THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT II 16162 COUNTIES AND CODES: MERRIMACK 013 GRAFTON 009 SULLIVAN 019 DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 26, 2011 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,478,443.00 B CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,484,692.50 C THE LANE CONSTRUCTION CORP. 90 FIELDSTONE COURT, CHESHIRE, CT. 06410 $ 2,137,155.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,750. 61.00 106,750.00 61.00 106,750.00 82.00 143,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 105.00 5,250.00 110.00 5,500.00 110.00 5,500.00 403.21 WARM BITUMINOUS PAVEMENT, MACHINE METHOD TON 2,900. 61.00 176,900.00 63.00 182,700.00 90.00 261,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 2,900. 61.00 176,900.00 62.00 179,800.00 90.00 261,000.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 13,325. 61.00 812,825.00 62.90 838,142.50 87.00 1,159,275.00 417. COLD PLANING BITUMINOUS SURFACES SY 34,800. 1.45 50,460.00 1.50 52,200.00 2.65 92,220.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 1,100. 18.50 20,350.00 21.00 23,100.00 27.50 30,250.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 168.00 1,008.00 250.00 1,500.00 735.00 4,410.00 692. MOBILIZATION U 1. 58,000.00 58,000.00 25,000.00 25,000.00 110,000.00 110,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 $1,478,443.00 $1,484,692.50 $2,137,155.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: RESURFACING DISTRICT II 16162 COUNTIES AND CODES: MERRIMACK 013 GRAFTON 009 SULLIVAN 019 DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: AUGUST 26, 2011 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 1,478,443.00 B CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,484,692.50 C THE LANE CONSTRUCTION CORP. 90 FIELDSTONE COURT, CHESHIRE, CT. 06410 $ 2,137,155.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,750. 61.00 106,750.00 70.00 122,500.00 -15,750.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 105.00 5,250.00 125.00 6,250.00 -1,000.00 403.21 WARM BITUMINOUS PAVEMENT, MACHINE METHOD TON 2,900. 61.00 176,900.00 70.00 203,000.00 -26,100.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 2,900. 61.00 176,900.00 73.00 211,700.00 -34,800.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 13,325. 61.00 812,825.00 73.00 972,725.00 -159,900.00 417. COLD PLANING BITUMINOUS SURFACES SY 34,800. 1.45 50,460.00 3.00 104,400.00 -53,940.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 1,100. 18.50 20,350.00 21.00 23,100.00 -2,750.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 168.00 1,008.00 300.00 1,800.00 -792.00 692. MOBILIZATION U 1. 58,000.00 58,000.00 80,000.00 80,000.00 -22,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 $1,478,443.00 $1,795,475.00 -317,032.00