THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: THORNTON X-A001(028), 15906 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 14, 2010 SCOPE OF WORK: BRIDGE REHABILITATION LOCATION: BRIDGE NO. 175/076 CARRYING CROSS ROAD OVER THE PEMIGEWASSET RIVER BETWEEN US 3 AND NH 175 COMPLETION DATE: AUGUST 24, 2012 A WINTERSET, INC. PO BOX 968, 128 WINTERSET DRIVE, LYNDONVILLE, VT $ 1,988,888.76 B BECK & BELLUCCI, INC. PO BOX 429, FRANKLIN, NH 03235 $ 2,002,622.10 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,013,377.75 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,199,524.96 E ALVIN J. COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,338,067.40 F GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,417,664.29 G CPM CONSTRUCTORS O/ BONNEY ST., PO BOX B, FREEPORT, ME 04032 $ 2,426,085.25 H E.D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 2,560,080.00 I TBUCK CONSTRUCTION INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,614,830.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 145. 2.50 362.50 3.50 507.50 2.50 362.50 202.7 REMOVAL OF GUARDRAIL (F) LF 1,390. 1.50 2,085.00 1.55 2,154.50 1.65 2,293.50 203.1 COMMON EXCAVATION CY 20. 45.00 900.00 25.75 515.00 10.00 200.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 900.00 1,800.00 1,545.00 3,090.00 1,500.00 3,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 37. 22.00 814.00 20.60 762.20 12.00 444.00 206.1 COMMON STRUCTURE EXCAVATION CY 8. 100.00 800.00 36.05 288.40 20.00 160.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 8. 47.00 376.00 56.65 453.20 50.00 400.00 304.1 SAND (F) CY 14. 31.00 434.00 25.75 360.50 25.00 350.00 304.2 GRAVEL (F) CY 14. 31.00 434.00 36.05 504.70 30.00 420.00 304.3 CRUSHED GRAVEL (F) CY 20. 28.00 560.00 41.20 824.00 35.00 700.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 350. 75.00 26,250.00 75.00 26,250.00 75.00 26,250.00 15906 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 120.00 600.00 118.50 592.50 120.00 600.00 403.6 PAVEMENT JOINT ADHESIVE LF 360. 5.25 1,890.00 5.15 1,854.00 5.50 1,980.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 88. 120.00 10,560.00 118.50 10,428.00 120.00 10,560.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,240. 7.75 9,610.00 7.75 9,610.00 8.00 9,920.00 500.032 PREPORATION FOR FATIGUE CRACK INSPECTION - WITH LEAD PAINT POLL CONTROL U 176. 52.00 9,152.00 58.00 10,208.00 55.00 9,680.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 187,000.00 187,000.00 273,750.00 273,750.00 280,000.00 280,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 60. 54.00 3,240.00 36.05 2,163.00 10.00 600.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 5. 300.00 1,500.00 250.00 1,250.00 300.00 1,500.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 650.00 3,250.00 650.00 3,250.00 450.00 2,250.00 520.01 CONCRETE CLASS AA CY 20. 1,785.00 35,700.00 1,000.00 20,000.00 900.00 18,000.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 44. 580.00 25,520.00 350.00 15,400.00 300.00 13,200.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 456. 655.00 298,680.00 775.00 353,400.00 750.00 342,000.00 526.2 EPOXY FOR NON-MOVING CRACKS LF 15. 30.00 450.00 90.00 1,350.00 50.00 750.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 70. 48.00 3,360.00 55.00 3,850.00 100.00 7,000.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 1,503. 16.00 24,048.00 15.75 23,672.25 16.50 24,799.50 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 62. 8.00 496.00 7.00 434.00 5.00 310.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 169,852. .98 166,454.96 1.02 173,249.04 1.00 169,852.00 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 12,634. 2.70 34,111.80 2.34 29,563.56 3.50 44,219.00 544.7 SYNTHETIC FIBER REINFORCMENT LB 308. 6.00 1,848.00 6.00 1,848.00 7.50 2,310.00 547. SHEAR CONNECTORS (F) EA 4,125. 4.50 18,562.50 5.22 21,532.50 3.75 15,468.75 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 2,200.00 22,000.00 2,013.00 20,130.00 2,650.00 26,500.00 550.1 STRUCTURAL STEEL (F) LB 3,300. 5.00 16,500.00 5.86 19,338.00 7.00 23,100.00 556.101 PAINTING EXISTING STRUCTURAL STEEL U 1. 310,000.00 310,000.00 314,665.00 314,665.00 320,000.00 320,000.00 556.201 CONTAINMENT & ENVIRONMENTAL PROTECTION U 1. 135,000.00 135,000.00 133,900.00 133,900.00 130,000.00 130,000.00 15906 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 556.301 WORKER PROTECTION U 1. 10,500.00 10,500.00 10,300.00 10,300.00 10,500.00 10,500.00 556.401 WASTE MANAGEMENT U 1. 2,600.00 2,600.00 2,575.00 2,575.00 2,650.00 2,650.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 72. 638.00 45,936.00 554.00 39,888.00 600.00 43,200.00 563.23 BRIDGE RAIL T3 (F) LF 850. 125.00 106,250.00 122.50 104,125.00 125.00 106,250.00 565.232 BRIDGE APPROACH RAIL T3 (STEEL POST) U 4. 5,000.00 20,000.00 4,930.00 19,720.00 5,000.00 20,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 31. 50.00 1,550.00 51.50 1,596.50 35.00 1,085.00 585.3 STONE FILL, CLASS C CY 8. 60.00 480.00 51.50 412.00 40.00 320.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 35. 8.00 280.00 2.25 78.75 2.50 87.50 603.30112 12" R.C. END SECTIONS EA 4. 450.00 1,800.00 475.00 1,900.00 250.00 1,000.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 165. 18.00 2,970.00 41.20 6,798.00 25.00 4,125.00 604.0007 POLYETHYLENE LINER EA 4. 160.00 640.00 226.00 904.00 200.00 800.00 604.12 CATCH BASINS TYPE B U 4. 1,900.00 7,600.00 2,265.00 9,060.00 1,500.00 6,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,335. 16.00 21,360.00 16.33 21,800.55 16.25 21,693.75 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 1,900.00 3,800.00 1,900.00 3,800.00 1,950.00 3,900.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 575.00 1,150.00 566.00 1,132.00 575.00 1,150.00 606.4175 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL ANCHORED LF 420. 57.00 23,940.00 36.00 15,120.00 35.00 14,700.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 400. 19.00 7,600.00 16.00 6,400.00 25.00 10,000.00 609.01 STRAIGHT GRANITE CURB LF 155. 25.00 3,875.00 25.75 3,991.25 20.00 3,100.00 615.03 TRAFFIC SIGN TYPE C (F) SF 48. 50.00 2,400.00 51.00 2,448.00 50.00 2,400.00 616.171 PORTABLE TRAFFIC SIGNALS (PTS) SYSTEM-TEMPORARY U 1. 36,000.00 36,000.00 18,375.00 18,375.00 20,000.00 20,000.00 618.7 FLAGGERS HR 2,100. 36.00 75,600.00 10.00 21,000.00 21.00 44,100.00 619.1 MAINTENANCE OF TRAFFIC U 1. 7,000.00 7,000.00 10,000.00 10,000.00 25,000.00 25,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 330.00 3,960.00 500.00 6,000.00 500.00 6,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 18. 4.00 72.00 4.15 74.70 4.50 81.00 621.31 SINGLE DELINEATOR WITH POST EA 4. 33.00 132.00 33.00 132.00 35.00 140.00 622.1 STEEL WITNESS MARKERS EA 4. 26.00 104.00 25.75 103.00 25.00 100.00 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 80. 47.00 3,760.00 48.00 3,840.00 50.00 4,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 285. 1.50 427.50 2.00 570.00 2.00 570.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 3,100. .26 806.00 .26 806.00 .25 775.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 25. 3.10 77.50 3.10 77.50 3.25 81.25 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 75. 5.25 393.75 5.20 390.00 5.50 412.50 15906 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 125. 7.25 906.25 7.25 906.25 7.50 937.50 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 50. 2.00 100.00 8.25 412.50 7.00 350.00 645.531 SILT FENCE LF 830. 2.00 1,660.00 1.10 913.00 2.50 2,075.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .5 2,000.00 1,000.00 5,000.00 2,500.00 2,650.00 1,325.00 647.1 HUMUS CY 27. 30.00 810.00 15.75 425.25 20.00 540.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 14,000.00 14,000.00 3,500.00 3,500.00 5,750.00 5,750.00 692. MOBILIZATION U 1. 120,000.00 120,000.00 94,000.00 94,000.00 50,000.00 50,000.00 698.13 FIELD OFFICE TYPE C MON 24. 750.00 18,000.00 850.00 20,400.00 1,000.00 24,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 $1,988,888.76 $2,002,622.10 $2,013,377.75 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: THORNTON X-A001(028), 15906 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 14, 2010 SCOPE OF WORK: BRIDGE REHABILITATION LOCATION: BRIDGE NO. 175/076 CARRYING CROSS ROAD OVER THE PEMIGEWASSET RIVER BETWEEN US 3 AND NH 175 COMPLETION DATE: AUGUST 24, 2012 A WINTERSET, INC. PO BOX 968, 128 WINTERSET DRIVE, LYNDONVILLE, VT $ 1,988,888.76 B BECK & BELLUCCI, INC. PO BOX 429, FRANKLIN, NH 03235 $ 2,002,622.10 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,013,377.75 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,199,524.96 E ALVIN J. COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,338,067.40 F GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,417,664.29 G CPM CONSTRUCTORS O/ BONNEY ST., PO BOX B, FREEPORT, ME 04032 $ 2,426,085.25 H E.D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 2,560,080.00 I TBUCK CONSTRUCTION INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,614,830.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 145. 5.00 725.00 2.00 290.00 7.00 1,015.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,390. 1.50 2,085.00 1.50 2,085.00 1.65 2,293.50 203.1 COMMON EXCAVATION CY 20. 25.00 500.00 40.00 800.00 27.00 540.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 2,000.00 4,000.00 1,000.00 2,000.00 1,600.00 3,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 37. 40.00 1,480.00 40.00 1,480.00 55.00 2,035.00 206.1 COMMON STRUCTURE EXCAVATION CY 8. 50.00 400.00 35.00 280.00 38.00 304.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 8. 60.00 480.00 40.00 320.00 44.00 352.00 304.1 SAND (F) CY 14. 30.00 420.00 32.00 448.00 44.00 616.00 304.2 GRAVEL (F) CY 14. 32.00 448.00 32.00 448.00 44.00 616.00 304.3 CRUSHED GRAVEL (F) CY 20. 40.00 800.00 35.00 700.00 44.00 880.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 350. 72.50 25,375.00 72.00 25,200.00 137.00 47,950.00 15906 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 115.00 575.00 120.00 600.00 275.00 1,375.00 403.6 PAVEMENT JOINT ADHESIVE LF 360. 5.00 1,800.00 5.00 1,800.00 5.50 1,980.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 88. 115.00 10,120.00 121.00 10,648.00 198.00 17,424.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,240. 4.00 4,960.00 6.00 7,440.00 8.25 10,230.00 500.032 PREPORATION FOR FATIGUE CRACK INSPECTION - WITH LEAD PAINT POLL CONTROL U 176. 50.00 8,800.00 60.00 10,560.00 55.00 9,680.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 270,000.00 270,000.00 340,000.00 340,000.00 371,000.00 371,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 60. 35.00 2,100.00 40.00 2,400.00 17.00 1,020.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 5. 600.00 3,000.00 750.00 3,750.00 1,000.00 5,000.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 850.00 4,250.00 950.00 4,750.00 1,500.00 7,500.00 520.01 CONCRETE CLASS AA CY 20. 2,700.00 54,000.00 1,600.00 32,000.00 1,650.00 33,000.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 44. 550.00 24,200.00 325.00 14,300.00 335.00 14,740.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 456. 800.00 364,800.00 900.00 410,400.00 872.00 397,632.00 526.2 EPOXY FOR NON-MOVING CRACKS LF 15. 75.00 1,125.00 105.00 1,575.00 62.00 930.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 70. 60.00 4,200.00 70.00 4,900.00 90.00 6,300.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 1,503. 15.30 22,995.90 16.00 24,048.00 16.80 25,250.40 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 62. 5.00 310.00 8.00 496.00 5.75 356.50 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 169,852. 1.01 171,550.52 1.10 186,837.20 .92 156,263.84 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 12,634. 3.06 38,660.04 3.00 37,902.00 4.35 54,957.90 544.7 SYNTHETIC FIBER REINFORCMENT LB 308. 7.00 2,156.00 8.00 2,464.00 6.90 2,125.20 547. SHEAR CONNECTORS (F) EA 4,125. 4.50 18,562.50 4.00 16,500.00 4.25 17,531.25 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 2,721.00 27,210.00 2,075.00 20,750.00 3,000.00 30,000.00 550.1 STRUCTURAL STEEL (F) LB 3,300. 8.00 26,400.00 5.60 18,480.00 5.20 17,160.00 556.101 PAINTING EXISTING STRUCTURAL STEEL U 1. 334,900.00 334,900.00 305,500.00 305,500.00 336,000.00 336,000.00 556.201 CONTAINMENT & ENVIRONMENTAL PROTECTION U 1. 110,000.00 110,000.00 130,000.00 130,000.00 143,000.00 143,000.00 15906 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 556.301 WORKER PROTECTION U 1. 10,000.00 10,000.00 10,000.00 10,000.00 11,000.00 11,000.00 556.401 WASTE MANAGEMENT U 1. 2,100.00 2,100.00 2,500.00 2,500.00 2,750.00 2,750.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 72. 601.00 43,272.00 545.00 39,240.00 700.00 50,400.00 563.23 BRIDGE RAIL T3 (F) LF 850. 117.00 99,450.00 119.00 101,150.00 130.00 110,500.00 565.232 BRIDGE APPROACH RAIL T3 (STEEL POST) U 4. 4,200.00 16,800.00 4,785.00 19,140.00 5,260.00 21,040.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 31. 55.00 1,705.00 35.00 1,085.00 50.00 1,550.00 585.3 STONE FILL, CLASS C CY 8. 60.00 480.00 50.00 400.00 45.00 360.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 35. 5.00 175.00 3.00 105.00 3.40 119.00 603.30112 12" R.C. END SECTIONS EA 4. 930.00 3,720.00 550.00 2,200.00 675.00 2,700.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 165. 35.00 5,775.00 30.00 4,950.00 35.00 5,775.00 604.0007 POLYETHYLENE LINER EA 4. 250.00 1,000.00 125.00 500.00 190.00 760.00 604.12 CATCH BASINS TYPE B U 4. 2,050.00 8,200.00 1,800.00 7,200.00 1,615.00 6,460.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,335. 14.00 18,690.00 15.85 21,159.75 17.50 23,362.50 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 1,700.00 3,400.00 1,850.00 3,700.00 2,000.00 4,000.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 470.00 940.00 550.00 1,100.00 600.00 1,200.00 606.4175 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL ANCHORED LF 420. 35.00 14,700.00 28.00 11,760.00 62.00 26,040.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 400. 30.00 12,000.00 55.00 22,000.00 58.00 23,200.00 609.01 STRAIGHT GRANITE CURB LF 155. 23.00 3,565.00 15.00 2,325.00 33.00 5,115.00 615.03 TRAFFIC SIGN TYPE C (F) SF 48. 50.00 2,400.00 50.50 2,424.00 100.00 4,800.00 616.171 PORTABLE TRAFFIC SIGNALS (PTS) SYSTEM-TEMPORARY U 1. 24,000.00 24,000.00 44,000.00 44,000.00 35,750.00 35,750.00 618.7 FLAGGERS HR 2,100. 15.00 31,500.00 20.50 43,050.00 27.50 57,750.00 619.1 MAINTENANCE OF TRAFFIC U 1. 12,000.00 12,000.00 15,000.00 15,000.00 12,500.00 12,500.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 600.00 7,200.00 500.00 6,000.00 240.00 2,880.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 18. 3.50 63.00 5.25 94.50 4.40 79.20 621.31 SINGLE DELINEATOR WITH POST EA 4. 30.00 120.00 32.55 130.20 35.00 140.00 622.1 STEEL WITNESS MARKERS EA 4. 28.00 112.00 25.00 100.00 27.50 110.00 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 80. 45.00 3,600.00 47.00 3,760.00 55.00 4,400.00 628.2 SAWED BITUMINOUS PAVEMENT LF 285. 3.00 855.00 1.50 427.50 5.50 1,567.50 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 3,100. .25 775.00 .28 868.00 .28 868.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 25. 2.75 68.75 3.15 78.75 3.30 82.50 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 75. 5.00 375.00 5.25 393.75 5.50 412.50 15906 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 125. 6.65 831.25 7.35 918.75 7.70 962.50 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 50. 10.00 500.00 12.00 600.00 11.00 550.00 645.531 SILT FENCE LF 830. 4.00 3,320.00 4.00 3,320.00 4.40 3,652.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .5 3,000.00 1,500.00 1,500.00 750.00 2,750.00 1,375.00 647.1 HUMUS CY 27. 35.00 945.00 18.00 486.00 48.00 1,296.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 6,000.00 6,000.00 10,000.00 10,000.00 6,900.00 6,900.00 692. MOBILIZATION U 1. 205,000.00 205,000.00 212,000.00 212,000.00 150,000.00 150,000.00 698.13 FIELD OFFICE TYPE C MON 24. 1,000.00 24,000.00 1,500.00 36,000.00 1,250.00 30,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 $2,199,524.96 $2,338,067.40 $2,417,664.29 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: THORNTON X-A001(028), 15906 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 14, 2010 SCOPE OF WORK: BRIDGE REHABILITATION LOCATION: BRIDGE NO. 175/076 CARRYING CROSS ROAD OVER THE PEMIGEWASSET RIVER BETWEEN US 3 AND NH 175 COMPLETION DATE: AUGUST 24, 2012 A WINTERSET, INC. PO BOX 968, 128 WINTERSET DRIVE, LYNDONVILLE, VT $ 1,988,888.76 B BECK & BELLUCCI, INC. PO BOX 429, FRANKLIN, NH 03235 $ 2,002,622.10 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,013,377.75 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,199,524.96 E ALVIN J. COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,338,067.40 F GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,417,664.29 G CPM CONSTRUCTORS O/ BONNEY ST., PO BOX B, FREEPORT, ME 04032 $ 2,426,085.25 H E.D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 2,560,080.00 I TBUCK CONSTRUCTION INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,614,830.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 145. 6.00 870.00 5.00 725.00 25.00 3,625.00 202.7 REMOVAL OF GUARDRAIL (F) LF 1,390. 3.00 4,170.00 1.50 2,085.00 3.00 4,170.00 203.1 COMMON EXCAVATION CY 20. 25.00 500.00 50.00 1,000.00 35.00 700.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 3,500.00 7,000.00 1,500.00 3,000.00 1,600.00 3,200.00 203.6 EMBANKMENT-IN-PLACE (F) CY 37. 45.00 1,665.00 50.00 1,850.00 22.00 814.00 206.1 COMMON STRUCTURE EXCAVATION CY 8. 50.00 400.00 50.00 400.00 35.00 280.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 8. 65.00 520.00 50.00 400.00 75.00 600.00 304.1 SAND (F) CY 14. 60.00 840.00 50.00 700.00 40.00 560.00 304.2 GRAVEL (F) CY 14. 65.00 910.00 50.00 700.00 40.00 560.00 304.3 CRUSHED GRAVEL (F) CY 20. 105.00 2,100.00 50.00 1,000.00 40.00 800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 350. 73.00 25,550.00 67.50 23,625.00 73.00 25,550.00 15906 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 115.00 575.00 115.00 575.00 115.00 575.00 403.6 PAVEMENT JOINT ADHESIVE LF 360. 1.00 360.00 5.00 1,800.00 6.00 2,160.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 88. 115.00 10,120.00 115.00 10,120.00 115.00 10,120.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,240. 8.00 9,920.00 8.00 9,920.00 15.00 18,600.00 500.032 PREPORATION FOR FATIGUE CRACK INSPECTION - WITH LEAD PAINT POLL CONTROL U 176. 60.00 10,560.00 50.00 8,800.00 60.00 10,560.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 330,000.00 330,000.00 500,000.00 500,000.00 325,000.00 325,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 60. 60.00 3,600.00 50.00 3,000.00 47.00 2,820.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 5. 900.00 4,500.00 400.00 2,000.00 800.00 4,000.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 1,650.00 8,250.00 500.00 2,500.00 850.00 4,250.00 520.01 CONCRETE CLASS AA CY 20. 850.00 17,000.00 1,750.00 35,000.00 1,500.00 30,000.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 44. 300.00 13,200.00 305.00 13,420.00 600.00 26,400.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 456. 850.00 387,600.00 885.00 403,560.00 1,100.00 501,600.00 526.2 EPOXY FOR NON-MOVING CRACKS LF 15. 65.00 975.00 200.00 3,000.00 250.00 3,750.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 70. 85.00 5,950.00 75.00 5,250.00 95.00 6,650.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 1,503. 17.30 26,001.90 25.00 37,575.00 16.00 24,048.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 62. 8.00 496.00 5.00 310.00 20.00 1,240.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 169,852. 1.00 169,852.00 1.00 169,852.00 .95 161,359.40 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 12,634. 3.00 37,902.00 2.50 31,585.00 2.50 31,585.00 544.7 SYNTHETIC FIBER REINFORCMENT LB 308. 6.00 1,848.00 6.00 1,848.00 7.00 2,156.00 547. SHEAR CONNECTORS (F) EA 4,125. 6.00 24,750.00 4.00 16,500.00 4.50 18,562.50 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 4,000.00 40,000.00 2,500.00 25,000.00 3,200.00 32,000.00 550.1 STRUCTURAL STEEL (F) LB 3,300. 5.00 16,500.00 5.00 16,500.00 11.00 36,300.00 556.101 PAINTING EXISTING STRUCTURAL STEEL U 1. 305,500.00 305,500.00 350,000.00 350,000.00 325,000.00 325,000.00 556.201 CONTAINMENT & ENVIRONMENTAL PROTECTION U 1. 130,000.00 130,000.00 130,000.00 130,000.00 175,000.00 175,000.00 15906 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 556.301 WORKER PROTECTION U 1. 10,000.00 10,000.00 10,000.00 10,000.00 15,000.00 15,000.00 556.401 WASTE MANAGEMENT U 1. 2,500.00 2,500.00 2,500.00 2,500.00 7,500.00 7,500.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 72. 750.00 54,000.00 600.00 43,200.00 660.00 47,520.00 563.23 BRIDGE RAIL T3 (F) LF 850. 135.00 114,750.00 120.00 102,000.00 120.00 102,000.00 565.232 BRIDGE APPROACH RAIL T3 (STEEL POST) U 4. 5,733.00 22,932.00 5,000.00 20,000.00 4,800.00 19,200.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 31. 100.00 3,100.00 50.00 1,550.00 55.00 1,705.00 585.3 STONE FILL, CLASS C CY 8. 100.00 800.00 50.00 400.00 75.00 600.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 35. 10.00 350.00 5.00 175.00 20.00 700.00 603.30112 12" R.C. END SECTIONS EA 4. 175.00 700.00 500.00 2,000.00 550.00 2,200.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 165. 60.00 9,900.00 50.00 8,250.00 45.00 7,425.00 604.0007 POLYETHYLENE LINER EA 4. 250.00 1,000.00 200.00 800.00 500.00 2,000.00 604.12 CATCH BASINS TYPE B U 4. 2,000.00 8,000.00 2,500.00 10,000.00 2,800.00 11,200.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,335. 17.11 22,841.85 16.00 21,360.00 16.00 21,360.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 1,700.00 3,400.00 2,000.00 4,000.00 1,850.00 3,700.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 500.00 1,000.00 550.00 1,100.00 550.00 1,100.00 606.4175 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL ANCHORED LF 420. 60.00 25,200.00 50.00 21,000.00 82.00 34,440.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 400. 45.00 18,000.00 20.00 8,000.00 71.00 28,400.00 609.01 STRAIGHT GRANITE CURB LF 155. 31.00 4,805.00 25.00 3,875.00 45.00 6,975.00 615.03 TRAFFIC SIGN TYPE C (F) SF 48. 49.50 2,376.00 50.00 2,400.00 50.00 2,400.00 616.171 PORTABLE TRAFFIC SIGNALS (PTS) SYSTEM-TEMPORARY U 1. 36,000.00 36,000.00 25,000.00 25,000.00 50,000.00 50,000.00 618.7 FLAGGERS HR 2,100. 22.00 46,200.00 20.00 42,000.00 17.00 35,700.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 25,000.00 25,000.00 18,000.00 18,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 300.00 3,600.00 500.00 6,000.00 300.00 3,600.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 18. 5.00 90.00 4.00 72.00 4.00 72.00 621.31 SINGLE DELINEATOR WITH POST EA 4. 33.00 132.00 32.00 128.00 32.00 128.00 622.1 STEEL WITNESS MARKERS EA 4. 29.00 116.00 25.00 100.00 25.00 100.00 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 80. 50.00 4,000.00 50.00 4,000.00 75.00 6,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 285. 3.50 997.50 3.00 855.00 5.00 1,425.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 3,100. .25 775.00 .25 775.00 .25 775.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 25. 3.00 75.00 3.00 75.00 3.00 75.00 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 75. 5.00 375.00 5.00 375.00 5.00 375.00 15906 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 125. 7.00 875.00 7.00 875.00 7.00 875.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 50. 10.00 500.00 8.00 400.00 10.00 500.00 645.531 SILT FENCE LF 830. 7.00 5,810.00 3.00 2,490.00 3.00 2,490.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .5 1,100.00 550.00 2,500.00 1,250.00 15,000.00 7,500.00 647.1 HUMUS CY 27. 50.00 1,350.00 25.00 675.00 50.00 1,350.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 20,000.00 20,000.00 10,000.00 10,000.00 5,000.00 5,000.00 692. MOBILIZATION U 1. 240,000.00 240,000.00 250,000.00 250,000.00 267,845.10 267,845.10 698.13 FIELD OFFICE TYPE C MON 24. 1,000.00 24,000.00 1,200.00 28,800.00 750.00 18,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 $2,426,085.25 $2,560,080.00 $2,614,830.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: THORNTON X-A001(028), 15906 COUNTIES AND CODES: GRAFTON 009 DATE BIDS OPEN: OCTOBER 14, 2010 SCOPE OF WORK: BRIDGE REHABILITATION LOCATION: BRIDGE NO. 175/076 CARRYING CROSS ROAD OVER THE PEMIGEWASSET RIVER BETWEEN US 3 AND NH 175 COMPLETION DATE: AUGUST 24, 2012 A WINTERSET, INC. PO BOX 968, 128 WINTERSET DRIVE, LYNDONVILLE, VT $ 1,988,888.76 B BECK & BELLUCCI, INC. PO BOX 429, FRANKLIN, NH 03235 $ 2,002,622.10 C R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 2,013,377.75 D R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,199,524.96 E ALVIN J. COLEMAN & SON INC. 9 NH ROUTE 113, CONWAY, NH 03818 $ 2,338,067.40 F GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 2,417,664.29 G CPM CONSTRUCTORS O/ BONNEY ST., PO BOX B, FREEPORT, ME 04032 $ 2,426,085.25 H E.D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 2,560,080.00 I TBUCK CONSTRUCTION INC. 249 MERROW RD., AUBURN, ME 04210 $ 2,614,830.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.6 CURB REMOVAL FOR STORAGE LF 145. 2.50 362.50 3.00 435.00 -72.50 202.7 REMOVAL OF GUARDRAIL (F) LF 1,390. 1.50 2,085.00 2.50 3,475.00 -1,390.00 203.1 COMMON EXCAVATION CY 20. 45.00 900.00 5.00 100.00 800.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 900.00 1,800.00 1,400.00 2,800.00 -1,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 37. 22.00 814.00 5.00 185.00 629.00 206.1 COMMON STRUCTURE EXCAVATION CY 8. 100.00 800.00 12.00 96.00 704.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 8. 47.00 376.00 25.00 200.00 176.00 304.1 SAND (F) CY 14. 31.00 434.00 18.25 255.50 178.50 304.2 GRAVEL (F) CY 14. 31.00 434.00 25.00 350.00 84.00 304.3 CRUSHED GRAVEL (F) CY 20. 28.00 560.00 25.00 500.00 60.00 15906 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 350. 75.00 26,250.00 75.00 26,250.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 120.00 600.00 131.00 655.00 -55.00 403.6 PAVEMENT JOINT ADHESIVE LF 360. 5.25 1,890.00 1.00 360.00 1,530.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 88. 120.00 10,560.00 160.00 14,080.00 -3,520.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,240. 7.75 9,610.00 3.00 3,720.00 5,890.00 500.032 PREPORATION FOR FATIGUE CRACK INSPECTION - WITH LEAD PAINT POLL CONTROL U 176. 52.00 9,152.00 250.00 44,000.00 -34,848.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 187,000.00 187,000.00 460,000.00 460,000.00 -273,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 60. 54.00 3,240.00 40.00 2,400.00 840.00 512.0101 PREPARATION FOR CONCRETE REPAIRS, CLASS I SY 5. 300.00 1,500.00 450.00 2,250.00 -750.00 512.0201 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY 5. 650.00 3,250.00 625.00 3,125.00 125.00 520.01 CONCRETE CLASS AA CY 20. 1,785.00 35,700.00 1,000.00 20,000.00 15,700.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 44. 580.00 25,520.00 700.00 30,800.00 -5,280.00 520.70026 CONCRETE BRIDGE DECK (QC/QA)(PANEL OPTION)(F) CY 456. 655.00 298,680.00 800.00 364,800.00 -66,120.00 526.2 EPOXY FOR NON-MOVING CRACKS LF 15. 30.00 450.00 175.00 2,625.00 -2,175.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 70. 48.00 3,360.00 100.00 7,000.00 -3,640.00 538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY 1,503. 16.00 24,048.00 30.00 45,090.00 -21,042.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 62. 8.00 496.00 5.00 310.00 186.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 169,852. .98 166,454.96 2.00 339,704.00 -173,249.04 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 12,634. 2.70 34,111.80 3.00 37,902.00 -3,790.20 544.7 SYNTHETIC FIBER REINFORCMENT LB 308. 6.00 1,848.00 5.00 1,540.00 308.00 547. SHEAR CONNECTORS (F) EA 4,125. 4.50 18,562.50 4.00 16,500.00 2,062.50 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 10. 2,200.00 22,000.00 2,000.00 20,000.00 2,000.00 550.1 STRUCTURAL STEEL (F) LB 3,300. 5.00 16,500.00 10.00 33,000.00 -16,500.00 556.101 PAINTING EXISTING STRUCTURAL STEEL U 1. 310,000.00 310,000.00 255,000.00 255,000.00 55,000.00 556.201 CONTAINMENT & ENVIRONMENTAL PROTECTION U 1. 135,000.00 135,000.00 185,000.00 185,000.00 -50,000.00 15906 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 556.301 WORKER PROTECTION U 1. 10,500.00 10,500.00 18,000.00 18,000.00 -7,500.00 556.401 WASTE MANAGEMENT U 1. 2,600.00 2,600.00 5,000.00 5,000.00 -2,400.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 72. 638.00 45,936.00 300.00 21,600.00 24,336.00 563.23 BRIDGE RAIL T3 (F) LF 850. 125.00 106,250.00 180.00 153,000.00 -46,750.00 565.232 BRIDGE APPROACH RAIL T3 (STEEL POST) U 4. 5,000.00 20,000.00 5,500.00 22,000.00 -2,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 31. 50.00 1,550.00 30.00 930.00 620.00 585.3 STONE FILL, CLASS C CY 8. 60.00 480.00 30.00 240.00 240.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 35. 8.00 280.00 5.00 175.00 105.00 603.30112 12" R.C. END SECTIONS EA 4. 450.00 1,800.00 350.00 1,400.00 400.00 603.44012 12" CORR. POLYETHYLENE PIPE FOR SLOPE DRAINAGE LF 165. 18.00 2,970.00 50.00 8,250.00 -5,280.00 604.0007 POLYETHYLENE LINER EA 4. 160.00 640.00 164.50 658.00 -18.00 604.12 CATCH BASINS TYPE B U 4. 1,900.00 7,600.00 2,110.00 8,440.00 -840.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 1,335. 16.00 21,360.00 20.00 26,700.00 -5,340.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 2. 1,900.00 3,800.00 2,100.00 4,200.00 -400.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 2. 575.00 1,150.00 528.00 1,056.00 94.00 606.4175 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL ANCHORED LF 420. 57.00 23,940.00 55.00 23,100.00 840.00 606.95 TEMPORARY TRAFFIC CONTROL BARRIER LF 400. 19.00 7,600.00 22.50 9,000.00 -1,400.00 609.01 STRAIGHT GRANITE CURB LF 155. 25.00 3,875.00 16.00 2,480.00 1,395.00 615.03 TRAFFIC SIGN TYPE C (F) SF 48. 50.00 2,400.00 45.00 2,160.00 240.00 616.171 PORTABLE TRAFFIC SIGNALS (PTS) SYSTEM-TEMPORARY U 1. 36,000.00 36,000.00 125,000.00 125,000.00 -89,000.00 618.7 FLAGGERS HR 2,100. 36.00 75,600.00 27.00 56,700.00 18,900.00 619.1 MAINTENANCE OF TRAFFIC U 1. 7,000.00 7,000.00 50,000.00 50,000.00 -43,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 12. 330.00 3,960.00 300.00 3,600.00 360.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 18. 4.00 72.00 4.40 79.20 -7.20 621.31 SINGLE DELINEATOR WITH POST EA 4. 33.00 132.00 25.00 100.00 32.00 622.1 STEEL WITNESS MARKERS EA 4. 26.00 104.00 .30 1.20 102.80 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 80. 47.00 3,760.00 45.00 3,600.00 160.00 628.2 SAWED BITUMINOUS PAVEMENT LF 285. 1.50 427.50 3.25 926.25 -498.75 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 3,100. .26 806.00 .20 620.00 186.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 25. 3.10 77.50 3.40 85.00 -7.50 632.0124 RETROREFLECTIVE PAINT PAVE. MARKING, 24" LINE LF 75. 5.25 393.75 5.40 405.00 -11.25 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 125. 7.25 906.25 3.95 493.75 412.50 15906 PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 50. 2.00 100.00 10.50 525.00 -425.00 645.531 SILT FENCE LF 830. 2.00 1,660.00 3.90 3,237.00 -1,577.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A .5 2,000.00 1,000.00 1,960.00 980.00 20.00 647.1 HUMUS CY 27. 30.00 810.00 18.00 486.00 324.00 670.104 TEMPORARY PORTABLE LIGHTING U 1. 14,000.00 14,000.00 15,000.00 15,000.00 -1,000.00 692. MOBILIZATION U 1. 120,000.00 120,000.00 149,700.00 149,700.00 -29,700.00 698.13 FIELD OFFICE TYPE C MON 24. 750.00 18,000.00 1,500.00 36,000.00 -18,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 $1,988,888.76 $2,765,434.90 -776,546.14