THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPSOM X-A000(668), 15266 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: FEBRUARY 4, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: THE TOWN LINE BETWEEN EPSOM AND DEERFIELD, NH ROUTE 107 BRIDGE OVER GRIFFIN BROOK COMPLETION DATE: SEPTEMBER 24, 2010 A NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 721,953.33 B ALVIN J. COLEMAN & SON, INC. 9NH ROUTE 113, CONWAY, NH 03818 $ 760,829.98 C THIBEAULT CORP OF N E 603 OLD MAMMOTH RD, LONDONDERRY, NH 03053 $ 790,164.24 D GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 796,059.13 E NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 838,089.90 F R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 891,660.50 G NEW ENGLAND INFRASTRUCTURE, INC. 13 BRENT DR., HUDSON, MA 01749 $ 948,644.50 H T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 997,299.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 306.5 2.00 613.00 1.55 475.08 3.00 919.50 203.1 COMMON EXCAVATION CY 600. 8.00 4,800.00 10.00 6,000.00 6.02 3,612.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 1,000.00 3,000.00 2,500.00 7,500.00 1,479.18 4,437.54 203.6 EMBANKMENT-IN-PLACE (F) CY 65. 5.00 325.00 20.00 1,300.00 12.08 785.20 203.71 REHANDLING EXCAVATED MATERIAL CY 150. 15.00 2,250.00 15.00 2,250.00 8.00 1,200.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 270. 10.00 2,700.00 30.00 8,100.00 19.72 5,324.40 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 345. 28.00 9,660.00 30.00 10,350.00 12.34 4,257.30 214. FINE GRADING U 1. 5,000.00 5,000.00 3,000.00 3,000.00 1,744.86 1,744.86 304.1 SAND (F) CY 260. 14.00 3,640.00 20.00 5,200.00 11.88 3,088.80 304.2 GRAVEL (F) CY 235. 20.00 4,700.00 22.00 5,170.00 12.56 2,951.60 304.3 CRUSHED GRAVEL (F) CY 260. 23.00 5,980.00 26.00 6,760.00 16.83 4,375.80 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 158. 115.00 18,170.00 140.00 22,120.00 75.60 11,944.80 403.6 PAVEMENT JOINT ADHESIVE LF 525. 2.50 1,312.50 2.35 1,233.75 3.15 1,653.75 15266 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 40. 115.00 4,600.00 140.00 5,600.00 131.25 5,250.00 417. COLD PLANING BITUMINOUS SURFACES SY 390. 11.00 4,290.00 14.00 5,460.00 12.82 4,999.80 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 8,500.00 8,500.00 38,000.00 38,000.00 30,091.86 30,091.86 503.101 WATER DIVERSION STRUCTURE U 1. 5,450.00 5,450.00 18,000.00 18,000.00 21,291.82 21,291.82 503.201 COFFERDAMS U 1. 22,389.00 22,389.00 54,900.00 54,900.00 25,200.00 25,200.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 108,665.00 108,665.00 88,850.00 88,850.00 105,000.00 105,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 795. 9.00 7,155.00 15.00 11,925.00 5.38 4,277.10 504.2 ROCK BRIDGE EXCAVATION CY 60. 145.00 8,700.00 20.00 1,200.00 29.58 1,774.80 508. STRUCTURAL FILL CY 108. 30.00 3,240.00 30.00 3,240.00 11.36 1,226.88 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 47. 405.00 19,035.00 300.00 14,100.00 577.50 27,142.50 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 65. 645.00 41,925.00 710.00 46,150.00 630.00 40,950.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 76. 662.00 50,312.00 475.00 36,100.00 367.50 27,930.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 31. 1,615.00 50,065.00 940.00 29,140.00 892.50 27,667.50 520.7004 CONCRETE BRIDGE DECK - TERNARY MIX (F) CY 21. 1,615.00 33,915.00 1,130.00 23,730.00 892.50 18,742.50 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 18. 50.00 900.00 88.00 1,584.00 58.12 1,046.16 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 10. 50.00 500.00 46.00 460.00 236.25 2,362.50 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 59. 6.00 354.00 8.25 486.75 10.50 619.50 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 40. 12.00 480.00 11.00 440.00 10.50 420.00 544. REINFORCING STEEL (F) LB 11,175. .75 8,381.25 1.15 12,851.25 .89 9,945.75 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 351. 4.75 1,667.25 2.25 789.75 5.29 1,856.79 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 13,132. .85 11,162.20 1.50 19,698.00 1.00 13,132.00 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 360. 7.50 2,700.00 2.85 1,026.00 6.74 2,426.40 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 330. 6.50 2,145.00 11.00 3,630.00 10.50 3,465.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT 6" WIDE (F) LF 61. 135.00 8,235.00 125.00 7,625.00 12.60 768.60 562.1 SILICONE JOINT SEALANT (F LF 75. 2.00 150.00 20.00 1,500.00 21.00 1,575.00 563.3 BRIDGE RAIL T101 (F) LF 56. 125.00 7,000.00 125.00 7,000.00 176.40 9,878.40 563.84 TEMPORARY BRIDGE RAIL (F) LF 25. 85.00 2,125.00 77.00 1,925.00 36.75 918.75 585.21 STONE FILL, CLASS B (BRIDGE) CY 216. 30.00 6,480.00 30.00 6,480.00 20.62 4,453.92 15266 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 500. 1.50 750.00 2.00 1,000.00 2.41 1,205.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 212.5 15.75 3,346.88 15.00 3,187.50 24.56 5,219.00 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 4. 1,250.00 5,000.00 1,235.00 4,940.00 997.50 3,990.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 6. 1,950.00 11,700.00 1,905.00 11,430.00 1,975.87 11,855.22 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 390. 28.00 10,920.00 20.00 7,800.00 10.50 4,095.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 1,000.00 2,000.00 3,000.00 6,000.00 5,250.00 10,500.00 607.9 RESETTING RAILING AND FENCING LF 995. 2.00 1,990.00 2.00 1,990.00 15.75 15,671.25 609.01 STRAIGHT GRANITE CURB LF 100. 25.00 2,500.00 31.00 3,100.00 26.70 2,670.00 615.03 TRAFFIC SIGN TYPE C (F) SF 12.5 32.50 406.25 77.00 962.50 26.25 328.13 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 100.00 100.00 205.00 205.00 183.75 183.75 616.171 PORTABLE TRAFFIC SIGNALS U 1. 14,500.00 14,500.00 19,780.00 19,780.00 32,041.16 32,041.16 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 618.7 FLAGGERS HR 1,200. 12.00 14,400.00 22.00 26,400.00 29.37 35,244.00 619.1 MAINTENANCE OF TRAFFIC U 1. 16,500.00 16,500.00 12,000.00 12,000.00 13,894.84 13,894.84 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 4.25 51.00 4.10 49.20 5.25 63.00 621.31 SINGLE DELINEATOR WITH POST EA 4. 32.50 130.00 31.00 124.00 36.75 147.00 622.2 CONCRETE BOUNDS EA 4. 340.00 1,360.00 335.00 1,340.00 534.02 2,136.08 628.2 SAWED BITUMINOUS PAVEMENT LF 400. 2.00 800.00 2.00 800.00 3.74 1,496.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 1,800. .80 1,440.00 .50 900.00 1.00 1,800.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 600. 2.00 1,200.00 .60 360.00 .48 288.00 632.1118 PREFORMED RETROREFLECTIVE LF 22. 6.50 143.00 3.85 84.70 4.59 100.98 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 900. 1.00 900.00 .35 315.00 .95 855.00 645.3 EROSION STONE TON 200. 30.00 6,000.00 20.00 4,000.00 21.05 4,210.00 645.455 CHANNEL STABILIZATION - ROOT WADS U 2. 1,000.00 2,000.00 2,500.00 5,000.00 2,670.10 5,340.20 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 300. 5.00 1,500.00 10.00 3,000.00 8.54 2,562.00 645.531 SILT FENCE LF 850. 3.00 2,550.00 4.00 3,400.00 3.15 2,677.50 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,900.00 1,900.00 1,855.00 1,855.00 2,100.00 2,100.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 58.00 5,800.00 57.00 5,700.00 52.50 5,250.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 750. 1.00 750.00 1.05 787.50 5.34 4,005.00 15266 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 105. 15.00 1,575.00 20.00 2,100.00 16.02 1,682.10 692. MOBILIZATION U 1. 83,000.00 83,000.00 50,000.00 50,000.00 120,154.35 120,154.35 698.12 FIELD OFFICE TYPE B MON 12. 200.00 2,400.00 1,600.00 19,200.00 1,335.05 16,020.60 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 2,170.00 2,170.00 2,170.00 2,170.00 2,170.00 2,170.00 $721,953.33 $760,829.98 $790,164.24 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPSOM X-A000(668), 15266 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: FEBRUARY 4, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: THE TOWN LINE BETWEEN EPSOM AND DEERFIELD, NH ROUTE 107 BRIDGE OVER GRIFFIN BROOK COMPLETION DATE: SEPTEMBER 24, 2010 A NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 721,953.33 B ALVIN J. COLEMAN & SON, INC. 9NH ROUTE 113, CONWAY, NH 03818 $ 760,829.98 C THIBEAULT CORP OF N E 603 OLD MAMMOTH RD, LONDONDERRY, NH 03053 $ 790,164.24 D GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 796,059.13 E NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 838,089.90 F R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 891,660.50 G NEW ENGLAND INFRASTRUCTURE, INC. 13 BRENT DR., HUDSON, MA 01749 $ 948,644.50 H T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 997,299.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 306.5 1.65 505.73 7.00 2,145.50 2.00 613.00 203.1 COMMON EXCAVATION CY 600. 9.00 5,400.00 24.00 14,400.00 8.00 4,800.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 900.00 2,700.00 1,000.00 3,000.00 1,950.00 5,850.00 203.6 EMBANKMENT-IN-PLACE (F) CY 65. 1.40 91.00 21.00 1,365.00 11.00 715.00 203.71 REHANDLING EXCAVATED MATERIAL CY 150. 8.50 1,275.00 19.00 2,850.00 5.00 750.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 270. 11.00 2,970.00 24.00 6,480.00 20.00 5,400.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 345. 33.00 11,385.00 29.00 10,005.00 30.00 10,350.00 214. FINE GRADING U 1. 8,000.00 8,000.00 10,000.00 10,000.00 5,000.00 5,000.00 304.1 SAND (F) CY 260. 21.00 5,460.00 35.00 9,100.00 20.00 5,200.00 304.2 GRAVEL (F) CY 235. 21.00 4,935.00 31.00 7,285.00 25.00 5,875.00 304.3 CRUSHED GRAVEL (F) CY 260. 24.00 6,240.00 39.00 10,140.00 28.00 7,280.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 158. 132.00 20,856.00 115.00 18,170.00 140.00 22,120.00 403.6 PAVEMENT JOINT ADHESIVE LF 525. 1.65 866.25 2.50 1,312.50 1.00 525.00 15266 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 40. 132.00 5,280.00 115.00 4,600.00 140.00 5,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 390. 13.00 5,070.00 11.00 4,290.00 10.00 3,900.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 25,000.00 25,000.00 100,000.00 100,000.00 61,500.00 61,500.00 503.101 WATER DIVERSION STRUCTURE U 1. 25,000.00 25,000.00 15,000.00 15,000.00 30,000.00 30,000.00 503.201 COFFERDAMS U 1. 30,000.00 30,000.00 25,000.00 25,000.00 75,000.00 75,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 128,000.00 128,000.00 60,000.00 60,000.00 85,000.00 85,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 795. 29.00 23,055.00 18.00 14,310.00 10.00 7,950.00 504.2 ROCK BRIDGE EXCAVATION CY 60. 380.00 22,800.00 280.00 16,800.00 60.00 3,600.00 508. STRUCTURAL FILL CY 108. 36.00 3,888.00 36.00 3,888.00 50.00 5,400.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 47. 450.00 21,150.00 300.00 14,100.00 350.00 16,450.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 65. 635.00 41,275.00 800.00 52,000.00 800.00 52,000.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 76. 455.00 34,580.00 400.00 30,400.00 350.00 26,600.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 31. 670.00 20,770.00 950.00 29,450.00 1,200.00 37,200.00 520.7004 CONCRETE BRIDGE DECK - TERNARY MIX (F) CY 21. 955.00 20,055.00 870.00 18,270.00 1,200.00 25,200.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 18. 55.00 990.00 50.00 900.00 125.00 2,250.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 10. 50.00 500.00 50.00 500.00 25.00 250.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 59. 5.00 295.00 15.00 885.00 8.00 472.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 40. 10.00 400.00 20.00 800.00 10.00 400.00 544. REINFORCING STEEL (F) LB 11,175. 1.40 15,645.00 1.00 11,175.00 1.50 16,762.50 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 351. 4.60 1,614.60 7.00 2,457.00 5.00 1,755.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 13,132. 1.35 17,728.20 1.20 15,758.40 1.75 22,981.00 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 360. 6.20 2,232.00 9.00 3,240.00 6.00 2,160.00 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 330. 45.00 14,850.00 10.00 3,300.00 15.00 4,950.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT 6" WIDE (F) LF 61. 115.00 7,015.00 100.00 6,100.00 100.00 6,100.00 562.1 SILICONE JOINT SEALANT (F LF 75. 11.20 840.00 5.00 375.00 1.50 112.50 563.3 BRIDGE RAIL T101 (F) LF 56. 132.00 7,392.00 150.00 8,400.00 140.00 7,840.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 25. 88.00 2,200.00 250.00 6,250.00 80.00 2,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 216. 60.00 12,960.00 65.00 14,040.00 40.00 8,640.00 15266 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 500. 1.70 850.00 3.00 1,500.00 2.50 1,250.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 212.5 16.50 3,506.25 18.00 3,825.00 20.00 4,250.00 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 4. 1,320.00 5,280.00 1,300.00 5,200.00 1,650.00 6,600.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 6. 2,035.00 12,210.00 1,850.00 11,100.00 2,100.00 12,600.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 390. 46.00 17,940.00 40.00 15,600.00 30.00 11,700.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 2,100.00 4,200.00 5,000.00 10,000.00 6,000.00 12,000.00 607.9 RESETTING RAILING AND FENCING LF 995. 6.00 5,970.00 12.00 11,940.00 10.00 9,950.00 609.01 STRAIGHT GRANITE CURB LF 100. 30.00 3,000.00 40.00 4,000.00 25.00 2,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 12.5 37.00 462.50 15.00 187.50 80.00 1,000.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 340.00 340.00 50.00 50.00 200.00 200.00 616.171 PORTABLE TRAFFIC SIGNALS U 1. 31,680.00 31,680.00 40,000.00 40,000.00 28,000.00 28,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 618.7 FLAGGERS HR 1,200. 23.00 27,600.00 45.00 54,000.00 22.00 26,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 8,200.00 8,200.00 2,000.00 2,000.00 25,000.00 25,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 4.50 54.00 5.00 60.00 4.50 54.00 621.31 SINGLE DELINEATOR WITH POST EA 4. 33.00 132.00 30.00 120.00 35.00 140.00 622.2 CONCRETE BOUNDS EA 4. 360.00 1,440.00 350.00 1,400.00 360.00 1,440.00 628.2 SAWED BITUMINOUS PAVEMENT LF 400. 2.20 880.00 2.00 800.00 2.00 800.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 1,800. .55 990.00 .40 720.00 .25 450.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 600. 1.35 810.00 1.50 900.00 1.25 750.00 632.1118 PREFORMED RETROREFLECTIVE LF 22. 4.80 105.60 8.00 176.00 5.25 115.50 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 900. .40 360.00 .50 450.00 .60 540.00 645.3 EROSION STONE TON 200. 20.00 4,000.00 50.00 10,000.00 25.00 5,000.00 645.455 CHANNEL STABILIZATION - ROOT WADS U 2. 390.00 780.00 600.00 1,200.00 500.00 1,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 300. 10.50 3,150.00 10.00 3,000.00 8.00 2,400.00 645.531 SILT FENCE LF 850. 3.10 2,635.00 3.00 2,550.00 3.50 2,975.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,000.00 2,000.00 3,000.00 3,000.00 6,500.00 6,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 60.00 6,000.00 50.00 5,000.00 75.00 7,500.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 750. 1.00 750.00 1.20 900.00 1.80 1,350.00 15266 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 105. 19.00 1,995.00 40.00 4,200.00 15.00 1,575.00 692. MOBILIZATION U 1. 38,000.00 38,000.00 20,000.00 20,000.00 75,000.00 75,000.00 698.12 FIELD OFFICE TYPE B MON 12. 650.00 7,800.00 2,000.00 24,000.00 1,200.00 14,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 2,170.00 2,170.00 2,170.00 2,170.00 2,170.00 2,170.00 $796,059.13 $838,089.90 $891,660.50 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: EPSOM X-A000(668), 15266 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: FEBRUARY 4, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: THE TOWN LINE BETWEEN EPSOM AND DEERFIELD, NH ROUTE 107 BRIDGE OVER GRIFFIN BROOK COMPLETION DATE: SEPTEMBER 24, 2010 A NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 721,953.33 B ALVIN J. COLEMAN & SON, INC. 9NH ROUTE 113, CONWAY, NH 03818 $ 760,829.98 C THIBEAULT CORP OF N E 603 OLD MAMMOTH RD, LONDONDERRY, NH 03053 $ 790,164.24 D GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 796,059.13 E NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 838,089.90 F R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 891,660.50 G NEW ENGLAND INFRASTRUCTURE, INC. 13 BRENT DR., HUDSON, MA 01749 $ 948,644.50 H T BUCK CONSTRUCTION, INC. 249 MERROW RD., AUBURN, ME 04210 $ 997,299.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 306.5 5.00 1,532.50 1.50 459.75 203.1 COMMON EXCAVATION CY 600. 25.00 15,000.00 11.00 6,600.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 3. 2,500.00 7,500.00 2,500.00 7,500.00 203.6 EMBANKMENT-IN-PLACE (F) CY 65. 45.00 2,925.00 42.00 2,730.00 203.71 REHANDLING EXCAVATED MATERIAL CY 150. 16.00 2,400.00 21.00 3,150.00 207.3 UNCLASSIFIED CHANNEL EXCAVATION CY 270. 14.00 3,780.00 60.00 16,200.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 345. 45.00 15,525.00 41.00 14,145.00 214. FINE GRADING U 1. 4,000.00 4,000.00 4,500.00 4,500.00 304.1 SAND (F) CY 260. 35.00 9,100.00 30.00 7,800.00 304.2 GRAVEL (F) CY 235. 35.00 8,225.00 38.00 8,930.00 304.3 CRUSHED GRAVEL (F) CY 260. 35.00 9,100.00 38.00 9,880.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 158. 150.00 23,700.00 135.00 21,330.00 403.6 PAVEMENT JOINT ADHESIVE LF 525. 3.00 1,575.00 2.50 1,312.50 15266 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 40. 150.00 6,000.00 135.00 5,400.00 417. COLD PLANING BITUMINOUS SURFACES SY 390. 15.00 5,850.00 14.00 5,460.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 60,000.00 60,000.00 100,000.00 100,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 20,000.00 20,000.00 20,195.45 20,195.45 503.201 COFFERDAMS U 1. 85,000.00 85,000.00 100,000.00 100,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 125,000.00 125,000.00 100,000.00 100,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 795. 30.00 23,850.00 19.00 15,105.00 504.2 ROCK BRIDGE EXCAVATION CY 60. 350.00 21,000.00 140.00 8,400.00 508. STRUCTURAL FILL CY 108. 40.00 4,320.00 75.00 8,100.00 520.0302 CONCRETE CLASS AA, APPROACH SLABS (QC/QA) (F) CY 47. 250.00 11,750.00 300.00 14,100.00 520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 65. 450.00 29,250.00 675.00 43,875.00 520.213 CONCRETE CLASS B, FOOTINGS (ON SOIL) (F) CY 76. 250.00 19,000.00 400.00 30,400.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 31. 1,250.00 38,750.00 1,300.00 40,300.00 520.7004 CONCRETE BRIDGE DECK - TERNARY MIX (F) CY 21. 1,250.00 26,250.00 1,000.00 21,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 18. 20.00 360.00 70.00 1,260.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 10. 18.00 180.00 125.00 1,250.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 59. 8.00 472.00 16.00 944.00 541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 40. 11.00 440.00 21.00 840.00 544. REINFORCING STEEL (F) LB 11,175. 1.00 11,175.00 1.00 11,175.00 544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F LB 351. 4.00 1,404.00 9.00 3,159.00 544.2 REINFORCING STEEL, EPOXY COATED (F) LB 13,132. 1.00 13,132.00 1.40 18,384.80 544.21 REINFORCING STEEL, EPOXY COATED,MECHANICAL CONNECTORS (F) LB 360. 5.00 1,800.00 9.00 3,240.00 544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB 330. 6.00 1,980.00 7.00 2,310.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT 6" WIDE (F) LF 61. 130.00 7,930.00 18.00 1,098.00 562.1 SILICONE JOINT SEALANT (F LF 75. 8.00 600.00 30.00 2,250.00 563.3 BRIDGE RAIL T101 (F) LF 56. 200.00 11,200.00 120.00 6,720.00 563.84 TEMPORARY BRIDGE RAIL (F) LF 25. 30.00 750.00 200.00 5,000.00 585.21 STONE FILL, CLASS B (BRIDGE) CY 216. 40.00 8,640.00 40.00 8,640.00 15266 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 500. 2.00 1,000.00 4.00 2,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 212.5 28.00 5,950.00 15.00 3,187.50 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 4. 1,100.00 4,400.00 1,200.00 4,800.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 6. 2,200.00 13,200.00 1,850.00 11,100.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 390. 50.00 19,500.00 39.00 15,210.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 5,000.00 10,000.00 3,500.00 7,000.00 607.9 RESETTING RAILING AND FENCING LF 995. 5.00 4,975.00 4.00 3,980.00 609.01 STRAIGHT GRANITE CURB LF 100. 35.00 3,500.00 35.00 3,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 12.5 120.00 1,500.00 90.00 1,125.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1. 500.00 500.00 300.00 300.00 616.171 PORTABLE TRAFFIC SIGNALS U 1. 40,000.00 40,000.00 35,000.00 35,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 618.7 FLAGGERS HR 1,200. 20.00 24,000.00 20.00 24,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 3,000.00 3,000.00 7,500.00 7,500.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 12. 6.00 72.00 5.00 60.00 621.31 SINGLE DELINEATOR WITH POST EA 4. 38.00 152.00 40.00 160.00 622.2 CONCRETE BOUNDS EA 4. 200.00 800.00 325.00 1,300.00 628.2 SAWED BITUMINOUS PAVEMENT LF 400. 2.00 800.00 4.00 1,600.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 1,800. 1.00 1,800.00 .75 1,350.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 600. 2.00 1,200.00 .75 450.00 632.1118 PREFORMED RETROREFLECTIVE LF 22. 15.00 330.00 4.00 88.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 900. 1.00 900.00 .40 360.00 645.3 EROSION STONE TON 200. 40.00 8,000.00 37.00 7,400.00 645.455 CHANNEL STABILIZATION - ROOT WADS U 2. 1,000.00 2,000.00 1,500.00 3,000.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 300. 10.00 3,000.00 8.00 2,400.00 645.531 SILT FENCE LF 850. 5.00 4,250.00 3.00 2,550.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,000.00 2,000.00 1,800.00 1,800.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 100. 60.00 6,000.00 55.00 5,500.00 646.31 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS SY 750. 2.00 1,500.00 1.30 975.00 15266 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 105. 40.00 4,200.00 38.00 3,990.00 692. MOBILIZATION U 1. 80,000.00 80,000.00 110,000.00 110,000.00 698.12 FIELD OFFICE TYPE B MON 12. 1,500.00 18,000.00 900.00 10,800.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 2,170.00 2,170.00 2,170.00 2,170.00 $948,644.50 $997,299.00