THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NEW CASTLE 15895 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 22, 2011 SCOPE OF WORK: GUARDRAIL REPLACEMENT LOCATION: NH ROUTE 1B BETWEEN GOAT ISLAND AND NEW CASTLE ISLAND COMPLETION DATE: MAY 18, 2012 A WYMAN AND SIMPSON, INC. 910 MAIN ST, RICHMOND, ME 04357 $ 284,076.50 B JAMCO EXCAVATORS, LLC 84 EXETER ROAD, SOUTH HAMPTON, NH 03827 $ 297,182.35 C R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 322,605.00 D NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 347,979.50 E CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 371,715.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL LF 2,604. 1.00 2,604.00 2.00 5,208.00 3.75 9,765.00 203.1 COMMON EXCAVATION CY 360. 10.00 3,600.00 20.00 7,200.00 10.00 3,600.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 2. 1,400.00 2,800.00 750.00 1,500.00 2,800.00 5,600.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 36.00 1,800.00 20.00 1,000.00 20.00 1,000.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 12. 180.00 2,160.00 38.50 462.00 40.00 480.00 304.401 CRUSHED STONE (FINE GRADATION) CY 400. 28.00 11,200.00 36.00 14,400.00 30.00 12,000.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 250. 92.00 23,000.00 81.50 20,375.00 84.00 21,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 70.00 4,900.00 120.00 8,400.00 125.00 8,750.00 403.6 PAVEMENT JOINT ADHESIVE LF 1,200. 1.25 1,500.00 1.35 1,620.00 1.50 1,800.00 417. COLD PLANING BITUMINOUS SURFACES SY 185. 24.00 4,440.00 28.00 5,180.00 29.00 5,365.00 583.001 RIPRAP TON 250. 33.00 8,250.00 15.00 3,750.00 50.00 12,500.00 583.9 RECONSTRUCT EXISTING RIPRAP SY 1,800. 2.00 3,600.00 7.00 12,600.00 4.00 7,200.00 593.222 GEOTEXTILE; SEPARATION CL.2, MONOFIL.,WOVEN SY 2,525. 3.80 9,595.00 3.80 9,595.00 2.50 6,312.50 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 25 FT.) U 6. 3,400.00 20,400.00 2,400.00 14,400.00 2,600.00 15,600.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POST (NU GUARD) LF 2,438. 27.50 67,045.00 32.50 79,235.00 35.00 85,330.00 15895 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 170. 18.00 3,060.00 .37 62.90 20.00 3,400.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 1. 1,500.00 1,500.00 4.45 4.45 4,000.00 4,000.00 615.02 TRAFFIC SIGN TYPE B (F) SF 27. 65.00 1,755.00 100.00 2,700.00 60.00 1,620.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 400. 21.00 8,400.00 18.00 7,200.00 20.00 8,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 38,000.00 38,000.00 25,000.00 25,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 1,000.00 2,000.00 1,600.00 3,200.00 2,500.00 5,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 35. 5.00 175.00 7.00 245.00 4.50 157.50 621.31 SINGLE DELINEATOR WITH POST EA 35. 32.00 1,120.00 31.00 1,085.00 30.00 1,050.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,000. 1.50 3,000.00 1.00 2,000.00 2.00 4,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 4,800. .20 960.00 .20 960.00 .25 1,200.00 645.531 SILT FENCE LF 800. 2.25 1,800.00 3.50 2,800.00 3.00 2,400.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 1,800.00 1,800.00 6,500.00 6,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 75.00 3,750.00 65.00 3,250.00 75.00 3,750.00 646.51 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND LOAM SY 1,575. 5.50 8,662.50 6.00 9,450.00 3.00 4,725.00 692. MOBILIZATION U 1. 29,000.00 29,000.00 29,000.00 29,000.00 45,000.00 45,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 $284,076.50 $297,182.35 $322,605.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NEW CASTLE 15895 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 22, 2011 SCOPE OF WORK: GUARDRAIL REPLACEMENT LOCATION: NH ROUTE 1B BETWEEN GOAT ISLAND AND NEW CASTLE ISLAND COMPLETION DATE: MAY 18, 2012 A WYMAN AND SIMPSON, INC. 910 MAIN ST, RICHMOND, ME 04357 $ 284,076.50 B JAMCO EXCAVATORS, LLC 84 EXETER ROAD, SOUTH HAMPTON, NH 03827 $ 297,182.35 C R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 322,605.00 D NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 347,979.50 E CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 371,715.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL LF 2,604. 6.50 16,926.00 5.00 13,020.00 203.1 COMMON EXCAVATION CY 360. 14.00 5,040.00 30.00 10,800.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 2. 1,280.00 2,560.00 2,500.00 5,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 154.00 7,700.00 50.00 2,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 12. 43.00 516.00 70.00 840.00 304.401 CRUSHED STONE (FINE GRADATION) CY 400. 40.00 16,000.00 48.00 19,200.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 250. 112.00 28,000.00 82.00 20,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 172.00 12,040.00 163.00 11,410.00 403.6 PAVEMENT JOINT ADHESIVE LF 1,200. 3.50 4,200.00 2.25 2,700.00 417. COLD PLANING BITUMINOUS SURFACES SY 185. 28.00 5,180.00 32.00 5,920.00 583.001 RIPRAP TON 250. 34.50 8,625.00 60.00 15,000.00 583.9 RECONSTRUCT EXISTING RIPRAP SY 1,800. 5.60 10,080.00 7.00 12,600.00 593.222 GEOTEXTILE; SEPARATION CL.2, MONOFIL.,WOVEN SY 2,525. 2.40 6,060.00 4.00 10,100.00 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 25 FT.) U 6. 2,880.00 17,280.00 2,760.00 16,560.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POST (NU GUARD) LF 2,438. 38.00 92,644.00 45.00 109,710.00 15895 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 170. 65.00 11,050.00 36.00 6,120.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 1. 1,200.00 1,200.00 3,000.00 3,000.00 615.02 TRAFFIC SIGN TYPE B (F) SF 27. 78.00 2,106.00 60.00 1,620.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 400. 28.00 11,200.00 25.00 10,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 21,200.00 21,200.00 22,000.00 22,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,000.00 4,000.00 2,700.00 5,400.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 35. 8.50 297.50 8.00 280.00 621.31 SINGLE DELINEATOR WITH POST EA 35. 38.00 1,330.00 36.00 1,260.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,000. 3.65 7,300.00 2.75 5,500.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 4,800. .65 3,120.00 .25 1,200.00 645.531 SILT FENCE LF 800. 6.00 4,800.00 1.85 1,480.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,200.00 2,200.00 2,000.00 2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 79.00 3,950.00 86.00 4,300.00 646.51 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND LOAM SY 1,575. 5.00 7,875.00 2.60 4,095.00 692. MOBILIZATION U 1. 23,000.00 23,000.00 37,100.00 37,100.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 3,500.00 3,500.00 3,500.00 3,500.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 $347,979.50 $371,715.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: NEW CASTLE 15895 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: DECEMBER 22, 2011 SCOPE OF WORK: GUARDRAIL REPLACEMENT LOCATION: NH ROUTE 1B BETWEEN GOAT ISLAND AND NEW CASTLE ISLAND COMPLETION DATE: MAY 18, 2012 A WYMAN AND SIMPSON, INC. 910 MAIN ST, RICHMOND, ME 04357 $ 284,076.50 B JAMCO EXCAVATORS, LLC 84 EXETER ROAD, SOUTH HAMPTON, NH 03827 $ 297,182.35 C R.M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 322,605.00 D NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 347,979.50 E CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 371,715.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.7 REMOVAL OF GUARDRAIL LF 2,604. 1.00 2,604.00 3.50 9,114.00 -6,510.00 203.1 COMMON EXCAVATION CY 360. 10.00 3,600.00 12.00 4,320.00 -720.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 2. 1,400.00 2,800.00 950.00 1,900.00 900.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 36.00 1,800.00 40.00 2,000.00 -200.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 12. 180.00 2,160.00 50.00 600.00 1,560.00 304.401 CRUSHED STONE (FINE GRADATION) CY 400. 28.00 11,200.00 25.00 10,000.00 1,200.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 250. 92.00 23,000.00 85.00 21,250.00 1,750.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 70. 70.00 4,900.00 120.00 8,400.00 -3,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 1,200. 1.25 1,500.00 2.50 3,000.00 -1,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 185. 24.00 4,440.00 35.00 6,475.00 -2,035.00 583.001 RIPRAP TON 250. 33.00 8,250.00 40.00 10,000.00 -1,750.00 583.9 RECONSTRUCT EXISTING RIPRAP SY 1,800. 2.00 3,600.00 15.00 27,000.00 -23,400.00 593.222 GEOTEXTILE; SEPARATION CL.2, MONOFIL.,WOVEN SY 2,525. 3.80 9,595.00 5.00 12,625.00 -3,030.00 606.1455 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 25 FT.) U 6. 3,400.00 20,400.00 2,000.00 12,000.00 8,400.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POST (NU GUARD) LF 2,438. 27.50 67,045.00 20.00 48,760.00 18,285.00 15895 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 170. 18.00 3,060.00 20.00 3,400.00 -340.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 1. 1,500.00 1,500.00 2,200.00 2,200.00 -700.00 615.02 TRAFFIC SIGN TYPE B (F) SF 27. 65.00 1,755.00 50.00 1,350.00 405.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 400. 21.00 8,400.00 25.00 10,000.00 -1,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 45,000.00 45,000.00 -5,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 1,000.00 2,000.00 3,500.00 7,000.00 -5,000.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 35. 5.00 175.00 5.00 175.00 621.31 SINGLE DELINEATOR WITH POST EA 35. 32.00 1,120.00 35.00 1,225.00 -105.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,000. 1.50 3,000.00 2.00 4,000.00 -1,000.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 4,800. .20 960.00 .50 2,400.00 -1,440.00 645.531 SILT FENCE LF 800. 2.25 1,800.00 3.50 2,800.00 -1,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 3,500.00 3,500.00 -2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 50. 75.00 3,750.00 75.00 3,750.00 646.51 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND LOAM SY 1,575. 5.50 8,662.50 5.00 7,875.00 787.50 692. MOBILIZATION U 1. 29,000.00 29,000.00 25,000.00 25,000.00 4,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 3,500.00 3,500.00 3,500.00 3,500.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 $284,076.50 $307,619.00 -23,542.50