THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ROLLINSFORD, NH - SOUTH BERWICH, ME A000(248), 14241 COUNTIES AND CODES: STRAFFORD 017 YORK DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: PAVEMENT REHABILITATION AND BRIDGE REHABILITATION LOCATION: NH ROUTE 4 BRIDGE OVER THE SALMON FALLS RIVER COMPLETION DATE: OCTOBER 14, 2011 A CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,308,715.70 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,309,341.20 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,344,807.58 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,372,523.55 E BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,423,942.95 F TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,580,330.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,891,250.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.881 INVASIVE SPECIES CONTROL TYPE I SY 15. 50.00 750.00 1.75 26.25 13.00 195.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 15. 50.00 750.00 1.75 26.25 13.00 195.00 202.7 REMOVAL OF GUARDRAIL LF 6,700. 1.00 6,700.00 1.05 7,035.00 1.00 6,700.00 203.1 COMMON EXCAVATION CY 135. 20.00 2,700.00 23.00 3,105.00 25.00 3,375.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 16. 1,250.00 20,000.00 1,165.00 18,640.00 600.00 9,600.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 9. 1,000.00 9,000.00 1,535.00 13,815.00 600.00 5,400.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 1,000.00 3,000.00 1,535.00 4,605.00 400.00 1,200.00 203.5596 GUARDRAIL E-2 PLATFORM LF 329. 15.00 4,935.00 28.50 9,376.50 13.00 4,277.00 203.6 EMBANKMENT-IN-PLACE (F) CY 260. 10.00 2,600.00 9.25 2,405.00 10.00 2,600.00 206.1 COMMON STRUCTURE EXCAVATION CY 140. 25.00 3,500.00 41.00 5,740.00 25.00 3,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 57.00 1,140.00 25.00 500.00 206.2 ROCK STRUCTURE EXCAVATION CY 20. 75.00 1,500.00 145.00 2,900.00 50.00 1,000.00 14241 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.301 CRUSHED GRAVEL CY 229. 32.00 7,328.00 30.00 6,870.00 37.00 8,473.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 20.00 10,000.00 27.00 13,500.00 25.00 12,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 5. 35.00 175.00 46.00 230.00 40.00 200.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 70. 65.00 4,550.00 113.00 7,910.00 115.00 8,050.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,150. 65.00 269,750.00 68.50 284,275.00 64.50 267,675.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD (QC/QA TIER 2) (NIGHT TON 2,530. 65.00 164,450.00 68.50 173,305.00 64.50 163,185.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 425. 125.00 53,125.00 115.00 48,875.00 100.00 42,500.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 6,680. 1.00 6,680.00 1.45 9,686.00 2.00 13,360.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,600. .24 11,424.00 .25 11,900.00 .35 16,660.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 45. 150.00 6,750.00 165.00 7,425.00 245.00 11,025.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 50. 75.00 3,750.00 115.00 5,750.00 200.00 10,000.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 20. 75.00 1,500.00 165.00 3,300.00 200.00 4,000.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 32,900. 1.75 57,575.00 2.50 82,250.00 2.00 65,800.00 500.021 PREPARATION FOR FATIGUE CRACK INSPECTION - COVER PLATE U 28. 100.00 2,800.00 187.00 5,236.00 155.00 4,340.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 162,000.00 162,000.00 151,800.00 151,800.00 155,000.00 155,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 22. 50.00 1,100.00 22.00 484.00 40.00 880.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 10. 930.00 9,300.00 895.00 8,950.00 400.00 4,000.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 930.00 4,650.00 2,030.00 10,150.00 500.00 2,500.00 520.01 CONCRETE CLASS AA CY 22. 1,080.00 23,760.00 1,030.00 22,660.00 625.00 13,750.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 280. 860.00 240,800.00 675.00 189,000.00 725.00 203,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 52. 30.00 1,560.00 51.00 2,652.00 95.00 4,940.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 34. 27.00 918.00 38.60 1,312.40 23.00 782.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 777. 23.00 17,871.00 22.00 17,094.00 20.00 15,540.00 544. REINFORCING STEEL (F) LB 2,605. 3.00 7,815.00 4.40 11,462.00 1.18 3,073.90 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 38. 8.20 311.60 9.50 361.00 3.65 138.70 14241 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 62,799. 1.20 75,358.80 1.10 69,078.90 1.27 79,754.73 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 3,993. 4.50 17,968.50 3.90 15,572.70 3.95 15,772.35 547. SHEAR CONNECTORS (F) EA 1,372. 4.40 6,036.80 8.00 10,976.00 3.95 5,419.40 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 14. 2,100.00 29,400.00 1,280.00 17,920.00 1,650.00 23,100.00 550.1 STRUCTURAL STEEL (F) LB 4,070. 8.00 32,560.00 5.15 20,960.50 5.05 20,553.50 550.191 TEMPORARY GIRDER SUPPORT SYSTEM U 1. 16,000.00 16,000.00 26,770.00 26,770.00 38,000.00 38,000.00 560.101 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT (F) LF 105. 700.00 73,500.00 518.00 54,390.00 625.00 65,625.00 562.1 SILICONE JOINT SEALANT (F LF 37. 10.00 370.00 30.35 1,122.95 45.00 1,665.00 563.23 BRIDGE RAIL T3 (F) LF 280. 135.00 37,800.00 140.00 39,200.00 133.00 37,240.00 563.24 BRIDGE RAIL T4 (F) LF 219. 145.00 31,755.00 149.00 32,631.00 143.00 31,317.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 324. 74.00 23,976.00 160.00 51,840.00 225.00 72,900.00 565.2301 BRIDGE APPROACH RAIL T3 (FULL HEIGHT) LF 80. 160.00 12,800.00 165.00 13,200.00 160.00 12,800.00 565.2401 BRIDGE APPROACH RAIL T4 (FULL HEIGHT) LF 136. 180.00 24,480.00 185.00 25,160.00 180.00 24,480.00 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 17.00 85.00 515.00 2,575.00 650.00 3,250.00 585.3 STONE FILL, CLASS C CY 10. 25.00 250.00 50.00 500.00 70.00 700.00 603.11012 12" CORR. STEEL PIPE, .064" LF 120. 45.00 5,400.00 43.00 5,160.00 35.00 4,200.00 603.34112 12" STEEL END SECTIONS EA 3. 250.00 750.00 248.00 744.00 135.00 405.00 604.0007 POLYETHYLENE LINER EA 13. 115.00 1,495.00 245.00 3,185.00 240.00 3,120.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 15. 350.00 5,250.00 220.00 3,300.00 235.00 3,525.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 850. 15.00 12,750.00 25.00 21,250.00 30.00 25,500.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,450. 16.95 143,227.50 17.50 147,875.00 16.80 141,960.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 25. 2,000.00 50,000.00 2,060.00 51,500.00 1,975.00 49,375.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 3. 1,800.00 5,400.00 1,855.00 5,565.00 1,825.00 5,475.00 606.1296 BEAM GUARDRAIL (TERM. SEC TYPE E-2) (STEEL POST) LF 329. 26.00 8,554.00 27.00 8,883.00 25.00 8,225.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 600. 22.00 13,200.00 20.00 12,000.00 28.00 16,800.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 3,000.00 6,000.00 4,765.00 9,530.00 1,350.00 2,700.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 280. 12.00 3,360.00 13.00 3,640.00 17.00 4,760.00 608.24 4" CONCRETE SIDEWALK (F) SY 10. 40.00 400.00 36.00 360.00 125.00 1,250.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 2. 300.00 600.00 460.00 920.00 300.00 600.00 14241 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.01 STRAIGHT GRANITE CURB LF 50. 17.00 850.00 20.00 1,000.00 18.00 900.00 609.5 RESET GRANITE CURB LF 2,150. 6.50 13,975.00 9.70 20,855.00 8.00 17,200.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 3,850. 6.50 25,025.00 3.30 12,705.00 4.00 15,400.00 614.79421 4" 2 - DUCT PVC CONDUIT (BRIDGE) (SUPPLIED BY OTHERS) LF 165. 6.00 990.00 5.20 858.00 5.00 825.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 600.00 600.00 620.00 620.00 700.00 700.00 616.606 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 6 FT EA 1. 200.00 200.00 210.00 210.00 300.00 300.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 500.00 1,500.00 520.00 1,560.00 600.00 1,800.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 89,000.00 89,000.00 89,000.00 89,000.00 89,000.00 89,000.00 618.7 FLAGGERS HR 1,100. 21.00 23,100.00 21.00 23,100.00 22.00 24,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 37,200.00 37,200.00 90,000.00 90,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 7,425.00 14,850.00 5,000.00 10,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 10. 500.00 5,000.00 235.00 2,350.00 125.00 1,250.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 20,000.00 20,000.00 16,150.00 16,150.00 9,000.00 9,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 85. 4.00 340.00 4.15 352.75 3.90 331.50 621.31 SINGLE DELINEATOR WITH POST EA 70. 32.00 2,240.00 33.00 2,310.00 31.00 2,170.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,250. 1.00 2,250.00 2.10 4,725.00 2.00 4,500.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 160. 2.00 320.00 2.10 336.00 4.00 640.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 62,200. .12 7,464.00 .15 9,330.00 .14 8,708.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 340. 1.00 340.00 1.05 357.00 1.05 357.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 140. 3.00 420.00 3.10 434.00 3.30 462.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 310. 5.00 1,550.00 5.15 1,596.50 5.50 1,705.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 130. 10.00 1,300.00 10.30 1,339.00 11.00 1,430.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 10,700. .75 8,025.00 .80 8,560.00 1.00 10,700.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 500. 2.50 1,250.00 1.60 800.00 1.65 825.00 645.531 SILT FENCE LF 950. 5.00 4,750.00 3.10 2,945.00 3.00 2,850.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 2,350. .75 1,762.50 .55 1,292.50 .65 1,527.50 647.1 HUMUS CY 260. 20.00 5,200.00 32.50 8,450.00 28.00 7,280.00 14241 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.002 DELIVERY OF SALVAGED STRUCTURES U 1. 2,500.00 2,500.00 1,255.00 1,255.00 2,750.00 2,750.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 7. 250.00 1,750.00 325.00 2,275.00 200.00 1,400.00 692. MOBILIZATION U 1. 156,000.00 156,000.00 134,000.00 134,000.00 150,000.00 150,000.00 697.11 INVASIVE SPECIES CONTROL PLAN U 1. 3,000.00 3,000.00 515.00 515.00 1,700.00 1,700.00 698.13 FIELD OFFICE TYPE C MON 8. 2,500.00 20,000.00 1,255.00 10,040.00 2,200.00 17,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 22,800.00 22,800.00 22,800.00 22,800.00 22,800.00 22,800.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 19,110.00 19,110.00 19,110.00 19,110.00 19,110.00 19,110.00 $2,308,715.70 $2,309,341.20 $2,344,807.58 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ROLLINSFORD, NH - SOUTH BERWICH, ME A000(248), 14241 COUNTIES AND CODES: STRAFFORD 017 YORK DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: PAVEMENT REHABILITATION AND BRIDGE REHABILITATION LOCATION: NH ROUTE 4 BRIDGE OVER THE SALMON FALLS RIVER COMPLETION DATE: OCTOBER 14, 2011 A CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,308,715.70 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,309,341.20 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,344,807.58 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,372,523.55 E BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,423,942.95 F TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,580,330.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,891,250.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.881 INVASIVE SPECIES CONTROL TYPE I SY 15. 50.00 750.00 10.00 150.00 75.00 1,125.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 15. 50.00 750.00 10.00 150.00 100.00 1,500.00 202.7 REMOVAL OF GUARDRAIL LF 6,700. 2.00 13,400.00 1.50 10,050.00 2.00 13,400.00 203.1 COMMON EXCAVATION CY 135. 15.00 2,025.00 12.00 1,620.00 22.00 2,970.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 16. 1,500.00 24,000.00 1,250.00 20,000.00 1,800.00 28,800.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 9. 1,500.00 13,500.00 1,250.00 11,250.00 2,000.00 18,000.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 1,250.00 3,750.00 950.00 2,850.00 1,500.00 4,500.00 203.5596 GUARDRAIL E-2 PLATFORM LF 329. 15.00 4,935.00 10.00 3,290.00 75.00 24,675.00 203.6 EMBANKMENT-IN-PLACE (F) CY 260. 15.00 3,900.00 14.00 3,640.00 29.00 7,540.00 206.1 COMMON STRUCTURE EXCAVATION CY 140. 10.00 1,400.00 30.00 4,200.00 22.00 3,080.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 42.00 840.00 65.00 1,300.00 206.2 ROCK STRUCTURE EXCAVATION CY 20. 60.00 1,200.00 50.00 1,000.00 190.00 3,800.00 14241 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.301 CRUSHED GRAVEL CY 229. 32.00 7,328.00 32.00 7,328.00 38.00 8,702.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 35.00 17,500.00 23.00 11,500.00 41.00 20,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 5. 35.00 175.00 28.00 140.00 100.00 500.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 70. 120.00 8,400.00 71.00 4,970.00 115.00 8,050.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,150. 65.00 269,750.00 70.00 290,500.00 65.00 269,750.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD (QC/QA TIER 2) (NIGHT TON 2,530. 65.00 164,450.00 70.00 177,100.00 65.00 164,450.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 425. 100.00 42,500.00 120.00 51,000.00 110.00 46,750.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 6,680. 2.00 13,360.00 1.00 6,680.00 2.00 13,360.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,600. .35 16,660.00 .25 11,900.00 .25 11,900.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 45. 250.00 11,250.00 140.00 6,300.00 245.00 11,025.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 50. 210.00 10,500.00 120.00 6,000.00 200.00 10,000.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 20. 210.00 4,200.00 120.00 2,400.00 200.00 4,000.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 32,900. 2.10 69,090.00 2.40 78,960.00 2.00 65,800.00 500.021 PREPARATION FOR FATIGUE CRACK INSPECTION - COVER PLATE U 28. 160.00 4,480.00 160.00 4,480.00 250.00 7,000.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 160,000.00 160,000.00 200,000.00 200,000.00 150,000.00 150,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 22. 20.00 440.00 20.00 440.00 57.00 1,254.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 10. 350.00 3,500.00 895.00 8,950.00 390.00 3,900.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 450.00 2,250.00 2,030.00 10,150.00 525.00 2,625.00 520.01 CONCRETE CLASS AA CY 22. 700.00 15,400.00 1,030.00 22,660.00 1,100.00 24,200.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 280. 760.00 212,800.00 750.00 210,000.00 700.00 196,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 52. 80.00 4,160.00 51.00 2,652.00 100.00 5,200.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 34. 25.00 850.00 38.60 1,312.40 40.00 1,360.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 777. 21.00 16,317.00 22.00 17,094.00 30.00 23,310.00 544. REINFORCING STEEL (F) LB 2,605. 1.20 3,126.00 4.40 11,462.00 1.20 3,126.00 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 38. 3.60 136.80 9.50 361.00 34.00 1,292.00 14241 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 62,799. 1.25 78,498.75 1.10 69,078.90 1.00 62,799.00 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 3,993. 4.00 15,972.00 3.90 15,572.70 39.00 155,727.00 547. SHEAR CONNECTORS (F) EA 1,372. 4.00 5,488.00 8.00 10,976.00 6.00 8,232.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 14. 1,600.00 22,400.00 1,280.00 17,920.00 1,000.00 14,000.00 550.1 STRUCTURAL STEEL (F) LB 4,070. 5.00 20,350.00 5.15 20,960.50 7.00 28,490.00 550.191 TEMPORARY GIRDER SUPPORT SYSTEM U 1. 40,000.00 40,000.00 34,000.00 34,000.00 65,000.00 65,000.00 560.101 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT (F) LF 105. 600.00 63,000.00 518.00 54,390.00 375.00 39,375.00 562.1 SILICONE JOINT SEALANT (F LF 37. 40.00 1,480.00 30.35 1,122.95 5.00 185.00 563.23 BRIDGE RAIL T3 (F) LF 280. 140.00 39,200.00 160.00 44,800.00 150.00 42,000.00 563.24 BRIDGE RAIL T4 (F) LF 219. 150.00 32,850.00 160.00 35,040.00 165.00 36,135.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 324. 220.00 71,280.00 200.00 64,800.00 110.00 35,640.00 565.2301 BRIDGE APPROACH RAIL T3 (FULL HEIGHT) LF 80. 165.00 13,200.00 150.00 12,000.00 150.00 12,000.00 565.2401 BRIDGE APPROACH RAIL T4 (FULL HEIGHT) LF 136. 185.00 25,160.00 160.00 21,760.00 175.00 23,800.00 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 425.00 2,125.00 600.00 3,000.00 1,000.00 5,000.00 585.3 STONE FILL, CLASS C CY 10. 45.00 450.00 45.00 450.00 50.00 500.00 603.11012 12" CORR. STEEL PIPE, .064" LF 120. 50.00 6,000.00 30.00 3,600.00 50.00 6,000.00 603.34112 12" STEEL END SECTIONS EA 3. 450.00 1,350.00 115.00 345.00 250.00 750.00 604.0007 POLYETHYLENE LINER EA 13. 250.00 3,250.00 125.00 1,625.00 750.00 9,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 15. 450.00 6,750.00 250.00 3,750.00 350.00 5,250.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 850. 30.00 25,500.00 28.00 23,800.00 40.00 34,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,450. 17.50 147,875.00 17.75 149,987.50 19.00 160,550.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 25. 2,100.00 52,500.00 1,745.00 43,625.00 1,900.00 47,500.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 3. 1,900.00 5,700.00 1,485.00 4,455.00 1,500.00 4,500.00 606.1296 BEAM GUARDRAIL (TERM. SEC TYPE E-2) (STEEL POST) LF 329. 27.50 9,047.50 28.00 9,212.00 30.00 9,870.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 600. 35.00 21,000.00 50.00 30,000.00 30.00 18,000.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 3,500.00 7,000.00 5,000.00 10,000.00 5,500.00 11,000.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 280. 25.00 7,000.00 22.00 6,160.00 23.00 6,440.00 608.24 4" CONCRETE SIDEWALK (F) SY 10. 60.00 600.00 120.00 1,200.00 160.00 1,600.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 2. 225.00 450.00 325.00 650.00 700.00 1,400.00 14241 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.01 STRAIGHT GRANITE CURB LF 50. 21.00 1,050.00 22.00 1,100.00 20.00 1,000.00 609.5 RESET GRANITE CURB LF 2,150. 9.00 19,350.00 12.00 25,800.00 6.00 12,900.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 3,850. 4.25 16,362.50 6.00 23,100.00 5.00 19,250.00 614.79421 4" 2 - DUCT PVC CONDUIT (BRIDGE) (SUPPLIED BY OTHERS) LF 165. 20.00 3,300.00 5.00 825.00 5.00 825.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 650.00 650.00 600.00 600.00 600.00 600.00 616.606 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 6 FT EA 1. 210.00 210.00 200.00 200.00 200.00 200.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 530.00 1,590.00 500.00 1,500.00 500.00 1,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 89,000.00 89,000.00 89,000.00 89,000.00 89,000.00 89,000.00 618.7 FLAGGERS HR 1,100. 21.00 23,100.00 23.00 25,300.00 25.00 27,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 75,000.00 75,000.00 115,000.00 115,000.00 18,000.00 18,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 12,500.00 25,000.00 5,000.00 10,000.00 10,000.00 20,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 10. 600.00 6,000.00 105.00 1,050.00 150.00 1,500.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 15,000.00 15,000.00 12,000.00 12,000.00 10,000.00 10,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 85. 5.00 425.00 4.00 340.00 4.00 340.00 621.31 SINGLE DELINEATOR WITH POST EA 70. 34.00 2,380.00 27.00 1,890.00 28.00 1,960.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,250. 2.00 4,500.00 1.25 2,812.50 4.00 9,000.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 160. 2.00 320.00 3.00 480.00 1.50 240.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 62,200. .15 9,330.00 .13 8,086.00 .15 9,330.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 340. .80 272.00 .75 255.00 1.00 340.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 140. 1.50 210.00 2.25 315.00 5.00 700.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 310. 2.25 697.50 1.45 449.50 8.00 2,480.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 130. 5.00 650.00 4.75 617.50 10.00 1,300.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 10,700. .35 3,745.00 .35 3,745.00 .50 5,350.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 500. 1.60 800.00 1.55 775.00 6.00 3,000.00 645.531 SILT FENCE LF 950. 3.00 2,850.00 2.75 2,612.50 3.00 2,850.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 2,350. .55 1,292.50 .50 1,175.00 3.00 7,050.00 647.1 HUMUS CY 260. 20.00 5,200.00 22.00 5,720.00 50.00 13,000.00 14241 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.002 DELIVERY OF SALVAGED STRUCTURES U 1. 2,500.00 2,500.00 3,000.00 3,000.00 7,500.00 7,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 7. 160.00 1,120.00 175.00 1,225.00 200.00 1,400.00 692. MOBILIZATION U 1. 100,000.00 100,000.00 70,000.00 70,000.00 195,568.00 195,568.00 697.11 INVASIVE SPECIES CONTROL PLAN U 1. 1,000.00 1,000.00 400.00 400.00 1,500.00 1,500.00 698.13 FIELD OFFICE TYPE C MON 8. 1,000.00 8,000.00 2,500.00 20,000.00 1,000.00 8,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 22,800.00 22,800.00 22,800.00 22,800.00 22,800.00 22,800.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 19,110.00 19,110.00 19,110.00 19,110.00 19,110.00 19,110.00 $2,372,523.55 $2,423,942.95 $2,580,330.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: ROLLINSFORD, NH - SOUTH BERWICH, ME A000(248), 14241 COUNTIES AND CODES: STRAFFORD 017 YORK DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: PAVEMENT REHABILITATION AND BRIDGE REHABILITATION LOCATION: NH ROUTE 4 BRIDGE OVER THE SALMON FALLS RIVER COMPLETION DATE: OCTOBER 14, 2011 A CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,308,715.70 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,309,341.20 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,344,807.58 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,372,523.55 E BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,423,942.95 F TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,580,330.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,891,250.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.881 INVASIVE SPECIES CONTROL TYPE I SY 15. 65.00 975.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 15. 110.00 1,650.00 202.7 REMOVAL OF GUARDRAIL LF 6,700. 6.50 43,550.00 203.1 COMMON EXCAVATION CY 135. 26.00 3,510.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 16. 2,500.00 40,000.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 9. 1,200.00 10,800.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 1,200.00 3,600.00 203.5596 GUARDRAIL E-2 PLATFORM LF 329. 20.00 6,580.00 203.6 EMBANKMENT-IN-PLACE (F) CY 260. 30.00 7,800.00 206.1 COMMON STRUCTURE EXCAVATION CY 140. 35.00 4,900.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 20. 200.00 4,000.00 14241 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.301 CRUSHED GRAVEL CY 229. 35.00 8,015.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 55.00 27,500.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 5. 40.00 200.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 70. 110.00 7,700.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,150. 68.00 282,200.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD (QC/QA TIER 2) (NIGHT TON 2,530. 68.00 172,040.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 425. 110.00 46,750.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 6,680. 1.40 9,352.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,600. .25 11,900.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 45. 160.00 7,200.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 50. 110.00 5,500.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 20. 160.00 3,200.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 32,900. 2.40 78,960.00 500.021 PREPARATION FOR FATIGUE CRACK INSPECTION - COVER PLATE U 28. 100.00 2,800.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 250,000.00 250,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 22. 35.00 770.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 10. 550.00 5,500.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 800.00 4,000.00 520.01 CONCRETE CLASS AA CY 22. 800.00 17,600.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 280. 750.00 210,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 52. 90.00 4,680.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 34. 20.00 680.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 777. 20.00 15,540.00 544. REINFORCING STEEL (F) LB 2,605. 5.00 13,025.00 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 38. 8.00 304.00 14241 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 62,799. 1.50 94,198.50 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 3,993. 4.00 15,972.00 547. SHEAR CONNECTORS (F) EA 1,372. 6.00 8,232.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 14. 5,000.00 70,000.00 550.1 STRUCTURAL STEEL (F) LB 4,070. 4.00 16,280.00 550.191 TEMPORARY GIRDER SUPPORT SYSTEM U 1. 40,000.00 40,000.00 560.101 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT (F) LF 105. 800.00 84,000.00 562.1 SILICONE JOINT SEALANT (F LF 37. 12.00 444.00 563.23 BRIDGE RAIL T3 (F) LF 280. 180.00 50,400.00 563.24 BRIDGE RAIL T4 (F) LF 219. 260.00 56,940.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 324. 200.00 64,800.00 565.2301 BRIDGE APPROACH RAIL T3 (FULL HEIGHT) LF 80. 300.00 24,000.00 565.2401 BRIDGE APPROACH RAIL T4 (FULL HEIGHT) LF 136. 350.00 47,600.00 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 90.00 450.00 585.3 STONE FILL, CLASS C CY 10. 90.00 900.00 603.11012 12" CORR. STEEL PIPE, .064" LF 120. 50.00 6,000.00 603.34112 12" STEEL END SECTIONS EA 3. 200.00 600.00 604.0007 POLYETHYLENE LINER EA 13. 180.00 2,340.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 15. 850.00 12,750.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 850. 40.00 34,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,450. 18.00 152,100.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 25. 1,500.00 37,500.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 3. 1,000.00 3,000.00 606.1296 BEAM GUARDRAIL (TERM. SEC TYPE E-2) (STEEL POST) LF 329. 25.00 8,225.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 600. 60.00 36,000.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 6,500.00 13,000.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 280. 15.00 4,200.00 608.24 4" CONCRETE SIDEWALK (F) SY 10. 825.00 8,250.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 2. 700.00 1,400.00 14241 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.01 STRAIGHT GRANITE CURB LF 50. 17.00 850.00 609.5 RESET GRANITE CURB LF 2,150. 5.50 11,825.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 3,850. 3.20 12,320.00 614.79421 4" 2 - DUCT PVC CONDUIT (BRIDGE) (SUPPLIED BY OTHERS) LF 165. 1.50 247.50 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 1,500.00 1,500.00 616.606 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 6 FT EA 1. 200.00 200.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 500.00 1,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 89,000.00 89,000.00 618.7 FLAGGERS HR 1,100. 22.00 24,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 35,000.00 35,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 7,000.00 14,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 10. 2,100.00 21,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 5,000.00 5,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 85. 15.00 1,275.00 621.31 SINGLE DELINEATOR WITH POST EA 70. 50.00 3,500.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,250. 3.00 6,750.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 160. 4.00 640.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 62,200. .20 12,440.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 340. .75 255.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 140. 1.45 203.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 310. 2.25 697.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 130. 4.75 617.50 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 10,700. .35 3,745.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 500. 5.00 2,500.00 645.531 SILT FENCE LF 950. 8.25 7,837.50 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 2,350. .50 1,175.00 647.1 HUMUS CY 260. 50.00 13,000.00 14241 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.002 DELIVERY OF SALVAGED STRUCTURES U 1. 6,000.00 6,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 7. 100.00 700.00 692. MOBILIZATION U 1. 275,000.00 275,000.00 697.11 INVASIVE SPECIES CONTROL PLAN U 1. 10,000.00 10,000.00 698.13 FIELD OFFICE TYPE C MON 8. 3,000.00 24,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 22,800.00 22,800.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 19,110.00 19,110.00 $2,891,250.50 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: ROLLINSFORD, NH - SOUTH BERWICH, ME A000(248), 14241 COUNTIES AND CODES: STRAFFORD 017 YORK DATE BIDS OPEN: MARCH 3, 2011 SCOPE OF WORK: PAVEMENT REHABILITATION AND BRIDGE REHABILITATION LOCATION: NH ROUTE 4 BRIDGE OVER THE SALMON FALLS RIVER COMPLETION DATE: OCTOBER 14, 2011 A CONTINENTAL PAVING INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,308,715.70 B GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,309,341.20 C PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,344,807.58 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,372,523.55 E BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 2,423,942.95 F TBUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,580,330.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,891,250.50 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.881 INVASIVE SPECIES CONTROL TYPE I SY 15. 50.00 750.00 4.50 67.50 682.50 201.882 INVASIVE SPECIES CONTROL TYPE II SY 15. 50.00 750.00 4.50 67.50 682.50 202.7 REMOVAL OF GUARDRAIL LF 6,700. 1.00 6,700.00 1.80 12,060.00 -5,360.00 203.1 COMMON EXCAVATION CY 135. 20.00 2,700.00 13.00 1,755.00 945.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 16. 1,250.00 20,000.00 1,100.00 17,600.00 2,400.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 9. 1,000.00 9,000.00 1,100.00 9,900.00 -900.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 1,000.00 3,000.00 950.00 2,850.00 150.00 203.5596 GUARDRAIL E-2 PLATFORM LF 329. 15.00 4,935.00 13.00 4,277.00 658.00 203.6 EMBANKMENT-IN-PLACE (F) CY 260. 10.00 2,600.00 5.00 1,300.00 1,300.00 206.1 COMMON STRUCTURE EXCAVATION CY 140. 25.00 3,500.00 15.00 2,100.00 1,400.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 23.00 460.00 540.00 14241 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 206.2 ROCK STRUCTURE EXCAVATION CY 20. 75.00 1,500.00 60.00 1,200.00 300.00 304.301 CRUSHED GRAVEL CY 229. 32.00 7,328.00 30.00 6,870.00 458.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 20.00 10,000.00 20.00 10,000.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 5. 35.00 175.00 25.00 125.00 50.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 70. 65.00 4,550.00 90.00 6,300.00 -1,750.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,150. 65.00 269,750.00 70.00 290,500.00 -20,750.00 403.11092 HOT BITUMINOUS PAVEMENT MACHINE METHOD (QC/QA TIER 2) (NIGHT TON 2,530. 65.00 164,450.00 69.00 174,570.00 -10,120.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 425. 125.00 53,125.00 130.00 55,250.00 -2,125.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 6,680. 1.00 6,680.00 1.25 8,350.00 -1,670.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,600. .24 11,424.00 .35 16,660.00 -5,236.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 45. 150.00 6,750.00 120.00 5,400.00 1,350.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 50. 75.00 3,750.00 90.00 4,500.00 -750.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 20. 75.00 1,500.00 72.00 1,440.00 60.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 32,900. 1.75 57,575.00 2.25 74,025.00 -16,450.00 500.021 PREPARATION FOR FATIGUE CRACK INSPECTION - COVER PLATE U 28. 100.00 2,800.00 200.00 5,600.00 -2,800.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 162,000.00 162,000.00 115,000.00 115,000.00 47,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 22. 50.00 1,100.00 25.00 550.00 550.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 10. 930.00 9,300.00 400.00 4,000.00 5,300.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 930.00 4,650.00 800.00 4,000.00 650.00 520.01 CONCRETE CLASS AA CY 22. 1,080.00 23,760.00 1,000.00 22,000.00 1,760.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 280. 860.00 240,800.00 750.00 210,000.00 30,800.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 52. 30.00 1,560.00 75.00 3,900.00 -2,340.00 538.2 BARRIER MEMBRANE, PEEL AN STICK - VERTICAL SURFACE (F) SY 34. 27.00 918.00 25.00 850.00 68.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 777. 23.00 17,871.00 20.00 15,540.00 2,331.00 544. REINFORCING STEEL (F) LB 2,605. 3.00 7,815.00 1.00 2,605.00 5,210.00 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 38. 8.20 311.60 2.00 76.00 235.60 14241 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 62,799. 1.20 75,358.80 1.00 62,799.00 12,559.80 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 3,993. 4.50 17,968.50 2.50 9,982.50 7,986.00 547. SHEAR CONNECTORS (F) EA 1,372. 4.40 6,036.80 4.00 5,488.00 548.80 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 14. 2,100.00 29,400.00 1,800.00 25,200.00 4,200.00 550.1 STRUCTURAL STEEL (F) LB 4,070. 8.00 32,560.00 5.00 20,350.00 12,210.00 550.191 TEMPORARY GIRDER SUPPORT SYSTEM U 1. 16,000.00 16,000.00 20,000.00 20,000.00 -4,000.00 560.101 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT (F) LF 105. 700.00 73,500.00 700.00 73,500.00 562.1 SILICONE JOINT SEALANT (F LF 37. 10.00 370.00 20.00 740.00 -370.00 563.23 BRIDGE RAIL T3 (F) LF 280. 135.00 37,800.00 120.00 33,600.00 4,200.00 563.24 BRIDGE RAIL T4 (F) LF 219. 145.00 31,755.00 150.00 32,850.00 -1,095.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 324. 74.00 23,976.00 80.00 25,920.00 -1,944.00 565.2301 BRIDGE APPROACH RAIL T3 (FULL HEIGHT) LF 80. 160.00 12,800.00 120.00 9,600.00 3,200.00 565.2401 BRIDGE APPROACH RAIL T4 (FULL HEIGHT) LF 136. 180.00 24,480.00 150.00 20,400.00 4,080.00 570.4 MORTAR RUBBLE MASONRY (F) CY 5. 17.00 85.00 425.00 2,125.00 -2,040.00 585.3 STONE FILL, CLASS C CY 10. 25.00 250.00 40.00 400.00 -150.00 603.11012 12" CORR. STEEL PIPE, .064" LF 120. 45.00 5,400.00 37.00 4,440.00 960.00 603.34112 12" STEEL END SECTIONS EA 3. 250.00 750.00 145.00 435.00 315.00 604.0007 POLYETHYLENE LINER EA 13. 115.00 1,495.00 150.00 1,950.00 -455.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 15. 350.00 5,250.00 300.00 4,500.00 750.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 850. 15.00 12,750.00 19.00 16,150.00 -3,400.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,450. 16.95 143,227.50 16.50 139,425.00 3,802.50 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 25. 2,000.00 50,000.00 2,100.00 52,500.00 -2,500.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 3. 1,800.00 5,400.00 2,000.00 6,000.00 -600.00 606.1296 BEAM GUARDRAIL (TERM. SEC TYPE E-2) (STEEL POST) LF 329. 26.00 8,554.00 26.00 8,554.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 600. 22.00 13,200.00 25.00 15,000.00 -1,800.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 3,000.00 6,000.00 4,000.00 8,000.00 -2,000.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 280. 12.00 3,360.00 15.00 4,200.00 -840.00 608.24 4" CONCRETE SIDEWALK (F) SY 10. 40.00 400.00 40.00 400.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 2. 300.00 600.00 300.00 600.00 609.01 STRAIGHT GRANITE CURB LF 50. 17.00 850.00 16.00 800.00 50.00 14241 PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 609.5 RESET GRANITE CURB LF 2,150. 6.50 13,975.00 7.50 16,125.00 -2,150.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 3,850. 6.50 25,025.00 3.80 14,630.00 10,395.00 614.79421 4" 2 - DUCT PVC CONDUIT (BRIDGE) (SUPPLIED BY OTHERS) LF 165. 6.00 990.00 16.10 2,656.50 -1,666.50 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 600.00 600.00 4,000.00 4,000.00 -3,400.00 616.606 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 6 FT EA 1. 200.00 200.00 310.00 310.00 -110.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 3. 500.00 1,500.00 560.00 1,680.00 -180.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 89,000.00 89,000.00 89,000.00 89,000.00 618.7 FLAGGERS HR 1,100. 21.00 23,100.00 25.00 27,500.00 -4,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 40,000.00 40,000.00 120,000.00 120,000.00 -80,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 8,000.00 16,000.00 -10,000.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN (UNIT WEEK) UWK 10. 500.00 5,000.00 110.00 1,100.00 3,900.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 20,000.00 20,000.00 25,000.00 25,000.00 -5,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 85. 4.00 340.00 5.00 425.00 -85.00 621.31 SINGLE DELINEATOR WITH POST EA 70. 32.00 2,240.00 31.00 2,170.00 70.00 628.2 SAWED BITUMINOUS PAVEMENT LF 2,250. 1.00 2,250.00 1.25 2,812.50 -562.50 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 160. 2.00 320.00 3.00 480.00 -160.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 62,200. .12 7,464.00 .11 6,842.00 622.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 340. 1.00 340.00 .45 153.00 187.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 140. 3.00 420.00 3.00 420.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 310. 5.00 1,550.00 2.35 728.50 821.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 130. 10.00 1,300.00 4.00 520.00 780.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 10,700. .75 8,025.00 .60 6,420.00 1,605.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 500. 2.50 1,250.00 1.50 750.00 500.00 645.531 SILT FENCE LF 950. 5.00 4,750.00 3.25 3,087.50 1,662.50 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 2,350. .75 1,762.50 .60 1,410.00 352.50 647.1 HUMUS CY 260. 20.00 5,200.00 20.00 5,200.00 670.002 DELIVERY OF SALVAGED STRUCTURES U 1. 2,500.00 2,500.00 1,000.00 1,000.00 1,500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 7. 250.00 1,750.00 200.00 1,400.00 350.00 14241 PAGE 5 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 692. MOBILIZATION U 1. 156,000.00 156,000.00 120,000.00 120,000.00 36,000.00 697.11 INVASIVE SPECIES CONTROL PLAN U 1. 3,000.00 3,000.00 1,000.00 1,000.00 2,000.00 698.13 FIELD OFFICE TYPE C MON 8. 2,500.00 20,000.00 1,800.00 14,400.00 5,600.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 22,800.00 22,800.00 22,800.00 22,800.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 19,110.00 19,110.00 19,110.00 19,110.00 $2,308,715.70 $2,281,786.50 26,929.20