THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NORTHFIELD X-A000(898), 15705 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: OCTOBER 6, 2011 SCOPE OF WORK: 2.5 MILES OF PAVEMENT AND BRIDGE REHABILITATION WORK ON 6 BRIDGES LOCATION: I-93 NB AND SB COMPLETION DATE: JULY 26, 2013 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 3,294,588.80 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 3,323,650.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.0101 CLEARING A 4.5 600.00 2,700.00 600.00 2,700.00 201.101 CLEARING AND GRUBBING A .5 7,500.00 3,750.00 10,000.00 5,000.00 201.22 REMOVING LARGE TREES EA 5. 450.00 2,250.00 450.00 2,250.00 201.701 SELECTIVE CLEARING AND THINNING A 3.7 600.00 2,220.00 600.00 2,220.00 202.7 REMOVAL OF GUARDRAIL LF 3,300. 2.20 7,260.00 2.20 7,260.00 203.2 ROCK EXCAVATION CY 30. 68.00 2,040.00 75.00 2,250.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 2. 1,050.00 2,100.00 1,250.00 2,500.00 203.5596 GUARDRAIL E-2 PLATFORM LF 1,600. 7.00 11,200.00 4.00 6,400.00 209.1 GRANULAR BACKFILL CY 5. 50.00 250.00 35.00 175.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,100. 12.00 25,200.00 14.00 29,400.00 403.11091 HOT BITUMINOUS PAVEMENT MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 22,300. 67.50 1,505,250.00 67.00 1,494,100.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD, NIGHT (QC/QA TIER 2) TON 320. 75.00 24,000.00 67.00 21,440.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 6. 175.00 1,050.00 115.00 690.00 403.129 HOT BITUMINOUS PAVEMENT, HAND METHOD (NIGHT) TON 50. 175.00 8,750.00 115.00 5,750.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 22,800. 1.20 27,360.00 1.00 22,800.00 403.6 PAVEMENT JOINT ADHESIVE LF 163,000. .24 39,120.00 .24 39,120.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 207. 150.00 31,050.00 115.00 23,805.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 175. 75.00 13,125.00 75.00 13,125.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 109,000. 1.25 136,250.00 1.50 163,500.00 15705 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 12,800. 1.70 21,760.00 1.40 17,920.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 10. 30.00 300.00 20.00 200.00 504.2 ROCK BRIDGE EXCAVATION CY 1. 2,500.00 2,500.00 1,000.00 1,000.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 788. 11.00 8,668.00 12.00 9,456.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 703. 11.00 7,733.00 12.00 8,436.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 616. 11.00 6,776.00 12.00 7,392.00 511.0004 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 616. 11.00 6,776.00 12.00 7,392.00 511.0005 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 445. 11.00 4,895.00 12.00 5,340.00 511.0006 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 445. 11.00 4,895.00 12.00 5,340.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 188. 165.00 31,020.00 280.00 52,640.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 83. 295.00 24,485.00 450.00 37,350.00 520.01 CONCRETE CLASS AA CY 24. 1,250.00 30,000.00 525.00 12,600.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 25. 1,700.00 42,500.00 975.00 24,375.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 3,613. 19.00 68,647.00 20.00 72,260.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) (F) LF 42. 86.00 3,612.00 86.00 3,612.00 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT, 20" WIDE (F) LF 464. 98.00 45,472.00 98.00 45,472.00 565.802 ADJUSTING BRIDGE GUARDRAIL U 28. 250.00 7,000.00 250.00 7,000.00 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 115.00 2,875.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 30. 275.00 8,250.00 350.00 10,500.00 605.82245 24" AGGREGATE UNDERDRAIN TYPE 2, WITH PERFORATED PVC 4" PIPE LF 57. 50.00 2,850.00 50.00 2,850.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 2,500. 9.00 22,500.00 8.90 22,250.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 400. 65.00 26,000.00 65.00 26,000.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 400. 10.00 4,000.00 10.00 4,000.00 15705 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 2,000. 16.14 32,280.00 17.50 35,000.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 1,989.00 3,978.00 2,050.00 4,100.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 468.00 468.00 500.00 500.00 606.1496 BEAM GUARDRAIL (TERMINAL UNIT TYPE E-2) LF 1,600. 26.16 41,856.00 27.50 44,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,300. 17.00 39,100.00 20.00 46,000.00 606.9147 RESETTING TERMINAL UNIT TYPE G-2 U 13. 182.00 2,366.00 60.00 780.00 606.915 RESETTING GUARDRAIL BLOCK & RAIL ONLY LF 15,750. 4.44 69,930.00 5.25 82,687.50 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 6. 2,500.00 15,000.00 4,000.00 24,000.00 608.28 8" CONCRETE SIDEWALK (F) SY 120. 60.00 7,200.00 75.00 9,000.00 609.5 RESET GRANITE CURB LF 1,000. 9.50 9,500.00 7.50 7,500.00 609.55 RESET GRANITE CURB (BRIDGE) LF 144. 60.00 8,640.00 65.00 9,360.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 200. 15.00 3,000.00 5.00 1,000.00 616.95 INSTALLATION OF TRAFFIC STUDY EQUIPMENT U 2. 5,500.00 11,000.00 5,500.00 11,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 80,000.00 80,000.00 80,000.00 80,000.00 618.7 FLAGGERS HR 3,100. 10.00 31,000.00 22.00 68,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 100,000.00 100,000.00 25,000.00 25,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 100. 150.00 15,000.00 400.00 40,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 100. 90.00 9,000.00 50.00 5,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 210. 4.00 840.00 4.00 840.00 621.31 SINGLE DELINEATOR WITH POST EA 120. 30.00 3,600.00 30.00 3,600.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,350. 1.40 1,890.00 1.00 1,350.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 42. 1.40 58.80 10.00 420.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 198,000. .11 21,780.00 .11 21,780.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 3,900. 1.50 5,850.00 1.50 5,850.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 125. 3.00 375.00 3.00 375.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 50. 8.00 400.00 8.00 400.00 632.71206 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 6" LINE LF 73,100. .88 64,328.00 .88 64,328.00 15705 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.71212 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 12" LINE LF 2,000. 1.80 3,600.00 1.80 3,600.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 122,000. .28 34,160.00 .28 34,160.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 125. 2.00 250.00 2.00 250.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 50. 2.00 100.00 2.00 100.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 6.5 1,650.00 10,725.00 1,650.00 10,725.00 647.1 HUMUS CY 3,000. 9.00 27,000.00 20.00 60,000.00 670.104 TEMPORARY LIGHTING PORTABLE U 6. 2,000.00 12,000.00 3,500.00 21,000.00 692. MOBILIZATION U 1. 165,000.00 165,000.00 110,000.00 110,000.00 698.13 FIELD OFFICE TYPE C MON 18. 500.00 9,000.00 2,000.00 36,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 $3,294,588.80 $3,323,650.50 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: NORTHFIELD X-A000(898), 15705 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: OCTOBER 6, 2011 SCOPE OF WORK: 2.5 MILES OF PAVEMENT AND BRIDGE REHABILITATION WORK ON 6 BRIDGES LOCATION: I-93 NB AND SB COMPLETION DATE: JULY 26, 2013 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 3,294,588.80 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 3,323,650.50 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.0101 CLEARING A 4.5 600.00 2,700.00 3,960.00 17,820.00 -15,120.00 201.101 CLEARING AND GRUBBING A .5 7,500.00 3,750.00 8,000.00 4,000.00 -250.00 201.22 REMOVING LARGE TREES EA 5. 450.00 2,250.00 750.00 3,750.00 -1,500.00 201.701 SELECTIVE CLEARING AND THINNING A 3.7 600.00 2,220.00 5,000.00 18,500.00 -16,280.00 202.7 REMOVAL OF GUARDRAIL LF 3,300. 2.20 7,260.00 1.30 4,290.00 2,970.00 203.2 ROCK EXCAVATION CY 30. 68.00 2,040.00 67.00 2,010.00 30.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 2. 1,050.00 2,100.00 1,100.00 2,200.00 -100.00 203.5596 GUARDRAIL E-2 PLATFORM LF 1,600. 7.00 11,200.00 10.00 16,000.00 -4,800.00 209.1 GRANULAR BACKFILL CY 5. 50.00 250.00 32.00 160.00 90.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 2,100. 12.00 25,200.00 18.00 37,800.00 -12,600.00 403.11091 HOT BITUMINOUS PAVEMENT MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 22,300. 67.50 1,505,250.00 65.00 1,449,500.00 55,750.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD, NIGHT (QC/QA TIER 2) TON 320. 75.00 24,000.00 65.00 20,800.00 3,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 6. 175.00 1,050.00 130.00 780.00 270.00 403.129 HOT BITUMINOUS PAVEMENT, HAND METHOD (NIGHT) TON 50. 175.00 8,750.00 125.00 6,250.00 2,500.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 22,800. 1.20 27,360.00 1.00 22,800.00 4,560.00 403.6 PAVEMENT JOINT ADHESIVE LF 163,000. .24 39,120.00 .25 40,750.00 -1,630.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 207. 150.00 31,050.00 160.00 33,120.00 -2,070.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 175. 75.00 13,125.00 74.00 12,950.00 175.00 15705 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 109,000. 1.25 136,250.00 1.78 194,020.00 -57,770.00 417.53 REMOVE AND INLAY EXISTING RUMBLE STRIPS LF 12,800. 1.70 21,760.00 1.20 15,360.00 6,400.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 10. 30.00 300.00 20.00 200.00 100.00 504.2 ROCK BRIDGE EXCAVATION CY 1. 2,500.00 2,500.00 100.00 100.00 2,400.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 788. 11.00 8,668.00 15.00 11,820.00 -3,152.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 703. 11.00 7,733.00 15.00 10,545.00 -2,812.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 616. 11.00 6,776.00 15.00 9,240.00 -2,464.00 511.0004 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 616. 11.00 6,776.00 15.00 9,240.00 -2,464.00 511.0005 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 445. 11.00 4,895.00 15.00 6,675.00 -1,780.00 511.0006 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 445. 11.00 4,895.00 15.00 6,675.00 -1,780.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 188. 165.00 31,020.00 300.00 56,400.00 -25,380.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 83. 295.00 24,485.00 550.00 45,650.00 -21,165.00 520.01 CONCRETE CLASS AA CY 24. 1,250.00 30,000.00 800.00 19,200.00 10,800.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 25. 1,700.00 42,500.00 1,200.00 30,000.00 12,500.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 3,613. 19.00 68,647.00 25.00 90,325.00 -21,678.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) (F) LF 42. 86.00 3,612.00 85.00 3,570.00 42.00 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT, 20" WIDE (F) LF 464. 98.00 45,472.00 125.00 58,000.00 -12,528.00 565.802 ADJUSTING BRIDGE GUARDRAIL U 28. 250.00 7,000.00 600.00 16,800.00 -9,800.00 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 154.00 3,850.00 -100.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 30. 275.00 8,250.00 300.00 9,000.00 -750.00 605.82245 24" AGGREGATE UNDERDRAIN TYPE 2, WITH PERFORATED PVC 4" PIPE LF 57. 50.00 2,850.00 150.00 8,550.00 -5,700.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 2,500. 9.00 22,500.00 12.00 30,000.00 -7,500.00 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 400. 65.00 26,000.00 60.00 24,000.00 2,000.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 400. 10.00 4,000.00 12.00 4,800.00 -800.00 15705 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 2,000. 16.14 32,280.00 18.00 36,000.00 -3,720.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 1,989.00 3,978.00 2,050.00 4,100.00 -122.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 468.00 468.00 520.00 520.00 -52.00 606.1496 BEAM GUARDRAIL (TERMINAL UNIT TYPE E-2) LF 1,600. 26.16 41,856.00 26.25 42,000.00 -144.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,300. 17.00 39,100.00 18.50 42,550.00 -3,450.00 606.9147 RESETTING TERMINAL UNIT TYPE G-2 U 13. 182.00 2,366.00 400.00 5,200.00 -2,834.00 606.915 RESETTING GUARDRAIL BLOCK & RAIL ONLY LF 15,750. 4.44 69,930.00 6.25 98,437.50 -28,507.50 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 6. 2,500.00 15,000.00 3,400.00 20,400.00 -5,400.00 608.28 8" CONCRETE SIDEWALK (F) SY 120. 60.00 7,200.00 50.00 6,000.00 1,200.00 609.5 RESET GRANITE CURB LF 1,000. 9.50 9,500.00 7.00 7,000.00 2,500.00 609.55 RESET GRANITE CURB (BRIDGE) LF 144. 60.00 8,640.00 75.00 10,800.00 -2,160.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 200. 15.00 3,000.00 4.50 900.00 2,100.00 616.95 INSTALLATION OF TRAFFIC STUDY EQUIPMENT U 2. 5,500.00 11,000.00 6,000.00 12,000.00 -1,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 80,000.00 80,000.00 80,000.00 80,000.00 618.7 FLAGGERS HR 3,100. 10.00 31,000.00 21.00 65,100.00 -34,100.00 619.1 MAINTENANCE OF TRAFFIC U 1. 100,000.00 100,000.00 60,000.00 60,000.00 40,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 100. 150.00 15,000.00 250.00 25,000.00 -10,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 100. 90.00 9,000.00 350.00 35,000.00 -26,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 210. 4.00 840.00 4.20 882.00 -42.00 621.31 SINGLE DELINEATOR WITH POST EA 120. 30.00 3,600.00 30.00 3,600.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,350. 1.40 1,890.00 1.25 1,687.50 202.50 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 42. 1.40 58.80 15.00 630.00 -571.20 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 198,000. .11 21,780.00 .12 23,760.00 -1,980.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 3,900. 1.50 5,850.00 1.70 6,630.00 -780.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 125. 3.00 375.00 2.30 287.50 87.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 50. 8.00 400.00 4.30 215.00 185.00 632.71206 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 6" LINE LF 73,100. .88 64,328.00 .85 62,135.00 2,193.00 15705 PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 632.71212 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 12" LINE LF 2,000. 1.80 3,600.00 1.90 3,800.00 -200.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 122,000. .28 34,160.00 .30 36,600.00 -2,440.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 125. 2.00 250.00 1.00 125.00 125.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 50. 2.00 100.00 1.40 70.00 30.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 6.5 1,650.00 10,725.00 1,800.00 11,700.00 -975.00 647.1 HUMUS CY 3,000. 9.00 27,000.00 14.00 42,000.00 -15,000.00 670.104 TEMPORARY LIGHTING PORTABLE U 6. 2,000.00 12,000.00 5,000.00 30,000.00 -18,000.00 692. MOBILIZATION U 1. 165,000.00 165,000.00 180,000.00 180,000.00 -15,000.00 698.13 FIELD OFFICE TYPE C MON 18. 500.00 9,000.00 1,650.00 29,700.00 -20,700.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 60,000.00 60,000.00 60,000.00 60,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 $3,294,588.80 $3,567,329.50 -272,740.70