THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPSTEAD X-A000(850), 15655 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 22, 2010 SCOPE OF WORK: BOX CULVERT REPLACEMENT LOCATION: HOG HILL BROOK UNDER NH ROUTE 121 COMPLETION DATE: SEPTEMBER 10, 2010 A J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 249,119.00 B MAS BUILDING & BRIDGE INC. 842 UPPER UNION STREET, UNIT 8, FRANKLIN, MA 02038 $ 273,989.75 C BUSBY CONSTRUCTION CO., INC. 9 POND LANE, ATKINSON, NH 03811 $ 277,761.00 D CONTINENTAL PAVING, INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 283,982.50 E BRIDGES L.L.C. D/B/A BRIDGES 2010 85 SOUTH BOW. ST., MILFORD, MA 01757 $ 288,748.00 F N. PANDELENA CONSTRUCTION CO. 6 STARWOOD DR., HAMPSTEAD, NH 03841 $ 297,917.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 300. 16.00 4,800.00 15.00 4,500.00 10.00 3,000.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 700.00 2,800.00 900.00 3,600.00 950.00 3,800.00 203.6 EMBANKMENT-IN-PLACE (F) CY 80. 18.00 1,440.00 15.00 1,200.00 10.00 800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 32.00 640.00 34.00 680.00 45.00 900.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 35. 40.00 1,400.00 65.00 2,275.00 50.00 1,750.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 435. 22.00 9,570.00 30.00 13,050.00 42.00 18,270.00 304.3 CRUSHED GRAVEL (F) CY 190. 24.00 4,560.00 24.00 4,560.00 30.00 5,700.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 10. 30.00 300.00 28.00 280.00 42.00 420.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 230. 90.00 20,700.00 118.00 27,140.00 135.00 31,050.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 110.00 550.00 118.00 590.00 135.00 675.00 403.6 PAVEMENT JOINT ADHESIVE LF 235. 5.00 1,175.00 4.00 940.00 2.00 470.00 417. COLD PLANING BITUMINOUS SURFACES SY 50. 50.00 2,500.00 40.00 2,000.00 45.00 2,250.00 503.1 WATER DIVERSION STRUCTURES U 1. 12,000.00 12,000.00 33,000.00 33,000.00 21,850.00 21,850.00 503.201 COFFERDAMS U 1. 12,000.00 12,000.00 15,000.00 15,000.00 25,920.00 25,920.00 504.101 COMMON BRIDGE EXCAVATION CY 590. 18.00 10,620.00 22.00 12,980.00 12.00 7,080.00 15655 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 504.2 ROCK BRIDGE EXCAVATION CY 89. 50.00 4,450.00 60.00 5,340.00 20.00 1,780.00 508. STRUCTURAL FILL CY 45. 18.00 810.00 34.00 1,530.00 70.00 3,150.00 520.0021 PRECAST CONCRETE BOX CULVERT (CONCRETE CLASS AAA) (BRIDGE) U 1. 82,000.00 82,000.00 67,500.00 67,500.00 66,730.00 66,730.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 6. 30.00 180.00 66.00 396.00 60.00 360.00 538.1 BARRIER MEMBRANE (F) SY 85. 32.00 2,720.00 20.00 1,700.00 35.00 2,975.00 587.1 KEYED STONE FILL CY 54. 30.00 1,620.00 55.00 2,970.00 40.00 2,160.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 81. 4.00 324.00 4.00 324.00 6.00 486.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 125. 20.00 2,500.00 17.00 2,125.00 19.00 2,375.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) LF 200. 30.00 6,000.00 22.00 4,400.00 24.20 4,840.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 2,400.00 9,600.00 1,850.00 7,400.00 2,035.00 8,140.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 750.00 750.00 750.00 750.00 750.00 750.00 618.7 FLAGGERS HR 100. 15.00 1,500.00 25.00 2,500.00 24.00 2,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 11,000.00 11,000.00 14,300.00 14,300.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 500.00 4,000.00 150.00 1,200.00 375.00 3,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 15. 10.00 150.00 5.00 75.00 5.00 75.00 628.2 SAWED BITUMINOUS PAVEMENT LF 105. 4.00 420.00 6.00 630.00 3.00 315.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 915. 1.00 915.00 1.00 915.00 1.00 915.00 645.3 EROSION STONE TON 100. 20.00 2,000.00 29.61 2,961.00 28.00 2,800.00 645.531 SILT FENCE LF 375. 3.00 1,125.00 4.25 1,593.75 4.00 1,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 2,500.00 2,500.00 2,100.00 2,100.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 50.00 1,000.00 58.00 1,160.00 65.00 1,300.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 500. 1.50 750.00 6.00 3,000.00 7.90 3,950.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 250.00 250.00 225.00 225.00 175.00 175.00 692. MOBILIZATION U 1. 19,000.00 19,000.00 26,000.00 26,000.00 23,250.00 23,250.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 $249,119.00 $273,989.75 $277,761.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPSTEAD X-A000(850), 15655 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 22, 2010 SCOPE OF WORK: BOX CULVERT REPLACEMENT LOCATION: HOG HILL BROOK UNDER NH ROUTE 121 COMPLETION DATE: SEPTEMBER 10, 2010 A J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 249,119.00 B MAS BUILDING & BRIDGE INC. 842 UPPER UNION STREET, UNIT 8, FRANKLIN, MA 02038 $ 273,989.75 C BUSBY CONSTRUCTION CO., INC. 9 POND LANE, ATKINSON, NH 03811 $ 277,761.00 D CONTINENTAL PAVING, INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 283,982.50 E BRIDGES L.L.C. D/B/A BRIDGES 2010 85 SOUTH BOW. ST., MILFORD, MA 01757 $ 288,748.00 F N. PANDELENA CONSTRUCTION CO. 6 STARWOOD DR., HAMPSTEAD, NH 03841 $ 297,917.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.1 COMMON EXCAVATION CY 300. 15.00 4,500.00 18.00 5,400.00 25.00 7,500.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 1,500.00 6,000.00 1,100.00 4,400.00 1,500.00 6,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 80. 7.50 600.00 28.00 2,240.00 10.00 800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 75.00 1,500.00 35.00 700.00 30.00 600.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 35. 30.00 1,050.00 15.00 525.00 40.00 1,400.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 435. 60.00 26,100.00 22.00 9,570.00 24.00 10,440.00 304.3 CRUSHED GRAVEL (F) CY 190. 30.00 5,700.00 28.00 5,320.00 25.00 4,750.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 10. 30.00 300.00 36.00 360.00 25.00 250.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 230. 95.00 21,850.00 95.00 21,850.00 100.00 23,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 115.00 575.00 150.00 750.00 140.00 700.00 403.6 PAVEMENT JOINT ADHESIVE LF 235. 1.00 235.00 4.00 940.00 5.00 1,175.00 417. COLD PLANING BITUMINOUS SURFACES SY 50. 50.00 2,500.00 26.00 1,300.00 60.00 3,000.00 503.1 WATER DIVERSION STRUCTURES U 1. 12,500.00 12,500.00 42,000.00 42,000.00 10,000.00 10,000.00 503.201 COFFERDAMS U 1. 15,000.00 15,000.00 4,400.00 4,400.00 30,000.00 30,000.00 504.101 COMMON BRIDGE EXCAVATION CY 590. 33.00 19,470.00 16.00 9,440.00 22.00 12,980.00 15655 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 504.2 ROCK BRIDGE EXCAVATION CY 89. 75.00 6,675.00 28.00 2,492.00 120.00 10,680.00 508. STRUCTURAL FILL CY 45. 40.00 1,800.00 45.00 2,025.00 20.00 900.00 520.0021 PRECAST CONCRETE BOX CULVERT (CONCRETE CLASS AAA) (BRIDGE) U 1. 75,000.00 75,000.00 110,000.00 110,000.00 87,500.00 87,500.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 6. 20.00 120.00 25.00 150.00 100.00 600.00 538.1 BARRIER MEMBRANE (F) SY 85. 30.00 2,550.00 25.00 2,125.00 25.00 2,125.00 587.1 KEYED STONE FILL CY 54. 30.00 1,620.00 37.00 1,998.00 50.00 2,700.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 81. 5.00 405.00 3.00 243.00 5.00 405.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 125. 17.50 2,187.50 18.00 2,250.00 21.00 2,625.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) LF 200. 22.00 4,400.00 18.00 3,600.00 30.00 6,000.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 1,850.00 7,400.00 1,500.00 6,000.00 2,400.00 9,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 750.00 750.00 750.00 750.00 750.00 750.00 618.7 FLAGGERS HR 100. 25.00 2,500.00 25.00 2,500.00 26.00 2,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 15,000.00 15,000.00 9,000.00 9,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 300.00 2,400.00 400.00 3,200.00 400.00 3,200.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 15. 5.00 75.00 15.00 225.00 5.50 82.50 628.2 SAWED BITUMINOUS PAVEMENT LF 105. 1.00 105.00 4.00 420.00 3.00 315.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 915. 1.00 915.00 1.00 915.00 1.00 915.00 645.3 EROSION STONE TON 100. 25.00 2,500.00 25.00 2,500.00 20.00 2,000.00 645.531 SILT FENCE LF 375. 4.00 1,500.00 5.00 1,875.00 5.00 1,875.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 3,500.00 3,500.00 3,000.00 3,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 65.00 1,300.00 58.00 1,160.00 80.00 1,600.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 500. 2.50 1,250.00 1.00 500.00 .50 250.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 150.00 150.00 125.00 125.00 100.00 100.00 692. MOBILIZATION U 1. 30,000.00 30,000.00 12,000.00 12,000.00 32,500.00 32,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 $283,982.50 $288,748.00 $297,917.50 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: HAMPSTEAD X-A000(850), 15655 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 22, 2010 SCOPE OF WORK: BOX CULVERT REPLACEMENT LOCATION: HOG HILL BROOK UNDER NH ROUTE 121 COMPLETION DATE: SEPTEMBER 10, 2010 A J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 249,119.00 B MAS BUILDING & BRIDGE INC. 842 UPPER UNION STREET, UNIT 8, FRANKLIN, MA 02038 $ 273,989.75 C BUSBY CONSTRUCTION CO., INC. 9 POND LANE, ATKINSON, NH 03811 $ 277,761.00 D CONTINENTAL PAVING, INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 283,982.50 E BRIDGES L.L.C. D/B/A BRIDGES 2010 85 SOUTH BOW. ST., MILFORD, MA 01757 $ 288,748.00 F N. PANDELENA CONSTRUCTION CO. 6 STARWOOD DR., HAMPSTEAD, NH 03841 $ 297,917.50 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 203.1 COMMON EXCAVATION CY 300. 16.00 4,800.00 8.00 2,400.00 2,400.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 4. 700.00 2,800.00 700.00 2,800.00 203.6 EMBANKMENT-IN-PLACE (F) CY 80. 18.00 1,440.00 10.00 800.00 640.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 32.00 640.00 35.00 700.00 -60.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 35. 40.00 1,400.00 15.00 525.00 875.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 435. 22.00 9,570.00 20.00 8,700.00 870.00 304.3 CRUSHED GRAVEL (F) CY 190. 24.00 4,560.00 35.00 6,650.00 -2,090.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 10. 30.00 300.00 30.00 300.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 230. 90.00 20,700.00 80.00 18,400.00 2,300.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 5. 110.00 550.00 125.00 625.00 -75.00 403.6 PAVEMENT JOINT ADHESIVE LF 235. 5.00 1,175.00 .40 94.00 1,081.00 417. COLD PLANING BITUMINOUS SURFACES SY 50. 50.00 2,500.00 10.00 500.00 2,000.00 503.1 WATER DIVERSION STRUCTURES U 1. 12,000.00 12,000.00 3,000.00 3,000.00 9,000.00 503.201 COFFERDAMS U 1. 12,000.00 12,000.00 34,800.00 34,800.00 -22,800.00 15655 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 504.101 COMMON BRIDGE EXCAVATION CY 590. 18.00 10,620.00 50.00 29,500.00 -18,880.00 504.2 ROCK BRIDGE EXCAVATION CY 89. 50.00 4,450.00 65.00 5,785.00 -1,335.00 508. STRUCTURAL FILL CY 45. 18.00 810.00 50.00 2,250.00 -1,440.00 520.0021 PRECAST CONCRETE BOX CULVERT (CONCRETE CLASS AAA) (BRIDGE) U 1. 82,000.00 82,000.00 110,000.00 110,000.00 -28,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 6. 30.00 180.00 100.00 600.00 -420.00 538.1 BARRIER MEMBRANE (F) SY 85. 32.00 2,720.00 25.00 2,125.00 595.00 587.1 KEYED STONE FILL CY 54. 30.00 1,620.00 50.00 2,700.00 -1,080.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 81. 4.00 324.00 5.00 405.00 -81.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 125. 20.00 2,500.00 16.00 2,000.00 500.00 606.1202 BEAM GUARDRAIL (STANDARD SECTION - DOUBLE NESTED) LF 200. 30.00 6,000.00 22.00 4,400.00 1,600.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 4. 2,400.00 9,600.00 2,000.00 8,000.00 1,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 750.00 750.00 750.00 750.00 618.7 FLAGGERS HR 100. 15.00 1,500.00 25.00 2,500.00 -1,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 15,000.00 15,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 500.00 4,000.00 350.00 2,800.00 1,200.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 15. 10.00 150.00 5.00 75.00 75.00 628.2 SAWED BITUMINOUS PAVEMENT LF 105. 4.00 420.00 5.00 525.00 -105.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 915. 1.00 915.00 .65 594.75 320.25 645.3 EROSION STONE TON 100. 20.00 2,000.00 25.00 2,500.00 -500.00 645.531 SILT FENCE LF 375. 3.00 1,125.00 3.00 1,125.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 2,000.00 2,000.00 1,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 50.00 1,000.00 75.00 1,500.00 -500.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 500. 1.50 750.00 3.00 1,500.00 -750.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 250.00 250.00 150.00 150.00 100.00 692. MOBILIZATION U 1. 19,000.00 19,000.00 20,000.00 20,000.00 -1,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 $249,119.00 $303,078.75 -53,959.75