00 6.00 645.85 FLOCCULANT TREATMENT SYSTEM (FTS) MON 38. 11,500.00 437,000.00 8,742.00 332,196.00 645.851 WATER QUALITY MONITORING FOR CONSTRUCTION STORMWATER HR 730. 50.00 36,500.00 71.00 51,830.00 646.2 TURF ESTABLISHMENT WITHOUT MULCH A 73. 5,500.00 401,500.00 5,176.00 377,848.00 647.1 HUMUS CY 28,900. 16.50 476,850.00 11.00 317,900.00 647.29 WETLAND HUMUS CY 16,050. 21.00 337,050.00 11.00 176,550.00 650.2 LANDSCAPING U 1. 160,000.00 160,000.00 190,988.00 190,988.00 650.3 LANDSCAPING - WETLAND MITIGATION U 1. 145,000.00 145,000.00 117,254.00 117,254.00 659.401 LANDSCAPE ESTABLISHMENT CREW (4 MEN- 8 HR DAY) DAY 4. 950.00 3,800.00 1,205.00 4,820.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 5. 250.00 1,250.00 329.00 1,645.00 670.04501 CONSTRUCT AND REMOVE DIVERSION U 1. 135,000.00 135,000.00 120,000.00 120,000.00 670.04502 CONSTRUCT AND REMOVE DIVERSION U 1. 45,000.00 45,000.00 38,000.00 38,000.00 670.04503 CONSTRUCT AND REMOVE DIVERSION U 1. 120,000.00 120,000.00 100,000.00 100,000.00 670.04504 CONSTRUCT AND REMOVE DIVERSION U 1. 52,000.00 52,000.00 51,000.00 51,000.00 670.04505 CONSTRUCT AND REMOVE DIVERSION U 1. 17,000.00 17,000.00 16,000.00 16,000.00 670.04506 CONSTRUCT AND REMOVE DIVERSION U 1. 5,000.00 5,000.00 5,800.00 5,800.00 670.04507 CONSTRUCT AND REMOVE DIVERSION U 1. 5,500.00 5,500.00 6,500.00 6,500.00 670.04508 CONSTRUCT AND REMOVE DIVERSION U 1. 42,000.00 42,000.00 34,000.00 34,000.00 670.04509 CONSTRUCT AND REMOVE DIVERSION U 1. 19,500.00 19,500.00 17,000.00 17,000.00 670.04510 CONSTRUCT AND REMOVE DIVERSION U 1. 30,000.00 30,000.00 28,000.00 28,000.00 670.04511 CONSTRUCT AND REMOVE DIVERSION U 1. 50,000.00 50,000.00 45,000.00 45,000.00 11238M PAGE 17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.04512 CONSTRUCT AND REMOVE DIVERSION U 1. 15,000.00 15,000.00 11,000.00 11,000.00 670.04513 CONSTRUCT AND REMOVE DIVERSION U 1. 17,000.00 17,000.00 16,000.00 16,000.00 670.04514 CONSTRUCT AND REMOVE DIVERSION U 1. 3,000.00 3,000.00 5,000.00 5,000.00 670.04515 CONSTRUCT AND REMOVE DIVERSION U 1. 12,500.00 12,500.00 11,500.00 11,500.00 670.04516 CONSTRUCT AND REMOVE DIVERSION U 1. 80,000.00 80,000.00 72,000.00 72,000.00 670.04517 CONSTRUCT AND REMOVE DIVERSION U 1. 2,000.00 2,000.00 2,500.00 2,500.00 670.04518 CONSTRUCT AND REMOVE DIVERSION U 1. 25,000.00 25,000.00 21,800.00 21,800.00 670.04519 CONSTRUCT AND REMOVE DIVERSION U 1. 1,200.00 1,200.00 2,000.00 2,000.00 670.04520 CONSTRUCT AND REMOVE DIVERSION U 1. 34,000.00 34,000.00 31,000.00 31,000.00 670.04521 CONSTRUCT AND REMOVE DIVERSION U 1. 17,500.00 17,500.00 16,000.00 16,000.00 670.04522 CONSTRUCT AND REMOVE DIVERSION U 1. 19,000.00 19,000.00 17,500.00 17,500.00 670.04523 CONSTRUCT AND REMOVE DIVERSION U 1. 1,200.00 1,200.00 2,500.00 2,500.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 12,000.00 48,000.00 15,500.00 62,000.00 670.812 CONSTRUCT CONCRETE SIDEWALK U 1. 106,000.00 106,000.00 104,000.00 104,000.00 670.95 TEMPORARY SAFETY FENCE LF 750. 3.50 2,625.00 4.00 3,000.00 671.603 3" PVC CONDUIT, SCHEDULE 80, DIRECTIONAL BORE LF 70. 75.00 5,250.00 71.00 4,970.00 677.12 PERMANENT FIXED LOCATION DYNAMIC MESSAGE SIGN (DMS) U 1. 84,000.00 84,000.00 92,000.00 92,000.00 677.4101 CCTV SYSTEM U 1. 52,000.00 52,000.00 62,000.00 62,000.00 677.4102 CCTV SYSTEM U 1. 52,000.00 52,000.00 62,000.00 62,000.00 677.42 ROADWAY WEATHER INFORMATION STATION (RWIS) SYSTEM U 1. 76,000.00 76,000.00 78,000.00 78,000.00 677.421 NON-INVASIVE PAVEMENT SENSOR SYSTEM U 1. 17,000.00 17,000.00 20,000.00 20,000.00 677.51012 12-STRAND SINGLE MODE FIBER OPTIC CABLE LF 12,850. 3.25 41,762.50 3.50 44,975.00 677.51072 72-STRAND SINGLE MODE FIBER OPTIC CABLE LF 2,750. 5.00 13,750.00 5.00 13,750.00 677.53 FIBER OPTIC SPLICE EA 16. 80.00 1,280.00 82.00 1,312.00 677.54101 GROUND MOUNTED ITS EQUIPMENT CABINET U 1. 12,000.00 12,000.00 13,200.00 13,200.00 677.54201 POLE MOUNTED ITS EQUIPMENT CABINET U 1. 14,500.00 14,500.00 15,130.00 15,130.00 11238M PAGE 18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 677.561 FIBER OPTIC PATCH PANEL (12-POSITION) EA 2. 1,800.00 3,600.00 2,000.00 4,000.00 677.5821 100 MBPS FIBER ETHERNET SWITCH EA 2. 3,500.00 7,000.00 4,800.00 9,600.00 677.6201 MEDIA CONVERTER U 1. 3,500.00 3,500.00 4,250.00 4,250.00 677.6301 METER AND DISCONNECT PEDESTAL U 1. 3,500.00 3,500.00 3,970.00 3,970.00 677.6302 METER AND DISCONNECT PEDESTAL U 1. 3,500.00 3,500.00 3,970.00 3,970.00 677.64 UNINTERRUPTABLE POWER SUPPLY (UPS) EA 1. 12,000.00 12,000.00 15,200.00 15,200.00 677.9304 3-CONDUCTOR #4 AWG CABLE LF 620. 8.50 5,270.00 10.00 6,200.00 692. MOBILIZATION U 1. 2,615,000.00 2,615,000.00 4,980,000.00 4,980,000.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 2,500.00 2,500.00 6,000.00 6,000.00 697.21 PROJECT HEALTH AND SAFETY PLAN U 1. 850.00 850.00 3,000.00 3,000.00 697.41 CRITICAL PATH METHOD (CPM) ELECTRONIC SCHEDULE U 1. 12,000.00 12,000.00 8,000.00 8,000.00 698.11 FIELD OFFICE TYPE A MON 42. 1,800.00 75,600.00 2,500.00 105,000.00 698.2 PHYSICAL TESTING LABORATORY MON 38. 750.00 28,500.00 1,500.00 57,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 752,000.00 752,000.00 752,000.00 752,000.00 1006.22 SPECIAL WORK - SOIL TESTING $ 1. 65,000.00 65,000.00 65,000.00 65,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 1010.15 FUEL ADJUSTMENT $ 1. 250,000.00 250,000.00 250,000.00 250,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 275,000.00 275,000.00 275,000.00 275,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 $46,937,813.25 $49,883,716.20 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: NEWINGTON-DOVER 11238M COUNTIES AND CODES: ROCKINGHAM 015 STRAFFORD 017 DATE BIDS OPEN: JUNE 28, 2012 SCOPE OF WORK: WIDENING AND RECONSTRUCTION OF A SEGMENT OF THE SPAULDING TURNPIKE LOCATION: SPAULDING TURNPIKE (NH 16) COMPLETION DATE: JULY 17, 2015 A ALVIN J. COLEMAN & SON, INC. 9 NH ROUTE 113, CONWAY, NH 03818 $43,155,392.45 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $45,719,260.62 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $46,435,160.05 D R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $46,937,813.25 E SARGENT CORPORATION 378 BENOCH ROAD, PO BOX 435, STILLWATER, MAINE 04489 $49,883,716.20 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.1 CLEARING AND GRUBBING (F) A 38. 6,530.00 248,140.00 5,500.00 209,000.00 39,140.00 201.21 REMOVING SMALL TREES EA 110. 250.00 27,500.00 200.00 22,000.00 5,500.00 201.22 REMOVING LARGE TREES EA 2. 750.00 1,500.00 750.00 1,500.00 201.881 INVASIVE SPECIES CONTROL TYPE I SY 146,100. .42 61,362.00 1.50 219,150.00 -157,788.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 16,000. 1.00 16,000.00 1.50 24,000.00 -8,000.00 202.31 FILL ABANDONED PIPE CY 150. 150.00 22,500.00 155.00 23,250.00 -750.00 202.32 FILL AND ABANDON STRUCTUR CY 21. 150.00 3,150.00 200.00 4,200.00 -1,050.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 16,500. 6.00 99,000.00 9.00 148,500.00 -49,500.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 1,200. 12.00 14,400.00 12.00 14,400.00 202.43 REMOVAL OF EXIST. ASBEST. CEMENT PIPE, 0-24" DIAM. LF 428. 23.55 10,079.40 29.00 12,412.00 -2,332.60 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 85. 250.00 21,250.00 325.00 27,625.00 -6,375.00 202.6 CURB REMOVAL FOR STORAGE LF 1,300. 4.20 5,460.00 2.50 3,250.00 2,210.00 202.7 REMOVAL OF GUARDRAIL LF 11,280. 1.00 11,280.00 2.50 28,200.00 -16,920.00 202.74 REMOVAL OF CONCRETE BARRIER LF 2,050. 10.45 21,422.50 7.00 14,350.00 7,072.50 11238M PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.8 REMOVAL OF FENCE LF 1,900. 1.10 2,090.00 5.00 9,500.00 -7,410.00 203.1 COMMON EXCAVATION CY 366,700. 4.90 1,796,830.00 5.00 1,833,500.00 -36,670.00 203.2 ROCK EXCAVATION CY 116,500. 11.25 1,310,625.00 15.00 1,747,500.00 -436,875.00 203.35 HANDLING EXCAVATED, CONTAMINATED SOILS (DEPARTMENT DISPOSAL) CY 255. 50.00 12,750.00 20.00 5,100.00 7,650.00 203.352 EXCAVATE AND STOCKPILE CONTAMINATED SOIL CY 21,000. 3.00 63,000.00 15.00 315,000.00 -252,000.00 203.4 MUCK EXCAVATION CY 7,500. 4.20 31,500.00 10.00 75,000.00 -43,500.00 203.49 WETLAND SOIL EXCAVATION CY 760. 21.35 16,226.00 15.00 11,400.00 4,826.00 203.52 IMPERVIOUS MATERIAL (F) CY 3,055. 14.95 45,672.25 15.00 45,825.00 -152.75 203.55261 INSTALLATION AND REMOVAL OF SWZ - PORTABLE QUEUE TRAILER PLATFORM U 10. 1,500.00 15,000.00 2,000.00 20,000.00 -5,000.00 203.55262 INSTALLATION AND REMOVAL OF PORTABLE CHANGEABLE MESSAGE SIGN PLATFORM U 2. 1,500.00 3,000.00 2,500.00 5,000.00 -2,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 775.00 2,325.00 1,000.00 3,000.00 -675.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 16. 500.00 8,000.00 500.00 8,000.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 2. 500.00 1,000.00 500.00 1,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 514,300. 6.80 3,497,240.00 5.00 2,571,500.00 925,740.00 203.62 EMBANKMENT-IN-PLACE REPLACEMENT MATERIALS CY 7,500. 10.00 75,000.00 5.00 37,500.00 37,500.00 203.642 TEST EMBANKMENT U 1. 131,000.00 131,000.00 1,000,000.00 1,000,000.00 -869,000.00 203.7 REHANDLING SURCHARGE MATERIAL CY 430. 4.20 1,806.00 5.00 2,150.00 -344.00 206.1 COMMON STRUCTURE EXCAVATION CY 7,200. 7.15 51,480.00 12.00 86,400.00 -34,920.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 620. 20.00 12,400.00 50.00 31,000.00 -18,600.00 206.2 ROCK STRUCTURE EXCAVATION CY 6,100. 35.65 217,465.00 40.00 244,000.00 -26,535.00 209.1 GRANULAR BACKFILL CY 830. 20.00 16,600.00 30.00 24,900.00 -8,300.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 1,815. 19.70 35,755.50 20.00 36,300.00 -544.50 209.5 GRANULAR BACKFILL FOR MSE WALLS CY 14,200. 17.80 252,760.00 25.00 355,000.00 -102,240.00 211.11 VIBRATION MONITORING SERVICES HR 12. 80.00 960.00 100.00 1,200.00 -240.00 214. FINE GRADING U 1. 320,000.00 320,000.00 200,000.00 200,000.00 120,000.00 214.41 FINE GRADING- WETLAND MITIGATION U 1. 20,400.00 20,400.00 5,550.00 5,550.00 14,850.00 304.1 SAND (F) CY 134,257. 11.50 1,543,955.50 10.00 1,342,570.00 201,385.50 304.101 SAND CY 14,400. 13.50 194,400.00 10.00 144,000.00 50,400.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 49,250. 15.45 760,912.50 18.00 886,500.00 -125,587.50 304.41 CRUSHED STONE (FINE GRADATION) FOR SHIMMING CY 2,450. 16.75 41,037.50 18.00 44,100.00 -3,062.50 304.43 CRUSHED STONE (FINE GRADATION) FOR SHOULDER LEVELING CY 730. 25.00 18,250.00 18.00 13,140.00 5,110.00 11238M PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 304.45 CRUSHED STONE (FINE GRADATION) FOR DRIVES CY 3,550. 15.85 56,267.50 18.00 63,900.00 -7,632.50 304.499 TEMPORARY CRUSHED STONE (FINE GRADATION) CY 40. 50.00 2,000.00 25.00 1,000.00 1,000.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 44,400. 15.45 685,980.00 18.00 799,200.00 -113,220.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 7,520. 69.75 524,520.00 65.00 488,800.00 35,720.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 47,690. 64.80 3,090,312.00 65.00 3,099,850.00 -9,538.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 11,480. 64.80 743,904.00 65.00 746,200.00 -2,296.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 2,800. 74.75 209,300.00 75.00 210,000.00 -700.00 403.11201 HOT BITUMINOUS PAVEMENT ASPHALT RUBBER GAPGRADED (HMA-ARGG) (QC/QA TIER 1 TON 9,320. 87.70 817,364.00 102.00 950,640.00 -133,276.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 1,350. 105.00 141,750.00 125.00 168,750.00 -27,000.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 88,300. 1.00 88,300.00 1.00 88,300.00 403.6 PAVEMENT JOINT ADHESIVE LF 475,800. .22 104,676.00 .25 118,950.00 -14,274.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 156. 125.00 19,500.00 125.00 19,500.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,300. 72.75 94,575.00 75.00 97,500.00 -2,925.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 18,000. 65.80 1,184,400.00 65.00 1,170,000.00 14,400.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 210. 74.75 15,697.50 80.00 16,800.00 -1,102.50 411.47 PLANT MIX SURFACE TREATMENT (MODIFIED ASPHALT CEMENT), NO 4 TON 4,020. 88.80 356,976.00 80.00 321,600.00 35,376.00 417. COLD PLANING BITUMINOUS SURFACES SY 56,500. 1.50 84,750.00 3.00 169,500.00 -84,750.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 27,500. .50 13,750.00 1.50 41,250.00 -27,500.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 100,000.00 100,000.00 180,000.00 180,000.00 -80,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 40,000.00 40,000.00 18,000.00 18,000.00 22,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 5,000.00 5,000.00 3,000.00 503.102 WATER DIVERSION STRUCTURE U 1. 15,000.00 15,000.00 20,000.00 20,000.00 -5,000.00 503.103 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 8,000.00 8,000.00 503.104 WATER DIVERSION STRUCTURE U 1. 60,000.00 60,000.00 10,000.00 10,000.00 50,000.00 503.105 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 -1,000.00 503.106 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 -1,000.00 11238M PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 503.107 WATER DIVERSION STRUCTURE U 1. 4,000.00 4,000.00 5,000.00 5,000.00 -1,000.00 503.108 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 13,000.00 13,000.00 -5,000.00 503.109 WATER DIVERSION STRUCTURE U 1. 6,000.00 6,000.00 5,000.00 5,000.00 1,000.00 503.110 WATER DIVERSION STRUCTURE U 1. 8,000.00 8,000.00 7,000.00 7,000.00 1,000.00 503.201 COFFERDAMS U 1. 155,000.00 155,000.00 65,000.00 65,000.00 90,000.00 503.202 COFFERDAMS U 1. 51,600.00 51,600.00 50,000.00 50,000.00 1,600.00 503.203 COFFERDAMS U 1. 20,600.00 20,600.00 10,000.00 10,000.00 10,600.00 503.204 COFFERDAMS U 1. 4,000.00 4,000.00 15,000.00 15,000.00 -11,000.00 503.205 COFFERDAMS U 1. 4,000.00 4,000.00 10,000.00 10,000.00 -6,000.00 503.206 COFFERDAMS U 1. 4,000.00 4,000.00 10,000.00 10,000.00 -6,000.00 503.207 COFFERDAMS U 1. 4,000.00 4,000.00 10,000.00 10,000.00 -6,000.00 503.208 COFFERDAMS U 1. 4,000.00 4,000.00 18,000.00 18,000.00 -14,000.00 503.209 COFFERDAMS U 1. 4,000.00 4,000.00 18,000.00 18,000.00 -14,000.00 503.210 COFFERDAMS U 1. 4,000.00 4,000.00 18,000.00 18,000.00 -14,000.00 503.211 COFFERDAMS U 1. 4,000.00 4,000.00 18,000.00 18,000.00 -14,000.00 503.212 COFFERDAMS U 2. 12,000.00 24,000.00 57,600.00 115,200.00 -91,200.00 503.213 COFFERDAMS U 1. 4,000.00 4,000.00 9,000.00 9,000.00 -5,000.00 503.214 COFFERDAMS U 1. 4,000.00 4,000.00 9,000.00 9,000.00 -5,000.00 503.215 COFFERDAMS U 1. 8,000.00 8,000.00 9,000.00 9,000.00 -1,000.00 503.216 COFFERDAMS U 1. 6,000.00 6,000.00 38,000.00 38,000.00 -32,000.00 503.217 COFFERDAMS U 1. 6,000.00 6,000.00 83,000.00 83,000.00 -77,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 1,530. 10.00 15,300.00 10.00 15,300.00 504.101 COMMON BRIDGE EXCAVATION CY 10,656. 7.00 74,592.00 10.00 106,560.00 -31,968.00 504.25 ROCK BRIDGE EXCAVATION, MECHANICAL METHODS CY 130. 130.00 16,900.00 80.00 10,400.00 6,500.00 506.4 STEEL SHEETING FOR ENVIRONMENTAL PROTECTION SY 1,800. 43.85 78,930.00 80.00 144,000.00 -65,070.00 508. STRUCTURAL FILL CY 809. 19.25 15,573.25 30.00 24,270.00 -8,696.75 510.101 PILE DRIVING EQUIPMENT U 1. 51,600.00 51,600.00 50,000.00 50,000.00 1,600.00 510.102 PILE DRIVING EQUIPMENT U 1. 15,500.00 15,500.00 55,000.00 55,000.00 -39,500.00 510.6101 FURNISHING & DRIVING STEEL BEARING PILES LB 133,560. .55 73,458.00 .60 80,136.00 -6,678.00 510.6102 FURNISHING & DRIVING STEEL BEARING PILES LB 28,250. .55 15,537.50 .60 16,950.00 -1,412.50 510.6501 DRIVING POINTS FOR STEEL BEARING PILES EA 56. 206.00 11,536.00 200.00 11,200.00 336.00 510.6502 DRIVING-POINTS FOR STEEL BEARING PILES EA 16. 206.00 3,296.00 125.00 2,000.00 1,296.00 510.9 PILE SPLICES EA 13. 1.05 13.65 325.00 4,225.00 -4,211.35 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 53. 258.00 13,674.00 350.00 18,550.00 -4,876.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 4. 516.00 2,064.00 400.00 1,600.00 464.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 2. 619.00 1,238.00 600.00 1,200.00 38.00 520.01 CONCRETE CLASS AA CY 16. 413.00 6,608.00 1,200.00 19,200.00 -12,592.00 520.0302 CONCRETE CLASS AA APPROAC SLABS (QC/QA) (F) CY 214. 258.00 55,212.00 325.00 69,550.00 -14,338.00 520.1 CONCRETE CLASS A CY 152. 155.00 23,560.00 700.00 106,400.00 -82,840.00 11238M PAGE 5 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 520.121 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 519. 516.00 267,804.00 650.00 337,350.00 -69,546.00 520.122 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 730. 671.00 489,830.00 850.00 620,500.00 -130,670.00 520.2 CONCRETE CLASS B CY 420. 285.00 119,700.00 300.00 126,000.00 -6,300.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 600. 258.00 154,800.00 400.00 240,000.00 -85,200.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 345. 130.00 44,850.00 134.00 46,230.00 -1,380.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 804. 774.00 622,296.00 850.00 683,400.00 -61,104.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 180. 77.40 13,932.00 70.00 12,600.00 1,332.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 186. 51.60 9,597.60 40.00 7,440.00 2,157.60 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 2,943. 18.50 54,445.50 25.00 73,575.00 -19,129.50 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 165. 5.15 849.75 8.00 1,320.00 -470.25 541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 40. 5.15 206.00 8.00 320.00 -114.00 541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 72. 5.15 370.80 8.00 576.00 -205.20 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 140. 10.30 1,442.00 8.00 1,120.00 322.00 541.5 PVC WATERSTOPS, NH TYPE 5 (F) LF 85. 10.30 875.50 8.00 680.00 195.50 544.1 REINFORCING STEEL (ROADWAY) LB 50,850. 1.00 50,850.00 2.00 101,700.00 -50,850.00 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 73,340. 1.15 84,341.00 1.25 91,675.00 -7,334.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 415,500. 1.05 436,275.00 1.10 457,050.00 -20,775.00 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 1,498. 7.75 11,609.50 7.50 11,235.00 374.50 547.1 SHEAR CONNECTORS (F) EA 7,332. 5.15 37,759.80 4.00 29,328.00 8,431.80 550.1 STRUCTURAL STEEL (F) LB 994,207. 1.75 1,739,862.25 1.70 1,690,151.90 49,710.35 550.210 BRIDGE SHOES - HLMR (F) EA 27. 3,610.00 97,470.00 4,000.00 108,000.00 -10,530.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) (F) LF 85. 109.00 9,265.00 100.00 8,500.00 765.00 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LF 101. 1,290.00 130,290.00 1,500.00 151,500.00 -21,210.00 562.1 SILICONE JOINT SEALANT (F LF 910. 10.30 9,373.00 20.00 18,200.00 -8,827.00 563.22 BRIDGE RAIL T2 (F) LF 91. 104.00 9,464.00 120.00 10,920.00 -1,456.00 563.221 BRIDGE RAIL T2 WITH PROTECTIVE SCREENING (F) LF 269. 158.00 42,502.00 150.00 40,350.00 2,152.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LF 48. 144.00 6,912.00 140.00 6,720.00 192.00 11238M PAGE 6 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 563.241 BRIDGE RAIL T4 WITH PROTECTIVE SCREENING (F) LF 261. 221.00 57,681.00 185.00 48,285.00 9,396.00 563.973 SNOW SCREENING FOR OVERPASS STRUCTURES RAIL F LF 124. 42.40 5,257.60 45.00 5,580.00 -322.40 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) U 4. 4,360.00 17,440.00 4,000.00 16,000.00 1,440.00 565.242 BRIDGE APPROACH RAIL T4 (STEEL POSTS) U 2. 5,720.00 11,440.00 6,000.00 12,000.00 -560.00 570.92 RECONSTRUCT MASONRY WALL CY 27. 850.00 22,950.00 500.00 13,500.00 9,450.00 572.2 RECONSTRUCTING STONE WALL MULTIPLE STONES WIDE LF 45. 450.00 20,250.00 150.00 6,750.00 13,500.00 582.1 SLOPE PAVING WITH CONCRETE (F) SY 622. 48.00 29,856.00 40.00 24,880.00 4,976.00 585.2 STONE FILL, CLASS B CY 140. 35.00 4,900.00 30.00 4,200.00 700.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 110. 50.00 5,500.00 40.00 4,400.00 1,100.00 585.25 COBBLE-GRAVEL-SAND CY 2,200. 25.00 55,000.00 45.00 99,000.00 -44,000.00 585.3 STONE FILL, CLASS C CY 3,500. 25.00 87,500.00 32.00 112,000.00 -24,500.00 587.1 KEYED STONE FILL CY 200. 35.00 7,000.00 40.00 8,000.00 -1,000.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 9,632. 34.00 327,488.00 40.00 385,280.00 -57,792.00 593.211 GEOTEXTILE; SEPARATION CL.1, NON-WOVEN SY 954. 3.00 2,862.00 2.00 1,908.00 954.00 593.323 GEOTEXTILE; STABILIZATION CL.2, SLIT FIL.,WOVEN SY 18,900. 1.75 33,075.00 2.00 37,800.00 -4,725.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 175. 3.00 525.00 3.00 525.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 7,100. 2.00 14,200.00 2.50 17,750.00 -3,550.00 603.0001 VIDEO INSPECTION LF 32,250. .88 28,380.00 1.00 32,250.00 -3,870.00 603.00215 15" R.C. PIPE, 2000D LF 2,550. 30.00 76,500.00 32.00 81,600.00 -5,100.00 603.00218 18" R.C. PIPE, 2000D LF 840. 34.00 28,560.00 38.00 31,920.00 -3,360.00 603.00224 24" R.C. PIPE, 2000D LF 1,750. 43.00 75,250.00 44.00 77,000.00 -1,750.00 603.00230 30" R.C. PIPE, 2000D LF 360. 55.00 19,800.00 60.00 21,600.00 -1,800.00 603.00242 42" R.C. PIPE, 2000D LF 160. 80.00 12,800.00 110.00 17,600.00 -4,800.00 603.00248 48" R.C. PIPE, 2000D LF 425. 115.00 48,875.00 120.00 51,000.00 -2,125.00 603.00260 60" R.C. PIPE, 2000D LF 305. 253.00 77,165.00 190.00 57,950.00 19,215.00 603.00315 15" R.C. PIPE, 3000D LF 45. 35.00 1,575.00 40.00 1,800.00 -225.00 603.00430 30" R.C. PIPE, 3750D LF 220. 40.00 8,800.00 70.00 15,400.00 -6,600.00 603.11008 8" CORR. STEEL PIPE, .064 LF 17. 40.00 680.00 40.00 680.00 603.11012 12" CORR. STEEL PIPE, .064" LF 19. 50.00 950.00 45.00 855.00 95.00 603.33115 15" CORR. POLYETHYLENE END SECTION EA 4. 175.00 700.00 550.00 2,200.00 -1,500.00 603.33118 18" CORR. POLYETHYLENE END SECTION EA 4. 250.00 1,000.00 600.00 2,400.00 -1,400.00 603.33124 24" CORR. POLYETHYLENE END SECTION EA 1. 300.00 300.00 750.00 750.00 -450.00 603.33130 30" CORR. POLYETHYLENE END SECTION EA 3. 500.00 1,500.00 875.00 2,625.00 -1,125.00 11238M PAGE 7 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 603.36112 12" ALUMINIZED STEEL END SECTION EA 6. 150.00 900.00 180.00 1,080.00 -180.00 603.36118 18" ALUMINIZED STEEL END SECTION EA 1. 250.00 250.00 200.00 200.00 50.00 603.36130 30" ALUMINIZED STEEL END SECTION EA 2. 550.00 1,100.00 450.00 900.00 200.00 603.391 RESETTING CONCRETE END SECTIONS EA 2. 250.00 500.00 375.00 750.00 -250.00 603.44015 15" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 57. 25.00 1,425.00 32.00 1,824.00 -399.00 603.491 24" CMP REPAIR SLEEVE EA 3. 1,000.00 3,000.00 500.00 1,500.00 1,500.00 603.50012 12" PIPE FOR DRIVES & MINOR APPROACHES LF 130. 25.00 3,250.00 25.00 3,250.00 603.60015 LAYING/RELAYING 15" DRAINAGE PIPE LF 25. 30.00 750.00 60.00 1,500.00 -750.00 603.60024 LAYING/RELAYING 24" DRAINAGE PIPE LF 60. 30.00 1,800.00 60.00 3,600.00 -1,800.00 603.82118 18" PE PIPE (TYPE C) LF 47. 30.00 1,410.00 30.00 1,410.00 603.82124 24" PE PIPE (TYPE C) LF 68. 38.00 2,584.00 40.00 2,720.00 -136.00 603.82215 15" PE PIPE (TYPE S) LF 22,050. 27.30 601,965.00 32.00 705,600.00 -103,635.00 603.82218 18" PE PIPE (TYPE S) LF 4,500. 32.15 144,675.00 35.00 157,500.00 -12,825.00 603.82224 24" PE PIPE (TYPE S) LF 4,200. 39.55 166,110.00 50.00 210,000.00 -43,890.00 603.82230 30" PE PIPE (TYPE S) LF 970. 52.80 51,216.00 65.00 63,050.00 -11,834.00 604.0007 POLYETHYLENE LINER EA 220. 200.00 44,000.00 170.00 37,400.00 6,600.00 604.114 CATCH BASINS TYPE A, 4-FOOT DIAMETER U 84. 1,750.00 147,000.00 2,000.00 168,000.00 -21,000.00 604.115 CATCH BASINS TYPE A, 5-FOOT DIAMETER U 21. 2,500.00 52,500.00 2,500.00 52,500.00 604.1152 CATCH BASIN TYPE A, DOUBLE GRATE, 5' DIA U 7. 2,900.00 20,300.00 2,800.00 19,600.00 700.00 604.11525 CATCH BASINS TYPE A, DOUBLE GRATE 5' DIA 5% CROSS SLOPE U 1. 2,800.00 2,800.00 2,800.00 2,800.00 604.116 CATCH BASINS TYPE A, 6-FOOT DIAMETER U 6. 3,100.00 18,600.00 3,000.00 18,000.00 600.00 604.118 CATCH BASIN TYPE A, 8-FOOT DIAMETER U 2. 5,000.00 10,000.00 6,000.00 12,000.00 -2,000.00 604.12 CATCH BASINS TYPE B U 60. 1,750.00 105,000.00 1,800.00 108,000.00 -3,000.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 3. 2,600.00 7,800.00 2,200.00 6,600.00 1,200.00 604.1252 CATCH BASIN TYPE B, 5' DIA., DOUBLE GRATE U 3. 2,850.00 8,550.00 2,800.00 8,400.00 150.00 604.126 CATCH BASINS TYPE B, 6-FOOT DIAMETER U 2. 2,500.00 5,000.00 3,000.00 6,000.00 -1,000.00 604.15 CATCH BASINS TYPE E U 55. 1,900.00 104,500.00 2,100.00 115,500.00 -11,000.00 604.155 CATCH BASINS TYPE E, 5-FOOT DIAMETER U 22. 2,600.00 57,200.00 2,600.00 57,200.00 604.156 CATCH BASINS TYPE E, 6-FOOT DIAMETER U 2. 3,000.00 6,000.00 3,300.00 6,600.00 -600.00 604.158 CATCH BASINS TYPE E, 8-FOOT DIAMETER U 2. 5,200.00 10,400.00 4,800.00 9,600.00 800.00 604.16 CATCH BASINS TYPE F U 40. 2,000.00 80,000.00 2,100.00 84,000.00 -4,000.00 11238M PAGE 8 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 604.165 CATCH BASINS TYPE F, 5-FOOT DIAMETER U 5. 3,000.00 15,000.00 2,500.00 12,500.00 2,500.00 604.1652 CATCH BASINS TYPE F, 5' DIA., DOUBLE GRATE U 6. 3,300.00 19,800.00 3,000.00 18,000.00 1,800.00 604.241 DROP INLETS TYPE D-A U 5. 1,100.00 5,500.00 1,200.00 6,000.00 -500.00 604.245 DROP INLETS TYPE D-E U 9. 1,300.00 11,700.00 1,200.00 10,800.00 900.00 604.25 DROP INLETS TYPE E U 6. 1,500.00 9,000.00 1,200.00 7,200.00 1,800.00 604.258 DROP INLETS TYPE E, 8-FOOT DIAMETER U 2. 3,000.00 6,000.00 4,800.00 9,600.00 -3,600.00 604.32 DRAINAGE MANHOLES U 19. 2,100.00 39,900.00 1,800.00 34,200.00 5,700.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 7. 2,800.00 19,600.00 2,550.00 17,850.00 1,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 21. 350.00 7,350.00 400.00 8,400.00 -1,050.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 24. 350.00 8,400.00 365.00 8,760.00 -360.00 604.62 DRAINAGE MANHOLE COVERS AND FRAMES EA 1. 500.00 500.00 400.00 400.00 100.00 604.9101 OUTLET CONTROL STRUCTURE U 1. 2,440.00 2,440.00 5,000.00 5,000.00 -2,560.00 604.9102 OUTLET CONTROL STRUCTURE U 2. 2,630.00 5,260.00 5,000.00 10,000.00 -4,740.00 604.9103 OUTLET CONTROL STRUCTURE U 2. 2,630.00 5,260.00 5,000.00 10,000.00 -4,740.00 604.9104 OUTLET CONTROL STRUCTURE U 2. 2,600.00 5,200.00 5,000.00 10,000.00 -4,800.00 604.9105 OUTLET CONTROL STRUCTURE U 2. 2,580.00 5,160.00 5,000.00 10,000.00 -4,840.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 19,500. 13.00 253,500.00 15.00 292,500.00 -39,000.00 605.508 8" PERF. CORR. POLYETHYL PIPE UND. LF 6,300. 16.00 100,800.00 17.00 107,100.00 -6,300.00 605.79 UNDERDRAIN FLUSHING BASINS EA 57. 310.00 17,670.00 375.00 21,375.00 -3,705.00 605.82251 24" AGGRE. UND. TYPE 2 WITH 6" P.C. POLY PIPE LF 3,500. 25.00 87,500.00 22.00 77,000.00 10,500.00 605.82258 24" AGGRE. UND. TYPE 2 WITH 8" P.C. POLY PIPE LF 2,950. 28.00 82,600.00 24.00 70,800.00 11,800.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,700. 17.10 148,770.00 17.00 147,900.00 870.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) (STEEL POST) LF 190. 23.65 4,493.50 22.00 4,180.00 313.50 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 3. 1,970.00 5,910.00 1,800.00 5,400.00 510.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 20. 1,730.00 34,600.00 1,500.00 30,000.00 4,600.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 12. 493.00 5,916.00 550.00 6,600.00 -684.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 110. 19.70 2,167.00 23.00 2,530.00 -363.00 606.2120 DOUBLE-FACED BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,200. 24.65 29,580.00 25.00 30,000.00 -420.00 606.21203 DOUBLE-FACED BEAM GUARDRAIL (GALVANIZED), THRIE BEAM (STEEL POST) LF 850. 37.00 31,450.00 35.00 29,750.00 1,700.00 11238M PAGE 9 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 5. 2,900.00 14,500.00 4,000.00 20,000.00 -5,500.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 1. 4,140.00 4,140.00 4,750.00 4,750.00 -610.00 606.3221 DOUBLE FACED TRANSITION RAIL, STEEL POST (F-SHAPE BARRIER) U 1. 4,140.00 4,140.00 4,500.00 4,500.00 -360.00 606.41211 TRANSITION MEDIAN CONCRET BARRIER, PRECAST U 1. 2,300.00 2,300.00 2,000.00 2,000.00 300.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 5. 6,500.00 32,500.00 2,300.00 11,500.00 21,000.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 7,400. 75.00 555,000.00 65.00 481,000.00 74,000.00 606.4133 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST (10' SECTION) LF 340. 88.00 29,920.00 65.00 22,100.00 7,820.00 606.4139 SINGLE SLOPE CONCRETE BARRIER, PRECAST (MODIFIED)(54") LF 660. 88.00 58,080.00 90.00 59,400.00 -1,320.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 22,600. 12.00 271,200.00 20.00 452,000.00 -180,800.00 606.4171 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL - LEFT IN PLACE LF 140. 40.00 5,600.00 30.00 4,200.00 1,400.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 2. 1,350.00 2,700.00 1,300.00 2,600.00 100.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 8. 3,950.00 31,600.00 3,000.00 24,000.00 7,600.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 9. 5,950.00 53,550.00 4,000.00 36,000.00 17,550.00 607.146 WOVEN WIRE FENCE 4'-6" HIGH LF 1,925. 6.00 11,550.00 15.00 28,875.00 -17,325.00 607.360 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC, 6' HIGH LF 13,160. 19.25 253,330.00 17.00 223,720.00 29,610.00 607.4146 POST ASSEMBLIES FOR WOVEN WIRE FENCE, 4'-6" HIGH EA 11. 150.00 1,650.00 200.00 2,200.00 -550.00 607.4360 POST ASSEMBLIES FOR CHAIN LINK FENCE WITH VINYL CTD STL FABRIC, 6' HIGH EA 73. 225.00 16,425.00 150.00 10,950.00 5,475.00 607.73518 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 5' HIGH U 2. 1,900.00 3,800.00 1,700.00 3,400.00 400.00 607.73618 18' OPENING DOUBLE GATE, CHAIN LINK VINYL COATED STEEL FABRIC, 6' HIGH U 1. 1,900.00 1,900.00 1,900.00 1,900.00 607.78618 18' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 3. 2,500.00 7,500.00 2,200.00 6,600.00 900.00 607.78624 24' OPENING CHAIN LINK DOUBLE GATES/VINYL-CTD STL FAB & BARB WI, 6' HI U 1. 3,000.00 3,000.00 2,700.00 2,700.00 300.00 11238M PAGE 10 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 607.860 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC & BARBED WIRE, 6' LF 3,160. 30.00 94,800.00 19.00 60,040.00 34,760.00 607.9804 RESETTING IRON GATE, 4' HIGH LF 14. 40.00 560.00 50.00 700.00 -140.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 4,800. 14.00 67,200.00 13.00 62,400.00 4,800.00 608.24 4" CONCRETE SIDEWALK (F) SY 240. 34.00 8,160.00 37.00 8,880.00 -720.00 608.26 6" CONCRETE SIDEWALK (F) SY 1,640. 37.00 60,680.00 40.00 65,600.00 -4,920.00 608.28 8" CONCRETE SIDEWALK (F) SY 470. 40.00 18,800.00 46.00 21,620.00 -2,820.00 608.38 8" REINFORCED CONCRETE SIDEWALK (F) SY 605. 43.00 26,015.00 80.00 48,400.00 -22,385.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 63. 375.00 23,625.00 600.00 37,800.00 -14,175.00 609.01 STRAIGHT GRANITE CURB LF 6,790. 16.50 112,035.00 16.00 108,640.00 3,395.00 609.01123 STRAIGHT GRANITE CURB 12" HIGH, WITH 3"X3" MOUNTABLE BEVELED EDGE LF 340. 23.50 7,990.00 40.00 13,600.00 -5,610.00 609.02 CURVED GRANITE CURB LF 230. 26.00 5,980.00 27.00 6,210.00 -230.00 609.21 STRAIGHT GRANITE SLOPE CURB LF 13,280. 11.95 158,696.00 11.00 146,080.00 12,616.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 5,540. 14.20 78,668.00 13.00 72,020.00 6,648.00 609.22 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS LF 63. 11.95 752.85 12.00 756.00 -3.15 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 80. 14.20 1,136.00 14.00 1,120.00 16.00 609.23 CURVED GRANITE SLOPE CURB LF 25. 64.50 1,612.50 60.00 1,500.00 112.50 609.236 CURVED GRANITE SLOPE CURB 6" HIGH LF 2. 65.00 130.00 70.00 140.00 -10.00 609.5 RESET GRANITE CURB LF 1,550. 4.95 7,672.50 5.00 7,750.00 -77.50 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 1,080. 3.50 3,780.00 4.50 4,860.00 -1,080.00 609.930 SPECIAL GRANITE CURB (REVEAL 12" TO 18") LF 55. 75.00 4,125.00 100.00 5,500.00 -1,375.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 90. 50.00 4,500.00 40.00 3,600.00 900.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 2,600. 71.35 185,510.00 60.00 156,000.00 29,510.00 611.05216 16" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 240. 98.05 23,532.00 120.00 28,800.00 -5,268.00 611.05220 20" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,500. 135.00 202,500.00 140.00 210,000.00 -7,500.00 611.05412 12" EXTRA HEAVY DUTY DUCTILE IRON WATER PIPE, CL. 54 LF 170. 93.30 15,861.00 80.00 13,600.00 2,261.00 611.35136 36" DIRECT BURY CASING PIPE WITH 16" DIAMETER CL 52 CARRIER PIPE LF 200. 278.00 55,600.00 400.00 80,000.00 -24,400.00 611.36024 DIRECT BURY CASING PIPE LF 190. 113.00 21,470.00 160.00 30,400.00 -8,930.00 11238M PAGE 11 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 611.70008 8" FITTING EA 6. 400.00 2,400.00 370.00 2,220.00 180.00 611.70010 10" FITTING EA 2. 500.00 1,000.00 435.00 870.00 130.00 611.70012 12" FITTING EA 23. 650.00 14,950.00 450.00 10,350.00 4,600.00 611.70016 16 " FITTING EA 4. 800.00 3,200.00 780.00 3,120.00 80.00 611.70020 20" FITTING EA 7. 1,750.00 12,250.00 1,200.00 8,400.00 3,850.00 611.71006 6" GATE VALVE EA 4. 1,170.00 4,680.00 580.00 2,320.00 2,360.00 611.71008 8" GATE VALVE EA 2. 1,510.00 3,020.00 1,000.00 2,000.00 1,020.00 611.71012 12" GATE VALVE EA 1. 2,320.00 2,320.00 1,700.00 1,700.00 620.00 611.71016 16" GATE VALVE EA 1. 5,660.00 5,660.00 2,550.00 2,550.00 3,110.00 611.71020 20" GATE VALVE EA 3. 12,600.00 37,800.00 5,000.00 15,000.00 22,800.00 611.81 HYDRANTS EA 4. 4,500.00 18,000.00 2,700.00 10,800.00 7,200.00 611.84 MANUAL AIR RELEASE EA 1. 1,500.00 1,500.00 400.00 400.00 1,100.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 350.00 5,250.00 150.00 2,250.00 3,000.00 611.951 WATER MAIN INSULATION SY 330. 9.00 2,970.00 20.00 6,600.00 -3,630.00 612.3104 4-FOOT DIAMETER SEWER MANHOLE VF 21. 275.00 5,775.00 277.00 5,817.00 -42.00 612.313 MODIFY EXISTING MANHOLE (REBUILD INVERT) EA 1. 500.00 500.00 700.00 700.00 -200.00 612.33 INSTALL DROP CONNECTION VF 4. 100.00 400.00 300.00 1,200.00 -800.00 612.3508 8" PVC SEWER PIPE LF 122. 60.00 7,320.00 77.00 9,394.00 -2,074.00 612.35124 8" PVC SEWER PIPE WITH 24" STEEL CASING LF 440. 134.00 58,960.00 206.00 90,640.00 -31,680.00 612.951 SEWER MAIN INSULATION SY 30. 9.00 270.00 13.00 390.00 -120.00 614.321 2" STEEL CONDUIT LF 200. 9.00 1,800.00 13.00 2,600.00 -800.00 614.331 3" STEEL CONDUIT LF 810. 16.00 12,960.00 18.00 14,580.00 -1,620.00 614.3439 4 INCH 3-DUCT STEEL CONDUIT (BRIDGE) LF 345. 85.00 29,325.00 110.00 37,950.00 -8,625.00 614.511 CONCRETE PULL BOX 14" EA 9. 285.00 2,565.00 300.00 2,700.00 -135.00 614.512 CONCRETE PULL BOX 18" EA 6. 325.00 1,950.00 500.00 3,000.00 -1,050.00 614.51821 CONCRETE FIBER OPTIC SPLICE VAULT 48"X48"X48" U 8. 3,600.00 28,800.00 3,000.00 24,000.00 4,800.00 614.51823 CONCRETE FIBER OPTIC SPLICE VAULT 48"X96"X48" U 4. 5,000.00 20,000.00 5,000.00 20,000.00 614.5183 30" CONCRETE FIBER OPTIC MANHOLE EA 2. 1,800.00 3,600.00 750.00 1,500.00 2,100.00 614.523 MOLDED PULL BOX 17"X30" EA 56. 300.00 16,800.00 450.00 25,200.00 -8,400.00 614.72114 2" PVC CONDUIT, SCHEDULE 40 LF 515. 5.00 2,575.00 7.00 3,605.00 -1,030.00 614.72118 2" PVC CONDUIT, SCHEDULE 80 LF 58. 9.00 522.00 8.00 464.00 58.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 4,850. 6.25 30,312.50 7.00 33,950.00 -3,637.50 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 1,750. 11.00 19,250.00 15.00 26,250.00 -7,000.00 614.73214 3" 2-DUCT PVC CONDUIT, SCHEDULE 40 LF 7. 7.00 49.00 15.00 105.00 -56.00 614.73218 3" 2-DUCT PVC CONDUIT, SCHEDULE 80 LF 90. 13.00 1,170.00 25.00 2,250.00 -1,080.00 614.74221 4" 2-DUCT HDPE CONDUIT, SDR 13.5 LF 13,850. 17.00 235,450.00 20.00 277,000.00 -41,550.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 714. 50.00 35,700.00 80.00 57,120.00 -21,420.00 11238M PAGE 12 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 615.013 REMOVING TRAFFIC SIGN TYPE A U 16. 400.00 6,400.00 550.00 8,800.00 -2,400.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 7. 4,500.00 31,500.00 3,280.00 22,960.00 8,540.00 615.02 TRAFFIC SIGN TYPE B (F) SF 292.3 53.00 15,491.90 65.00 18,999.50 -3,507.60 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 775.75 90.00 69,817.50 75.00 58,181.25 11,636.25 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 10. 1,200.00 12,000.00 750.00 7,500.00 4,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 868. 45.00 39,060.00 45.00 39,060.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 3. 100.00 300.00 150.00 450.00 -150.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 1,936. 17.00 32,912.00 20.00 38,720.00 -5,808.00 615.043 REMOVING TRAFFIC SIGN TYPE AA U 9. 250.00 2,250.00 50.00 450.00 1,800.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 64. 12.00 768.00 15.00 960.00 -192.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 91. 10.00 910.00 12.00 1,092.00 -182.00 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 141,000.00 141,000.00 220,000.00 220,000.00 -79,000.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 153,000.00 153,000.00 190,000.00 190,000.00 -37,000.00 615.10003 FULL TRAFFIC SIGN STRUCTURE U 1. 192,000.00 192,000.00 217,000.00 217,000.00 -25,000.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 29,700.00 29,700.00 60,000.00 60,000.00 -30,300.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 36,100.00 36,100.00 60,000.00 60,000.00 -23,900.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 3,500.00 3,500.00 -920.00 615.20302 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 3,500.00 3,500.00 -920.00 615.20303 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,580.00 2,580.00 3,500.00 3,500.00 -920.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,770.00 8,770.00 11,250.00 11,250.00 -2,480.00 616.101 TRAFFIC SIGNALS U 1. 88,000.00 88,000.00 111,000.00 111,000.00 -23,000.00 616.141 COMPUTER EQUIPMENT AND TRAFFIC SIGNAL SOFTWARE U 1. 3,000.00 3,000.00 20,000.00 20,000.00 -17,000.00 616.151 TRAFFIC SIGNAL (FIBER OPTIC) U 1. 22,000.00 22,000.00 21,000.00 21,000.00 1,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 15,800.00 15,800.00 9,500.00 9,500.00 6,300.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 14,800.00 14,800.00 8,000.00 8,000.00 6,800.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 23,100.00 23,100.00 24,000.00 24,000.00 -900.00 616.164 TRAFFIC SIGNALS (TEMP.) U 1. 10,700.00 10,700.00 4,500.00 4,500.00 6,200.00 616.165 TRAFFIC SIGNALS (TEMP.) U 1. 10,700.00 10,700.00 4,500.00 4,500.00 6,200.00 616.166 TRAFFIC SIGNALS (TEMP.) U 1. 11,000.00 11,000.00 4,500.00 4,500.00 6,500.00 616.167 TRAFFIC SIGNALS (TEMP.) U 1. 18,200.00 18,200.00 47,300.00 47,300.00 -29,100.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 19,000.00 19,000.00 28,500.00 28,500.00 -9,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 583,000.00 583,000.00 583,000.00 583,000.00 618.7 FLAGGERS HR 4,000. 26.00 104,000.00 20.00 80,000.00 24,000.00 11238M PAGE 13 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 619.1 MAINTENANCE OF TRAFFIC U 1. 360,000.00 360,000.00 500,000.00 500,000.00 -140,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 11. 16,500.00 181,500.00 12,000.00 132,000.00 49,500.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 3. 3,500.00 10,500.00 3,000.00 9,000.00 1,500.00 619.501 SMART WORK ZONE DEVELOPMENT U 1. 25,000.00 25,000.00 127,500.00 127,500.00 -102,500.00 619.502 SMART WORK ZONE OPERATIONAL COSTS MON 16. 1,800.00 28,800.00 3,000.00 48,000.00 -19,200.00 619.503 SMART WORK ZONE OPERATIONAL COSTS (SUMMER) MON 35. 850.00 29,750.00 2,000.00 70,000.00 -40,250.00 619.51 PORTABLE QUEUE TRAILER/ SENSOR (PQT) MON 612. 600.00 367,200.00 600.00 367,200.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 153. 925.00 141,525.00 750.00 114,750.00 26,775.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 2. 16,000.00 32,000.00 12,000.00 24,000.00 8,000.00 619.91 RELOCATE SMART WORK ZONE DEVICE U 25. 200.00 5,000.00 750.00 18,750.00 -13,750.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 90. 14.80 1,332.00 15.00 1,350.00 -18.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 165. 3.95 651.75 4.50 742.50 -90.75 621.31 SINGLE DELINEATOR WITH POST EA 140. 29.60 4,144.00 33.00 4,620.00 -476.00 621.32 DOUBLE DELINEATOR WITH POST EA 22. 31.55 694.10 36.00 792.00 -97.90 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 10. 31.55 315.50 34.00 340.00 -24.50 621.61 FIBER OPTIC DELINEATOR EA 27. 100.00 2,700.00 150.00 4,050.00 -1,350.00 621.71 FLEXIBLE DELINEATORS, SOIL MOUNT EA 200. 35.00 7,000.00 40.00 8,000.00 -1,000.00 621.73 FLEXIBLE DELINEATORS, (TEMPORARY) EA 18. 35.00 630.00 40.00 720.00 -90.00 622.1 STEEL WITNESS MARKERS EA 185. 27.60 5,106.00 25.00 4,625.00 481.00 622.2 CONCRETE BOUNDS EA 44. 325.00 14,300.00 275.00 12,100.00 2,200.00 622.4 STONE BOUNDS EA 22. 286.00 6,292.00 250.00 5,500.00 792.00 625.2 CONCRETE LIGHT POLE BASES, TYPE B EA 16. 700.00 11,200.00 700.00 11,200.00 625.52 LIGHT POLE U 5. 2,300.00 11,500.00 2,100.00 10,500.00 1,000.00 625.62 RESET/RELOCATE LIGHT POLES EA 11. 600.00 6,600.00 2,100.00 23,100.00 -16,500.00 628.2 SAWED BITUMINOUS PAVEMENT LF 6,500. 1.00 6,500.00 1.50 9,750.00 -3,250.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 145,100. .10 14,510.00 .10 14,510.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 514,800. .11 56,628.00 .12 61,776.00 -5,148.00 632.0108 RETROREFLECTIVE PAINT PAVE. MARKING, 8" LINE LF 490. .75 367.50 .35 171.50 196.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 21,850. .20 4,370.00 .40 8,740.00 -4,370.00 11238M PAGE 14 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 490. 2.00 980.00 1.00 490.00 490.00 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 165. 4.00 660.00 1.50 247.50 412.50 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 3,250. .50 1,625.00 .50 1,625.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 4,100. .60 2,460.00 .70 2,870.00 -410.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 2,650. .80 2,120.00 .90 2,385.00 -265.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 14,250. 1.35 19,237.50 1.79 25,507.50 -6,270.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 785. 4.00 3,140.00 2.75 2,158.75 981.25 632.3124 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 24" LINE LF 235. 6.00 1,410.00 3.75 881.25 528.75 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 3,050. 6.00 18,300.00 5.00 15,250.00 3,050.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 80,500. .30 24,150.00 .35 28,175.00 -4,025.00 641. LOAM CY 1,860. 14.85 27,621.00 20.00 37,200.00 -9,579.00 643.22 FERTILIZER FOR REFERTILIZATION TON 32. 660.00 21,120.00 900.00 28,800.00 -7,680.00 644.22 SHRUB/FOREST WETLAND SEED MIX LB 65. 185.00 12,025.00 100.00 6,500.00 5,525.00 644.741 UPLAND SEED MIX LB 5. 25.00 125.00 50.00 250.00 -125.00 645.0001 TURBIDITY BARRIER LF 755. 16.00 12,080.00 25.00 18,875.00 -6,795.00 645.11 MULCH A 6. 825.00 4,950.00 1,200.00 7,200.00 -2,250.00 645.113 HYDRAULIC MULCH LB 75,000. .75 56,250.00 .60 45,000.00 11,250.00 645.119 MULCH WITH TACKIFIERS A 35. 1,050.00 36,750.00 1,100.00 38,500.00 -1,750.00 645.2535 COIR FIBER MATTING FOR EROSION CONTROL SY 5,000. 4.10 20,500.00 25.00 125,000.00 -104,500.00 645.254 COIR FIBER ROLLS LF 1,750. 2.60 4,550.00 7.00 12,250.00 -7,700.00 645.3 EROSION STONE TON 18,050. 15.00 270,750.00 20.00 361,000.00 -90,250.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 394,800. .50 197,400.00 1.50 592,200.00 -394,800.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 59,550. 2.50 148,875.00 5.00 297,750.00 -148,875.00 645.455 CHANNEL STABILIZATION - ROOTWADS U 9. 500.00 4,500.00 1,700.00 15,300.00 -10,800.00 645.48 EROSION CONTROL MIX CY 5,650. 18.00 101,700.00 20.00 113,000.00 -11,300.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 1,600. 8.00 12,800.00 20.00 32,000.00 -19,200.00 645.482 STUMP GRINDING FOR TEMPORARY EROSION CONTROL CY 8,500. 8.00 68,000.00 10.00 85,000.00 -17,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 200. 7.00 1,400.00 10.00 2,000.00 -600.00 645.512 COMPOST SOCK FOR PERIMETER BERM LF 46,700. 3.50 163,450.00 5.00 233,500.00 -70,050.00 11238M PAGE 15 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 645.52 RYEGRASS FOR TEMPORARY EROSION CONTROL LB 3,200. .75 2,400.00 3.00 9,600.00 -7,200.00 645.531 SILT FENCE LF 54,600. 1.25 68,250.00 3.00 163,800.00 -95,550.00 645.611 BONDED FIBER MATRIX (BFM) LB 70,100. 1.05 73,605.00 2.00 140,200.00 -66,595.00 645.612 FIBER REINFORCED MATRIX (FRM) LB 13,200. 2.60 34,320.00 2.20 29,040.00 5,280.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 29,100.00 29,100.00 21,000.00 21,000.00 8,100.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 2,850. 48.00 136,800.00 60.00 171,000.00 -34,200.00 645.81 STORMWATER REMOVAL - TRUCKING HR 400. 85.00 34,000.00 20.00 8,000.00 26,000.00 645.8103 EROSION CONTROL PUMP (300 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,200.00 120,000.00 300.00 30,000.00 90,000.00 645.8105 EROSION CONTROL PUMP (500 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,200.00 120,000.00 500.00 50,000.00 70,000.00 645.8110 EROSION CONTROL PUMP (1000 GAL/MIN. DISCHARGE CAPACITY) UWK 100. 1,600.00 160,000.00 800.00 80,000.00 80,000.00 645.8203 EROSION CONTROL PUMP (300 GAL/MIN DISCHARGE CAPACITY) U 1. 5,000.00 5,000.00 10,000.00 10,000.00 -5,000.00 645.8205 EROSION CONTROL PUMP (500 GAL/MIN DISCHARGE CAPACITY) U 1. 7,500.00 7,500.00 11,000.00 11,000.00 -3,500.00 645.8210 EROSION CONTROL PUMP (1000 GAL/MIN DISCHARGE CAPACITY) U 6. 15,000.00 90,000.00 12,000.00 72,000.00 18,000.00 645.85 FLOCCULANT TREATMENT SYSTEM (FTS) MON 38. 6,850.00 260,300.00 5,300.00 201,400.00 58,900.00 645.851 WATER QUALITY MONITORING FOR CONSTRUCTION STORMWATER HR 730. 45.35 33,105.50 60.00 43,800.00 -10,694.50 646.2 TURF ESTABLISHMENT WITHOUT MULCH A 73. 4,730.00 345,290.00 1,600.00 116,800.00 228,490.00 647.1 HUMUS CY 28,900. 10.35 299,115.00 16.00 462,400.00 -163,285.00 647.29 WETLAND HUMUS CY 16,050. 17.05 273,652.50 19.00 304,950.00 -31,297.50 650.2 LANDSCAPING U 1. 174,000.00 174,000.00 30,000.00 30,000.00 144,000.00 650.3 LANDSCAPING - WETLAND MITIGATION U 1. 107,000.00 107,000.00 430,000.00 430,000.00 -323,000.00 659.401 LANDSCAPE ESTABLISHMENT CREW (4 MEN- 8 HR DAY) DAY 4. 1,100.00 4,400.00 1,200.00 4,800.00 -400.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 5. 500.00 2,500.00 300.00 1,500.00 1,000.00 670.04501 CONSTRUCT AND REMOVE DIVERSION U 1. 37,300.00 37,300.00 110,000.00 110,000.00 -72,700.00 670.04502 CONSTRUCT AND REMOVE DIVERSION U 1. 22,500.00 22,500.00 30,000.00 30,000.00 -7,500.00 670.04503 CONSTRUCT AND REMOVE DIVERSION U 1. 65,000.00 65,000.00 90,000.00 90,000.00 -25,000.00 11238M PAGE 16 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 670.04504 CONSTRUCT AND REMOVE DIVERSION U 1. 26,500.00 26,500.00 39,000.00 39,000.00 -12,500.00 670.04505 CONSTRUCT AND REMOVE DIVERSION U 1. 7,720.00 7,720.00 9,500.00 9,500.00 -1,780.00 670.04506 CONSTRUCT AND REMOVE DIVERSION U 1. 2,690.00 2,690.00 4,000.00 4,000.00 -1,310.00 670.04507 CONSTRUCT AND REMOVE DIVERSION U 1. 4,280.00 4,280.00 4,000.00 4,000.00 280.00 670.04508 CONSTRUCT AND REMOVE DIVERSION U 1. 30,800.00 30,800.00 30,000.00 30,000.00 800.00 670.04509 CONSTRUCT AND REMOVE DIVERSION U 1. 8,950.00 8,950.00 11,500.00 11,500.00 -2,550.00 670.04510 CONSTRUCT AND REMOVE DIVERSION U 1. 18,500.00 18,500.00 22,000.00 22,000.00 -3,500.00 670.04511 CONSTRUCT AND REMOVE DIVERSION U 1. 23,500.00 23,500.00 33,000.00 33,000.00 -9,500.00 670.04512 CONSTRUCT AND REMOVE DIVERSION U 1. 5,600.00 5,600.00 7,500.00 7,500.00 -1,900.00 670.04513 CONSTRUCT AND REMOVE DIVERSION U 1. 13,800.00 13,800.00 10,000.00 10,000.00 3,800.00 670.04514 CONSTRUCT AND REMOVE DIVERSION U 1. 1,350.00 1,350.00 2,000.00 2,000.00 -650.00 670.04515 CONSTRUCT AND REMOVE DIVERSION U 1. 5,720.00 5,720.00 8,000.00 8,000.00 -2,280.00 670.04516 CONSTRUCT AND REMOVE DIVERSION U 1. 47,800.00 47,800.00 53,000.00 53,000.00 -5,200.00 670.04517 CONSTRUCT AND REMOVE DIVERSION U 1. 6,030.00 6,030.00 2,500.00 2,500.00 3,530.00 670.04518 CONSTRUCT AND REMOVE DIVERSION U 1. 52,700.00 52,700.00 70,000.00 70,000.00 -17,300.00 670.04519 CONSTRUCT AND REMOVE DIVERSION U 1. 544.00 544.00 1,000.00 1,000.00 -456.00 670.04520 CONSTRUCT AND REMOVE DIVERSION U 1. 14,000.00 14,000.00 21,000.00 21,000.00 -7,000.00 670.04521 CONSTRUCT AND REMOVE DIVERSION U 1. 6,520.00 6,520.00 10,000.00 10,000.00 -3,480.00 670.04522 CONSTRUCT AND REMOVE DIVERSION U 1. 6,690.00 6,690.00 11,000.00 11,000.00 -4,310.00 670.04523 CONSTRUCT AND REMOVE DIVERSION U 1. 1,000.00 1,000.00 1,000.00 1,000.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 17,500.00 70,000.00 4,000.00 16,000.00 54,000.00 670.812 CONSTRUCT CONCRETE SIDEWALK U 1. 114,000.00 114,000.00 122,000.00 122,000.00 -8,000.00 670.95 TEMPORARY SAFETY FENCE LF 750. 5.00 3,750.00 5.00 3,750.00 671.603 3" PVC CONDUIT, SCHEDULE 80, DIRECTIONAL BORE LF 70. 100.00 7,000.00 42.00 2,940.00 4,060.00 677.12 PERMANENT FIXED LOCATION DYNAMIC MESSAGE SIGN (DMS) U 1. 86,500.00 86,500.00 175,000.00 175,000.00 -88,500.00 677.4101 CCTV SYSTEM U 1. 55,300.00 55,300.00 80,000.00 80,000.00 -24,700.00 677.4102 CCTV SYSTEM U 1. 55,000.00 55,000.00 80,000.00 80,000.00 -25,000.00 11238M PAGE 17 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 677.42 ROADWAY WEATHER INFORMATION STATION (RWIS) SYSTEM U 1. 68,000.00 68,000.00 120,000.00 120,000.00 -52,000.00 677.421 NON-INVASIVE PAVEMENT SENSOR SYSTEM U 1. 45,000.00 45,000.00 35,000.00 35,000.00 10,000.00 677.51012 12-STRAND SINGLE MODE FIBER OPTIC CABLE LF 12,850. 4.00 51,400.00 2.00 25,700.00 25,700.00 677.51072 72-STRAND SINGLE MODE FIBER OPTIC CABLE LF 2,750. 4.50 12,375.00 6.00 16,500.00 -4,125.00 677.53 FIBER OPTIC SPLICE EA 16. 425.00 6,800.00 30.00 480.00 6,320.00 677.54101 GROUND MOUNTED ITS EQUIPMENT CABINET U 1. 13,000.00 13,000.00 17,500.00 17,500.00 -4,500.00 677.54201 POLE MOUNTED ITS EQUIPMENT CABINET U 1. 12,000.00 12,000.00 11,000.00 11,000.00 1,000.00 677.561 FIBER OPTIC PATCH PANEL (12-POSITION) EA 2. 900.00 1,800.00 500.00 1,000.00 800.00 677.5821 100 MBPS FIBER ETHERNET SWITCH EA 2. 4,000.00 8,000.00 6,500.00 13,000.00 -5,000.00 677.6201 MEDIA CONVERTER U 1. 500.00 500.00 500.00 500.00 677.6301 METER AND DISCONNECT PEDESTAL U 1. 1,800.00 1,800.00 1,500.00 1,500.00 300.00 677.6302 METER AND DISCONNECT PEDESTAL U 1. 1,800.00 1,800.00 1,500.00 1,500.00 300.00 677.64 UNINTERRUPTABLE POWER SUPPLY (UPS) EA 1. 12,000.00 12,000.00 1,500.00 1,500.00 10,500.00 677.9304 3-CONDUCTOR #4 AWG CABLE LF 620. 10.00 6,200.00 4.00 2,480.00 3,720.00 692. MOBILIZATION U 1. 2,050,000.00 2,050,000.00 2,454,163.21 2,454,163.21 -404,163.21 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 12,300.00 12,300.00 10,000.00 10,000.00 2,300.00 697.21 PROJECT HEALTH AND SAFETY PLAN U 1. 10,000.00 10,000.00 5,000.00 5,000.00 5,000.00 697.41 CRITICAL PATH METHOD (CPM) ELECTRONIC SCHEDULE U 1. 10,000.00 10,000.00 50,000.00 50,000.00 -40,000.00 698.11 FIELD OFFICE TYPE A MON 42. 2,000.00 84,000.00 2,000.00 84,000.00 698.2 PHYSICAL TESTING LABORATORY MON 38. 750.00 28,500.00 750.00 28,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 752,000.00 752,000.00 752,000.00 752,000.00 1006.22 SPECIAL WORK - SOIL TESTING $ 1. 65,000.00 65,000.00 65,000.00 65,000.00 1008.8 ALTERATIONS AND ADDITIONS AS NEEDED - WINTER MAINTENANCE $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 1010.15 FUEL ADJUSTMENT $ 1. 250,000.00 250,000.00 250,000.00 250,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 275,000.00 275,000.00 275,000.00 275,000.00 11238M PAGE 18 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 $43,155,392.45 $47,732,944.86 -4,577,552.41