| Project Name | State Project Number |
Federal Project Number |
Bid Open | Scope of Work |
|---|---|---|---|---|
| Alton | 14121-A | X-A000(500) | 9/23/2010 | NH 11/ NH 28, Intersection reconstruction |
| Bedford-Manchester-Londonderry-Merrimack | 11512-K | A000(391) | 5/27/2010 | Airport Access Road, construct select material, signing and paving |
| Bethlehem | 15664 | X-A000(860) | 6/10/2010 | Replace deteriorated box culvert under US 302 |
| Bethlehem-Carroll (Option Bid) | 16105 | X-A001(133) | 12/9/2010 | Pavement rehabilitation on US 3/US 302 |
| Bethlehem-Carroll | 16105-A | X-A001(155) | 12/9/2010 | Pavement rehabilitation on US 3/US 302 |
| Boscawen | 15621 | X-A000(828) | 10/7/2010 | Safety improvements @ intersection of Harris Hill Road and US 4 |
| Charlestown-Hillsborough | 14567-O | 5/13/2010 | NH 12 & NH 9, Construct new vehicle fueling facilities | |
| Concord-New London | 15889 | X-A000(020) | 5/13/2010 | I-89, Replace signs @ various exits |
| Conway | 15745 | X-A000(940) | 2/11/2010 | US 302, bridge deck preservation on the Saco River bridge |
| Conway | 15662 | 10/21/2010 | NH 16, Provide emergency stabilization of failed slope | |
| Dixville-Millsfield | 15605 | X-A000(810) | 6/3/2010 | NH 26, roadway and pavement rehabilitation |
| Dover-Milton | 15758 | 3/3/2010 | Resurfacing Eastern & Spaulding Turnpike | |
| Dover-Rochester | 15582 | 7/1/2010 | Culvert replacement, NH Route 16/Spaulding Turnpike | |
| Dover, NH-South Berwick, ME | 15870 | X-A001(013) | 9/30/2010 | Gulf Road, pile repair/encapsulation over Salmon River |
| Dummer | 15805 | X-A000(969) | 7/22/2010 | Slope stabilization on NH 16 |
| Enfield | 12967 | BR0-X-T-0145(003) | 10/21/2010 | Main Street & NH 4A, Bridge replacement over Mascoma Lake |
| Epsom | 15266 | X-A000(668) | 2/4/2010 | Remove and replace the NH Route 107 bridge over Griffin Brook |
| Greenland | 15618 | X-A000(825) | 1/7/2010 | NH 33, Safety improvements @ intersection of Winnicut Road |
| Hampstead | 15606 | X-A000(811) | 4/20/2010 | NH 111, Pavement rehabilitation from NH 121 to NH 121A |
| Hampstead | 15655 | X-A000(850) | 4/22/2010 | Replace box culvert on Hog Hill Road under NH Route 121 |
| Hampstead-Atkinson | 15663 | X-A000(859) | 10/7/2010 | Safety improvements @ intersection of West Road and Island Pond Road |
| Hampton-North Hampton | 15678-D | 7/22/2010 | Improvements to existing hampton toll plaza & facility | |
| Harts Location-Conway | 13855-A | X-A000(835) | 6/3/2010 | US 302/NH 16, upgrade guardrail and terminals |
| Harts Location | 15315 | 6/10/2010 | US 302, repair 325 feet of eroded roadway embankment | |
| Hillsborough | 15994 | X-A000(068) | 6/24/2010 | US 202/ NH 0, resurfacing beginning west of NH 31 |
| Hopkinton | 15658 | X-A000(856) | 2/11/2010 | NH 127, Maintenance repainting over Spillway Channel |
| Lebanon | 15702 | X-A000(894) | 5/20/2010 | Guardrail replacement on I-89 |
| Lee-Durham | 14461 | X-A000(397) | 12/9/2010 | Pavement & bridge rehabilitation on US 4 |
| Lincoln-Franconia | 15603 | A000(808) | 9/30/2010 | I-93, pavement rehabilitation, guradrail and drainage work |
| Littleton-Bethlehem | 15744 | X-A000(939) | 6/24/2010 | NH 116, resurfacing and guardrail upgrade |
| Lyme | 15289-B | 6/17/2010 | Reclaiming & paving North Thetford Road | |
| Lyme | 15695 | X-A000(887) | 12/16/2010 | NH 10 & Thetford Road, intersection safety improvements |
| Manchester-Hooksett | 15849 | 4/8/2010 | I-293, replace median box beam barrier with concrete barriers | |
| Manchester-Hooksettt | 14604 | A000(461) | 6/3/2010 | I-93, NB/SB bridge deck replacement over the Merrimack River |
| Milford | 15743 | X-A000(938) | 3/4/2010 | NH 101, Pavement & bridge rehabilitation |
| Milton | 15905 | X-A001(027) | 10/13/2010 | NH 125, Bridge rehab/deck replacement over RR |
| Nashua-Hudson | 15759 | 2/25/2010 | Roadway resurfacing of the Central Turnpike | |
| Newbury-Bradford | 15943 | 3/18/2010 | NH 103, Resurfacing (micro-surfacing or latex) | |
| New Castle-Portsmouth | 15916 | X-A001(037) | 10/19/2010 | NH 1B, bridge painting & bridge rehabilitation |
| Newington-Dover | 11238-L | A000(999) | 6/17/2010 | NH 16/US 4/Spaulding Tpk, Construct Little Bay bridge(OPTION BID-Steel or concrete) |
| North Haverhill | SBG-33-04-10 | 12/1/2010 | Pavement maintenance @ Dean Memorial airport | |
| Pembroke-Concord | 16065 | 7/22/2010 | NH 106, resurfacing from US 3 in Pembroke north to Autumn Drive in Concord | |
| Plaistow-Kingston | 10044-F | X-A000(379) | 9/9/2010 | NH 125, Reconstruct intersections of Danville Road and Jesse George Road |
| Plymouth-Lincoln | 16079 | X-A001(121) | 10/19/2010 | I-93, Replace sign structure |
| Plymouth | 15882 | X-A001(010) | 10/25/2010 | NH 25/NH 3A, rehabilitate bridge over Baker River |
| Portsmouth | 14523 | 3/25/2010 | Rehabilitation of the existing bridge carrying Sherburne Road over I-95 | |
| Portsmouth | 13864 | 3/25/2010 | Painting 2 overpass bridges on the I-95/Spaulding Turnpike | |
| Portsmouth | 15892 | 12/9/2010 | I-95, Replace aluminum sign structures | |
| Resurfacing District 1 | 15871 | 1/14/2010 | Counties of Coos & Grafton | |
| Resurfacing District 2 | 15872 | 1/14/2010 | Counties of Merrimack & Sullivan | |
| 15909 | A001(031) | 1/14/2010 | Counties of Coos, Carroll, Grafton, Merrimack & Sullivan | |
| Resurfacing District 3 | 15873 | 1/12/2010 | Counties of Grafton, Belknap & Carroll | |
| 15874 | A001(014) | 1/12/2010 | Counties of Cheshire, Hillsboro & Sullivan | |
| 15875 | A001(015) | 1/7/2010 | Counties of Hillsboro, Merrimack & Rockingham | |
| 15876 | A001(016) | 1/7/2010 | Counties of Strafford & Rockingham | |
| Rochester | 10620-L | 4/8/2010 | Spaulding Turnpike Expansion from Exit 14, including bridge, to Exit 15 | |
| Rochester | 10620-J | 10/13/2010 | Spaulding Turnpike, Construction of 2nd barrel through Exit 16 | |
| Salem-Manchester NOTE: Low bidder withdrew his bid and this contract has been awarded to the B bidder | 13933-F | A000(126) | 5/20/2010 | Replace bridge on Brookdale Road over I-93 |
| Salem-Manchester | 13933-D | BI-A000(124) | 11/18/2010 | I-93 mainline Exit 1 to Sta 1130 & NH 38 (salem), including bridges |
| Statewide | 15941 | 3/18/2010 | Chip sealing of various routes | |
| Statewide | 15939 | 4/15/2010 | Install mile markers on various highways | |
| Statewide | 15750 | X-A000(945) | 5/6/2010 | Crack seal state number roads included in the 2005 FRP |
| Statewide | 15709 | 5/20/2010 | Guardrail replacement in Turnpike sys | |
| Statewide | 16043 | X-A001(104) | 8/5/2010 | Install rumble strips along various state routes |
| Statewide | 15884 | X-A001(018) | 9/2/2010 | Installation of warning signs and delineation |
| Statewide | 16080 | X-A001(123) | 10/21/2010 | NH 119, Replacement of substandard cable guardrail |
| Thornton | 15906 | X-A001(028) | 10/14/2010 | Rehabilitation of the bridge carrying Cross Road over the Pemigewasset River between US 3 and NH 175 |
| Wakefield | 14087-A | X-A000(053) | 6/24/2010 | NH 16, rehabilitate pavement and restriping |
| Warner | 15963 | X-A001(052) | 10/19/2010 | NH 103, Bridge rehabilitation over Stevens Brook |
| Winchester | 15881 | X-A001(009) | 10/14/2010 | Rehabilitation of NH Route 119 bridge over the Ashuelot River |
| Woodstock | 15885 | X-A001(019) | 4/29/2010 | Rehabiltate three bridges on NH Route 175 over the Pemigewasset River |
| 2010 PUBLIC WORKS PROJECT BID RESULTS | ||||
| Project Name | State Project Number |
Federal Project Number |
Bid Open | Scope of Work |
| Benton | 80501-B | 3/11/2010 | Replace fire alarm system @ Glencliff Home | |
| Benton | 80407A | 8/19/2010 | Water damage repairs, Glencliff Home | |
| 20009R-C | 12/30/2010 | Glencliff wood chip facility and hydrowheel upgrades | ||
| 20004R-B | 3/24/2010 | NH Army National Guard Training site renovations | ||
| 80330-B | 4/15/2010 | Training site wastewater & water systems improvements for NH Army National Guard | ||
| 80471A_BIDTAB | 80471-A | 1/21/2010 | Multiphase redevelopment project @ Hampton Beach State Park | |
| Concord | 80457A | 2/28/2010 | NH State prison RTU phase I-B, electroinic/security upgrades | |
| 20002R-B | 4/7/2010 | Renovations to Army National Guard | ||
| Concord | 80478-G | 4/8/2010 | Brown building & parking garage lighting and lighting control modifications, 129 Pleasant St | |
| Concord | 80381R-C | 4/20/2010 | Construct fence @ State Military Reservation | |
| Concord | 80492-B | 4/28/2010 | Mechanical modifications @ 3 locations | |
| Concord | 80533R-B | 4/29/2010 | Site/fence improvements at the State Military Reservation | |
| Concord | 80484-B | 5/5/2010 | Cafeterial renovations @ State House | |
| Concord | 80504R-B | 5/12/2010 | Install emergency generators @ Police Standards & Training | |
| Concord | 80466-B | 5/12/2010 | Parking garage repairs on Storrs St | |
| Concord | 80495-A | 6/2/2010 | Design/Build sprinkler system @ men's prison | |
| Concord | 80478-I | 6/10/2010 | Lighting controls retrofit @ Walker Building, 17 South Fruit Street | |
| Concord | 80393-D | 6/24/2010 | Design/Build remove & replace rooftop unit | |
| Concord | 80358C | 6/30/2010 | South wall reconstrution, State Prison | |
| Concord | 80511-A | 7/8/2010 | Parking lot & ADA improvements @ Supreme Court | |
| Concord | 80523R-A | 7/29/2010 | Electrical renovations Buildings D and E, National Guard | |
| Concord | 80540R-B | 7/29/2010 | Roof replacement building H, National Guard | |
| Concord | 80546R-B | 7/29/2010 | HVAC improvements Building G, National Guard | |
| Concord | 80516-B | 8/5/2010 | Stair repair & miscellaneous renovations at the LOB | |
| Concord | 80552R-B | 8/26/2010 | Drainage repairs @ various sites | |
| Concord | 80505-B | 9/2/2010 | Firing range renovations, 17 Institute Drive | |
| Concord | 80478-L | 9/9/2010 | LED lighting retrofit on Hazen Drive | |
| Concord | 80534-D | 9/9/2010 | Design/Build rennovations to Graphic Services Bldg, 12 Hills Avenue | |
| Concord | 80507-B | 10/6/2010 | Ciller upgrade improvements @ 29 Hazen Drive | |
| Concord | 80509-A | 12/1/2010 | Kitchen hood fire suppression @ 3 locations | |
| Concord | 80508-B | 12/20/2010 | Renovations to the state library | |
| Concord | 80478M | 12/30/2010 | Upgrades for energy conservation for the NH Supreme Court & the John O. Morton Building | |
| Hampton | 80479-A | 2/11/2010 | North Beach seawall repairs | |
| Franconia | 80473R-B | 5/12/2010 | Design and construction of a double chair ski lift | |
| Manchester | 80475-D | 3/3/2010 | Renovations to the Hillsborough County Courthouse | |
| Nashua | 80453R-B | 4/14/2010 | Construct Nashua bus facility | |
| Nashua | 80467R-B | 6/24/2010 | Design/Build Liquor store #69 | |
| Nashua | 80514B | 10/14/2010 | DMV EZ Pass offices | |
| North Conway | 80486-B | 10/25/2010 | Roof replacement @ the Carroll County courthouse | |
| Portsmouth | 80435-A | 6/2/2010 | Door replacement @ transportation center | |
| Statewide | 80478-C | 2/25/2010 | Lighting retrofit for various state facilities in District 5 | |
| Statewide | 80478-D | 2/25/2010 | Lighting retrofit for various state facilities in District 1 | |
| 20005R-B | 3/4/2010 | Install gas-fired boilers & pumps | ||
| 20006R-B | 3/18/2010 | Windor removal/replacement inc. insulation | ||
| 20003R-B | 4/1/2010 | Renovations at three National Guard Armories | ||
| Statewide | 80468-A | 4/7/2010 | Roof replacements | |
| 20010R-B | 6/30/2010 | Windows/insulation phase 2 | ||
| Statewide | 80478-K | 8/12/2010 | Lighting retrofit @ various state facilities in districts 2, 3 & 4 | |
| 20005R-C | 9/16/2010 | Upgrade HVAC controls | ||
| Statewide | 80547R-B | 9/23/2010 | Mountain Top communication sites upgrade | |