THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PITTSBURG 16318 COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JUNE 21, 2011 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: US 3 IN PITTSBURG COMPLETION DATE: SEPTEMBER 30, 2011 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 923,684.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 25. 15.00 375.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 2. 250.00 500.00 202.7 REMOVAL OF GUARDRAIL LF 1,413. 1.50 2,119.50 203.1 COMMON EXCAVATION CY 400. 10.00 4,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 4. 800.00 3,200.00 214. FINE GRADING U 1. 40,000.00 40,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 35.00 17,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 50.00 2,500.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12 IN DEEP (F) SY 20,800. 1.50 31,200.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 4,000. 18.00 72,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,500. 85.00 127,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 150.00 7,500.00 405.11 COLD BITUMINOUS PAVEMENT, MACHINE METHOD (F) SY 20,250. 15.00 303,750.00 417. COLD PLANING BITUMINOUS SURFACES SY 500. 11.50 5,750.00 603.00215 15" R.C. PIPE, 2000D LF 32. 60.00 1,920.00 603.33112 12" CORR. POLYTHYENE END SECTION EA 2. 215.00 430.00 603.34115 15" STEEL END SECTIONS EA 6. 140.00 840.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 40. 55.00 2,200.00 603.50015 15" PIPE FOR DRIVES & MINOR APPROACHES LF 60. 50.00 3,000.00 16318 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.0007 POLYETHYLENE LINER EA 6. 150.00 900.00 604.12 CATCH BASINS TYPE B U 2. 2,000.00 4,000.00 604.242 DROP INLETS TYPE D-B U 2. 1,800.00 3,600.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 6. 300.00 1,800.00 604.72 GRATES & FRAMES, TYPE B EA 3. 500.00 1,500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 6. 400.00 2,400.00 605.906 6" PIPE UNDERDRAIN (CONTRACTORS OPTION) LF 2,200. 22.00 48,400.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 750. 17.00 12,750.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 4. 2,000.00 8,000.00 618.7 FLAGGERS HR 1,200. 21.00 25,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 39,000.00 39,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 1,500.00 3,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 20. 5.00 100.00 621.31 SINGLE DELINEATOR WITH POST EA 90. 30.00 2,700.00 622.1 STEEL WITNESS MARKERS EA 30. 25.00 750.00 628.2 SAWED BITUMINOUS PAVEMENT LF 100. 1.50 150.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 45,000. .15 6,750.00 645.3 EROSION STONE TON 100. 21.00 2,100.00 645.41 TEMPORARY SLOPE STABILIZATION TYPE A SY 2,500. 1.30 3,250.00 645.512 COMPOST SOCK FOR EROSION AND SEDIMENT CONTROL LF 1,400. 4.50 6,300.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 2.5 2,100.00 5,250.00 647.1 HUMUS CY 1,000. 36.50 36,500.00 692. MOBILIZATION U 1. 60,000.00 60,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 3,000.00 3,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 $923,684.50 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: PITTSBURG 16318 COUNTIES AND CODES: COOS 007 DATE BIDS OPEN: JUNE 21, 2011 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: US 3 IN PITTSBURG COMPLETION DATE: SEPTEMBER 30, 2011 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 923,684.50 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 25. 15.00 375.00 15.00 375.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 2. 250.00 500.00 350.00 700.00 -200.00 202.7 REMOVAL OF GUARDRAIL LF 1,413. 1.50 2,119.50 5.00 7,065.00 -4,945.50 203.1 COMMON EXCAVATION CY 400. 10.00 4,000.00 10.00 4,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 4. 800.00 3,200.00 750.00 3,000.00 200.00 214. FINE GRADING U 1. 40,000.00 40,000.00 20,000.00 20,000.00 20,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 35.00 17,500.00 20.00 10,000.00 7,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 50.00 2,500.00 30.00 1,500.00 1,000.00 306.112 RECLAIMED STABILIZED BASE PROCESSED IN PLACE, 12 IN DEEP (F) SY 20,800. 1.50 31,200.00 1.50 31,200.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 4,000. 18.00 72,000.00 20.00 80,000.00 -8,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,500. 85.00 127,500.00 82.00 123,000.00 4,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 150.00 7,500.00 125.00 6,250.00 1,250.00 405.11 COLD BITUMINOUS PAVEMENT, MACHINE METHOD (F) SY 20,250. 15.00 303,750.00 15.40 311,850.00 -8,100.00 417. COLD PLANING BITUMINOUS SURFACES SY 500. 11.50 5,750.00 8.00 4,000.00 1,750.00 603.00215 15" R.C. PIPE, 2000D LF 32. 60.00 1,920.00 50.00 1,600.00 320.00 603.33112 12" CORR. POLYTHYENE END SECTION EA 2. 215.00 430.00 250.00 500.00 -70.00 603.34115 15" STEEL END SECTIONS EA 6. 140.00 840.00 300.00 1,800.00 -960.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 40. 55.00 2,200.00 40.00 1,600.00 600.00 16318 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 603.50015 15" PIPE FOR DRIVES & MINOR APPROACHES LF 60. 50.00 3,000.00 40.00 2,400.00 600.00 604.0007 POLYETHYLENE LINER EA 6. 150.00 900.00 250.00 1,500.00 -600.00 604.12 CATCH BASINS TYPE B U 2. 2,000.00 4,000.00 2,000.00 4,000.00 604.242 DROP INLETS TYPE D-B U 2. 1,800.00 3,600.00 1,800.00 3,600.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 6. 300.00 1,800.00 500.00 3,000.00 -1,200.00 604.72 GRATES & FRAMES, TYPE B EA 3. 500.00 1,500.00 600.00 1,800.00 -300.00 605.79 UNDERDRAIN FLUSHING BASINS EA 6. 400.00 2,400.00 600.00 3,600.00 -1,200.00 605.906 6" PIPE UNDERDRAIN (CONTRACTORS OPTION) LF 2,200. 22.00 48,400.00 20.00 44,000.00 4,400.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 750. 17.00 12,750.00 20.00 15,000.00 -2,250.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 4. 2,000.00 8,000.00 2,500.00 10,000.00 -2,000.00 618.7 FLAGGERS HR 1,200. 21.00 25,200.00 25.00 30,000.00 -4,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 39,000.00 39,000.00 25,000.00 25,000.00 14,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 1,500.00 3,000.00 1,500.00 3,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 20. 5.00 100.00 5.00 100.00 621.31 SINGLE DELINEATOR WITH POST EA 90. 30.00 2,700.00 30.00 2,700.00 622.1 STEEL WITNESS MARKERS EA 30. 25.00 750.00 30.00 900.00 -150.00 628.2 SAWED BITUMINOUS PAVEMENT LF 100. 1.50 150.00 3.00 300.00 -150.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 45,000. .15 6,750.00 .16 7,200.00 -450.00 645.3 EROSION STONE TON 100. 21.00 2,100.00 40.00 4,000.00 -1,900.00 645.41 TEMPORARY SLOPE STABILIZATION TYPE A SY 2,500. 1.30 3,250.00 1.25 3,125.00 125.00 645.512 COMPOST SOCK FOR EROSION AND SEDIMENT CONTROL LF 1,400. 4.50 6,300.00 5.00 7,000.00 -700.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 2.5 2,100.00 5,250.00 1,500.00 3,750.00 1,500.00 647.1 HUMUS CY 1,000. 36.50 36,500.00 20.00 20,000.00 16,500.00 692. MOBILIZATION U 1. 60,000.00 60,000.00 25,000.00 25,000.00 35,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 3,000.00 3,000.00 3,000.00 3,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $923,684.50 $852,415.00 71,269.50