THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPSTEAD X-A000(811), 15606 COUTNIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 20, 2010 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 111 IN HAMPSTEAD AND ATKINSON COMPLETION DATE: OCTOBER 8, 2010 A BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,248,032.90 B CONTINENTAL PAVING, INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,340,672.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 6,150. .92 5,658.00 1.50 9,225.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 13. 1,250.00 16,250.00 1,500.00 19,500.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 14. 975.00 13,650.00 1,250.00 17,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 45.00 450.00 50.00 500.00 206.2 ROCK STRUCTURE EXCAVATION CY 4. 75.00 300.00 50.00 200.00 209.4 GRANULAR BACKFILL (GRAV) CY 4. 50.00 200.00 30.00 120.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 22.00 11,000.00 18.00 9,000.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 1,650. 68.00 112,200.00 68.00 112,200.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,850. 68.00 329,800.00 68.00 329,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 110. 125.00 13,750.00 110.00 12,100.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 5,600. 1.00 5,600.00 1.00 5,600.00 403.6 PAVEMENT JOINT ADHESIVE LF 74,250. .24 17,820.00 .25 18,562.50 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 750. 73.00 54,750.00 70.00 52,500.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 2,200. 73.00 160,600.00 70.00 154,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,350. 3.75 12,562.50 2.00 6,700.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 10,000. 3.75 37,500.00 2.00 20,000.00 604.0007 POLYETHYLENE LINER EA 7. 115.00 805.00 150.00 1,050.00 15606 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 10. 250.00 2,500.00 350.00 3,500.00 604.72 GRATES & FRAMES, TYPE B EA 1. 600.00 600.00 300.00 300.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 5,625. 15.16 85,275.00 17.85 100,406.25 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 50. 24.58 1,229.00 24.00 1,200.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 13. 1,737.00 22,581.00 2,100.00 27,300.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 14. 1,454.00 20,356.00 1,700.00 23,800.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,222.00 1,222.00 1,200.00 1,200.00 608.26 6" CONCRETE SIDEWALK (F) SY 25. 75.00 1,875.00 65.00 1,625.00 609.5 RESET GRANITE CURB LF 430. 14.00 6,020.00 6.00 2,580.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 210. 5.00 1,050.00 3.50 735.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 2. 100.00 200.00 200.00 400.00 614.331 3" STEEL CONDUIT LF 45. 19.00 855.00 18.00 810.00 614.511 CONCRETE PULL BOX 14" EA 1. 330.00 330.00 330.00 330.00 614.522 MOLDED PULL BOX 13"X24" EA 14. 330.00 4,620.00 330.00 4,620.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 900. 8.20 7,380.00 8.50 7,650.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 220. 13.80 3,036.00 14.00 3,080.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 80. 18.00 1,440.00 18.00 1,440.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 15,200.00 15,200.00 15,900.00 15,900.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 31. 520.00 16,120.00 520.00 16,120.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 618.7 FLAGGERS HR 1,400. 22.00 30,800.00 24.00 33,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 24,500.00 24,500.00 35,000.00 35,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 4,000.00 8,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 10. 250.00 2,500.00 250.00 2,500.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,200.00 2,400.00 200.00 400.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 80. 4.33 346.40 5.00 400.00 621.31 SINGLE DELINEATOR WITH POST EA 250. 23.76 5,940.00 28.00 7,000.00 628.2 SAWED BITUMINOUS PAVEMENT LF 610. 1.00 610.00 1.00 610.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 252,200. .08 20,176.00 .09 22,698.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 860. .95 817.00 .65 559.00 15606 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 2,500. .38 950.00 .40 1,000.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 300. .75 225.00 .85 255.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 860. 1.85 1,591.00 1.95 1,677.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 1,050. 3.75 3,937.50 3.70 3,885.00 632.9118 OBLITERATE PAVEMENT MARKING, 18" LINE LF 860. 1.05 903.00 .95 817.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 1,050. .95 997.50 1.35 1,417.50 641. LOAM CY 420. 22.00 9,240.00 18.00 7,560.00 645.531 SILT FENCE LF 200. 3.25 650.00 3.00 600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,000.00 1,000.00 800.00 800.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 72. 70.00 5,040.00 70.00 5,040.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5. 1,585.00 7,925.00 1,500.00 7,500.00 647.1 HUMUS CY 1,900. 6.00 11,400.00 15.00 28,500.00 692. MOBILIZATION U 1. 24,000.00 24,000.00 80,000.00 80,000.00 698.13 FIELD OFFICE TYPE C MON 8. 1,000.00 8,000.00 2,000.00 16,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 23,300.00 23,300.00 23,300.00 23,300.00 $1,248,032.90 $1,340,672.25 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: HAMPSTEAD X-A000(811), 15606 COUTNIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: APRIL 20, 2010 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 111 IN HAMPSTEAD AND ATKINSON COMPLETION DATE: OCTOBER 8, 2010 A BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 1,248,032.90 B CONTINENTAL PAVING, INC. ONE CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,340,672.25 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.7 REMOVAL OF GUARDRAIL (F) LF 6,150. .92 5,658.00 2.00 12,300.00 -6,642.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 13. 1,250.00 16,250.00 1,500.00 19,500.00 -3,250.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 14. 975.00 13,650.00 1,000.00 14,000.00 -350.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 45.00 450.00 32.00 320.00 130.00 206.2 ROCK STRUCTURE EXCAVATION CY 4. 75.00 300.00 100.00 400.00 -100.00 209.4 GRANULAR BACKFILL (GRAV) CY 4. 50.00 200.00 45.00 180.00 20.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 500. 22.00 11,000.00 15.00 7,500.00 3,500.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 1,650. 68.00 112,200.00 70.00 115,500.00 -3,300.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 4,850. 68.00 329,800.00 72.00 349,200.00 -19,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 110. 125.00 13,750.00 110.00 12,100.00 1,650.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 5,600. 1.00 5,600.00 1.00 5,600.00 403.6 PAVEMENT JOINT ADHESIVE LF 74,250. .24 17,820.00 .25 18,562.50 -742.50 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 750. 73.00 54,750.00 80.00 60,000.00 -5,250.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 2,200. 73.00 160,600.00 70.00 154,000.00 6,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 3,350. 3.75 12,562.50 2.00 6,700.00 5,862.50 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 10,000. 3.75 37,500.00 2.00 20,000.00 17,500.00 15606 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 604.0007 POLYETHYLENE LINER EA 7. 115.00 805.00 150.00 1,050.00 -245.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 10. 250.00 2,500.00 350.00 3,500.00 -1,000.00 604.72 GRATES & FRAMES, TYPE B EA 1. 600.00 600.00 400.00 400.00 200.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 5,625. 15.16 85,275.00 16.00 90,000.00 -4,725.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 50. 24.58 1,229.00 22.00 1,100.00 129.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 13. 1,737.00 22,581.00 2,000.00 26,000.00 -3,419.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 14. 1,454.00 20,356.00 1,650.00 23,100.00 -2,744.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,222.00 1,222.00 1,350.00 1,350.00 -128.00 608.26 6" CONCRETE SIDEWALK (F) SY 25. 75.00 1,875.00 50.00 1,250.00 625.00 609.5 RESET GRANITE CURB LF 430. 14.00 6,020.00 8.00 3,440.00 2,580.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 210. 5.00 1,050.00 4.00 840.00 210.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 2. 100.00 200.00 100.00 200.00 614.331 3" STEEL CONDUIT LF 45. 19.00 855.00 16.00 720.00 135.00 614.511 CONCRETE PULL BOX 14" EA 1. 330.00 330.00 300.00 300.00 30.00 614.522 MOLDED PULL BOX 13"X24" EA 14. 330.00 4,620.00 300.00 4,200.00 420.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 900. 8.20 7,380.00 7.00 6,300.00 1,080.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 220. 13.80 3,036.00 12.00 2,640.00 396.00 614.7328 3" 2-DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 80. 18.00 1,440.00 16.00 1,280.00 160.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 15,200.00 15,200.00 12,500.00 12,500.00 2,700.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 31. 520.00 16,120.00 550.00 17,050.00 -930.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 618.7 FLAGGERS HR 1,400. 22.00 30,800.00 20.00 28,000.00 2,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 24,500.00 24,500.00 45,000.00 45,000.00 -20,500.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 6,000.00 12,000.00 -6,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 10. 250.00 2,500.00 350.00 3,500.00 -1,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,200.00 2,400.00 1,500.00 3,000.00 -600.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 80. 4.33 346.40 4.00 320.00 26.40 621.31 SINGLE DELINEATOR WITH POST EA 250. 23.76 5,940.00 26.00 6,500.00 -560.00 628.2 SAWED BITUMINOUS PAVEMENT LF 610. 1.00 610.00 1.50 915.00 -305.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 252,200. .08 20,176.00 .12 30,264.00 -10,088.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 860. .95 817.00 1.50 1,290.00 -473.00 15606 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 2,500. .38 950.00 .50 1,250.00 -300.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 300. .75 225.00 1.00 300.00 -75.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 860. 1.85 1,591.00 3.00 2,580.00 -989.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 1,050. 3.75 3,937.50 5.00 5,250.00 -1,312.50 632.9118 OBLITERATE PAVEMENT MARKING, 18" LINE LF 860. 1.05 903.00 .50 430.00 473.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 1,050. .95 997.50 1.50 1,575.00 -577.50 641. LOAM CY 420. 22.00 9,240.00 24.00 10,080.00 -840.00 645.531 SILT FENCE LF 200. 3.25 650.00 3.00 600.00 50.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,000.00 1,000.00 3,000.00 3,000.00 -2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 72. 70.00 5,040.00 100.00 7,200.00 -2,160.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5. 1,585.00 7,925.00 1,700.00 8,500.00 -575.00 647.1 HUMUS CY 1,900. 6.00 11,400.00 16.00 30,400.00 -19,000.00 692. MOBILIZATION U 1. 24,000.00 24,000.00 55,000.00 55,000.00 -31,000.00 698.13 FIELD OFFICE TYPE C MON 8. 1,000.00 8,000.00 1,500.00 12,000.00 -4,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 23,300.00 23,300.00 23,300.00 23,300.00 $1,248,032.90 $1,355,336.50 -107,303.60