THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-MANCHESTER A000(126), 13933F COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: MAY 20, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: BROOKDALE ROAD BRIDGE OVER I-93 COMPLETION DATE: JUNE 1, 2012 A S & R CORPORATION 706 BROADWAY STREET, LOWELL, MA 01854 $ 3,777,054.30 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 4,338,718.55 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,474,027.25 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,558,787.10 E GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 4,816,268.71 F SPS NEW ENGLAND, INC. 98 ELM ST., SALISBURY, MA 01952 $ 4,875,830.00 G MIG CORPORATION, INC. ONE ACTON PLACE - SUITE 200, ACTON, MA 01720 $ 5,457,557.70 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.14 5,600.00 11,984.00 20,000.00 42,800.00 4,500.00 9,630.00 201.8822 INVASIVE SPECIES CONTROL TYPE II SY 9,600. .20 1,920.00 2.00 19,200.00 1.00 9,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 30. 29.00 870.00 12.00 360.00 10.00 300.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 940.00 940.00 290.00 290.00 300.00 300.00 202.7 REMOVAL OF GUARDRAIL (F) LF 780. 5.00 3,900.00 2.50 1,950.00 2.00 1,560.00 203.1 COMMON EXCAVATION CY 15,700. 6.00 94,200.00 8.00 125,600.00 5.50 86,350.00 203.2 ROCK EXCAVATION CY 320. 30.00 9,600.00 40.00 12,800.00 50.00 16,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 6. 640.00 3,840.00 1,200.00 7,200.00 1,600.00 9,600.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 3. 640.00 1,920.00 950.00 2,850.00 1,000.00 3,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 952. 2.50 2,380.00 8.00 7,616.00 7.00 6,664.00 206.1 COMMON STRUCTURE EXCAVATION CY 180. 9.00 1,620.00 11.50 2,070.00 10.00 1,800.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 26.00 260.00 85.00 850.00 30.00 300.00 206.2 ROCK STRUCTURE EXCAVATION CY 18. 81.00 1,458.00 68.00 1,224.00 100.00 1,800.00 13933F PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.1 GRANULAR BACKFILL CY 25. 19.00 475.00 35.00 875.00 22.00 550.00 209.2 GRANULAR BACKFILL (BRIDGE) CY 2,090. 15.00 31,350.00 40.00 83,600.00 20.00 41,800.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 129. 15.00 1,935.00 40.00 5,160.00 17.00 2,193.00 214. FINE GRADING U 1. 4,100.00 4,100.00 35,000.00 35,000.00 10,000.00 10,000.00 304.1 SAND (F) CY 879. 24.00 21,096.00 17.00 14,943.00 15.00 13,185.00 304.2 GRAVEL (F) CY 881. 16.00 14,096.00 29.00 25,549.00 17.00 14,977.00 304.3 CRUSHED GRAVEL (F) CY 879. 16.00 14,064.00 32.00 28,128.00 20.00 17,580.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 140. 20.00 2,800.00 36.00 5,040.00 20.00 2,800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 820. 92.00 75,440.00 68.00 55,760.00 68.00 55,760.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 65. 154.00 10,010.00 100.00 6,500.00 110.00 7,150.00 403.6 PAVEMENT JOINT ADHESIVE LF 8,000. 1.00 8,000.00 .24 1,920.00 .24 1,920.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 57. 150.00 8,550.00 125.00 7,125.00 175.00 9,975.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,900. 92.00 174,800.00 68.00 129,200.00 68.00 129,200.00 417. COLD PLANING BITUMINOUS SURFACES SY 6,350. 6.50 41,275.00 2.10 13,335.00 2.20 13,970.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 250,000.00 250,000.00 128,000.00 128,000.00 275,000.00 275,000.00 503.201 COFFERDAMS U 1. 141,600.00 141,600.00 115,000.00 115,000.00 175,000.00 175,000.00 503.202 COFFERDAMS U 1. 82,000.00 82,000.00 35,000.00 35,000.00 25,000.00 25,000.00 503.203 COFFERDAMS U 1. 82,000.00 82,000.00 75,000.00 75,000.00 125,000.00 125,000.00 504.101 COMMON BRIDGE EXCAVATION CY 3,020. 9.00 27,180.00 14.00 42,280.00 17.00 51,340.00 508. STRUCTURAL FILL CY 239. 32.00 7,648.00 40.00 9,560.00 21.00 5,019.00 510.1 PILE DRIVING EQUIPMENT U 1. 7,900.00 7,900.00 40,000.00 40,000.00 20,000.00 20,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 31,800. 1.00 31,800.00 .48 15,264.00 1.00 31,800.00 510.9 PILE SPLICES EA 5. 460.00 2,300.00 50.00 250.00 500.00 2,500.00 520.01007 CONCRETE CLASS AA (PRECAST OPTION) (F) CY 117. 400.00 46,800.00 925.00 108,225.00 400.00 46,800.00 520.01027 CONCRETE CLASS AA (QC/QA) (PRECAST OPTION) (F) CY 43. 564.00 24,252.00 1,150.00 49,450.00 1,500.00 64,500.00 520.03027 CONCRETE, CLASS AA, APPROACH SLABS (QC/QA) (PRECAST OPTION) (F) CY 52. 194.00 10,088.00 325.00 16,900.00 300.00 15,600.00 520.21097 CONCRETE CLASS B (MOD), FOOTINGS (ON SOIL) (PRECAST OPTION) (F) CY 75. 215.00 16,125.00 340.00 25,500.00 300.00 22,500.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 251. 470.00 117,970.00 500.00 125,500.00 650.00 163,150.00 528.51 PRESTRESSED CONCRETE DECK PANELS (F) SF 7,752. 9.00 69,768.00 12.50 96,900.00 20.00 155,040.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 90. 44.00 3,960.00 60.00 5,400.00 75.00 6,750.00 13933F PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 20. 38.00 760.00 40.00 800.00 50.00 1,000.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 19. 26.00 494.00 20.00 380.00 20.00 380.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 995. 26.00 25,870.00 20.00 19,900.00 20.00 19,900.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 56. 1.40 78.40 5.00 280.00 5.00 280.00 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 17,840. 1.00 17,840.00 1.40 24,976.00 .85 15,164.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 91,623. 1.00 91,623.00 1.05 96,204.15 1.25 114,528.75 547. SHEAR CONNECTORS (F) EA 2,168. 5.00 10,840.00 4.50 9,756.00 4.00 8,672.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 12. 2,100.00 25,200.00 2,000.00 24,000.00 2,000.00 24,000.00 550.1 STRUCTURAL STEEL (F) LB 367,069. 2.00 734,138.00 1.60 587,310.40 1.70 624,017.30 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 67. 424.00 28,408.00 410.00 27,470.00 600.00 40,200.00 562.1 SILICONE JOINT SEALANT (F LF 102. 8.00 816.00 10.00 1,020.00 20.00 2,040.00 563.22 BRIDGE RAIL T2 (F) LF 629. 140.00 88,060.00 120.00 75,480.00 125.00 78,625.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 507. 40.00 20,280.00 38.50 19,519.50 35.00 17,745.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 117. 231.00 27,027.00 142.00 16,614.00 150.00 17,550.00 585.2 STONE FILL, CLASS B CY 420. 51.00 21,420.00 34.00 14,280.00 17.00 7,140.00 585.3 STONE FILL, CLASS C CY 462. 26.00 12,012.00 35.00 16,170.00 17.00 7,854.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 3,870. 48.00 185,760.00 45.00 174,150.00 50.00 193,500.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 210. 2.50 525.00 4.00 840.00 2.20 462.00 603.00212 12" R.C. PIPE, 2000D LF 230. 28.00 6,440.00 34.00 7,820.00 30.00 6,900.00 603.00215 15" R.C. PIPE, 2000D LF 180. 31.00 5,580.00 38.00 6,840.00 35.00 6,300.00 603.00312 12" R.C. PIPE, 3000D LF 20. 28.00 560.00 37.00 740.00 48.00 960.00 603.00315 15" R.C. PIPE, 3000D LF 150. 32.00 4,800.00 42.00 6,300.00 45.00 6,750.00 603.30115 15" R.C. END SECTIONS EA 1. 580.00 580.00 510.00 510.00 550.00 550.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 3. 320.00 960.00 275.00 825.00 400.00 1,200.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 180. 13.00 2,340.00 34.00 6,120.00 35.00 6,300.00 604.0007 POLYETHYLENE LINER EA 8. 110.00 880.00 200.00 1,600.00 200.00 1,600.00 604.12 CATCH BASINS TYPE B U 2. 2,470.00 4,940.00 1,850.00 3,700.00 2,400.00 4,800.00 604.15 CATCH BASINS TYPE E U 5. 2,040.00 10,200.00 2,050.00 10,250.00 1,900.00 9,500.00 604.16 CATCH BASINS TYPE F U 6. 2,085.00 12,510.00 1,950.00 11,700.00 2,250.00 13,500.00 604.18 CATCH BASINS, WITH FRAMES AND GRATES FURNISHED BY OTHERS U 2. 1,770.00 3,540.00 1,670.00 3,340.00 1,800.00 3,600.00 604.32 DRAINAGE MANHOLES U 3. 2,400.00 7,200.00 1,750.00 5,250.00 2,000.00 6,000.00 13933F PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 605.79 UNDERDRAIN FLUSHING BASINS EA 3. 225.00 675.00 340.00 1,020.00 600.00 1,800.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,000. 8.00 8,000.00 17.50 17,500.00 15.00 15,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 512.5 26.00 13,325.00 20.00 10,250.00 20.00 10,250.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 26.00 5,850.00 20.00 4,500.00 20.00 4,500.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 31.00 1,162.50 24.00 900.00 25.00 937.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 6. 2,453.00 14,718.00 1,950.00 11,700.00 2,000.00 12,000.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,940.00 5,820.00 1,550.00 4,650.00 1,000.00 3,000.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 542.00 1,626.00 450.00 1,350.00 500.00 1,500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,830. 6.00 10,980.00 20.00 36,600.00 20.00 36,600.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,680.00 1,680.00 1,200.00 1,200.00 1,500.00 1,500.00 606.91 RESETTING OR SETTING GUARDRAIL LF 1,350. 9.00 12,150.00 7.00 9,450.00 7.17 9,679.50 606.93 TEMPORARY BEAM GUARDRAIL LF 1,450. 10.00 14,500.00 8.00 11,600.00 8.18 11,861.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 4,500.00 9,000.00 4,200.00 8,400.00 3,500.00 7,000.00 606.9614 TEMPORARY SINGLE FACED TRANSITION RAIL, WOOD POSTS U 2. 22.00 44.00 1,800.00 3,600.00 2,000.00 4,000.00 607.655 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 5 FEET HIGH LF 550. 22.00 12,100.00 17.00 9,350.00 22.00 12,100.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 5. 185.00 925.00 140.00 700.00 200.00 1,000.00 609.01 STRAIGHT GRANITE CURB LF 160. 25.00 4,000.00 18.00 2,880.00 25.00 4,000.00 609.8111 BITUMINOUS CURB, TYPE CAPE COD (4" REVEAL) LF 600. 6.00 3,600.00 3.50 2,100.00 4.00 2,400.00 611.8204 4" DRY STANDPIPE (BRIDGE) U 1. 6,800.00 6,800.00 10,000.00 10,000.00 6,500.00 6,500.00 614.331 3" STEEL CONDUIT LF 15. 32.00 480.00 23.00 345.00 16.00 240.00 614.342 4" 2-DUCT STEEL CONDUIT LF 84. 36.00 3,024.00 26.00 2,184.00 50.00 4,200.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 312. 50.00 15,600.00 41.00 12,792.00 70.00 21,840.00 614.512 CONCRETE PULL BOX 18" EA 3. 360.00 1,080.00 400.00 1,200.00 400.00 1,200.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 12.00 3,120.00 7.50 1,950.00 7.00 1,820.00 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 14.00 3,640.00 8.50 2,210.00 7.50 1,950.00 614.7428 4" 2- DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 72. 22.00 1,584.00 17.00 1,224.00 20.00 1,440.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 1. 2,380.00 2,380.00 8,000.00 8,000.00 8,500.00 8,500.00 13933F PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.03 TRAFFIC SIGN TYPE C (F) SF 48.3 48.00 2,318.40 70.00 3,381.00 50.00 2,415.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 4. 256.00 1,024.00 150.00 600.00 1.00 4.00 615.303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN U 1. 960.00 960.00 1,500.00 1,500.00 1,000.00 1,000.00 616.171 PORTABLE TRAFFIC U 1. 60,000.00 60,000.00 50,000.00 50,000.00 50,000.00 50,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 618.7 FLAGGERS HR 1,000. 21.00 21,000.00 16.00 16,000.00 10.00 10,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 75,000.00 75,000.00 60,000.00 60,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 4. 3,500.00 14,000.00 7,500.00 30,000.00 15,000.00 60,000.00 622.2 CONCRETE BOUNDS EA 1. 190.00 190.00 250.00 250.00 200.00 200.00 622.4 STONE BOUNDS EA 9. 190.00 1,710.00 250.00 2,250.00 250.00 2,250.00 628.2 SAWED BITUMINOUS PAVEMENT LF 7,300. 1.00 7,300.00 .75 5,475.00 2.00 14,600.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 21,500. .20 4,300.00 .12 2,580.00 .12 2,580.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 21,500. .20 4,300.00 .15 3,225.00 .12 2,580.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 50. 12.00 600.00 2.75 137.50 3.00 150.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,800. .64 1,792.00 .35 980.00 .35 980.00 641. LOAM CY 235. 22.00 5,170.00 21.00 4,935.00 20.00 4,700.00 645.119 MULCH WITH TACKIFIERS A .5 3,300.00 1,650.00 1,100.00 550.00 1,800.00 900.00 645.3 EROSION STONE TON 3,600. 12.00 43,200.00 23.00 82,800.00 20.00 72,000.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 14,850. 1.00 14,850.00 1.20 17,820.00 1.25 18,562.50 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 8,750. 1.20 10,500.00 1.20 10,500.00 1.25 10,937.50 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 500. 1.50 750.00 3.00 1,500.00 3.25 1,625.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 550. 18.00 9,900.00 31.00 17,050.00 20.00 11,000.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 550. 18.00 9,900.00 21.00 11,550.00 10.00 5,500.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 800. 7.00 5,600.00 8.00 6,400.00 8.00 6,400.00 645.531 SILT FENCE LF 5,750. .82 4,715.00 2.50 14,375.00 3.25 18,687.50 645.532 SILT FENCE WITH SUPPORT FENCE LF 550. 1.72 946.00 7.00 3,850.00 7.00 3,850.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 2,000.00 2,000.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 300. 100.00 30,000.00 45.00 13,500.00 50.00 15,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.9 2,000.00 3,800.00 1,600.00 3,040.00 1,625.00 3,087.50 13933F PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 640. 25.00 16,000.00 18.00 11,520.00 12.00 7,680.00 647.16 HUMUS, 6" DEEP CY 80. 25.00 2,000.00 14.00 1,120.00 12.00 960.00 650.2 LANDSCAPING U 1. 1,280.00 1,280.00 1.00 1.00 .01 .01 651.34061 PICEA GLAUCA WHITE SPRUCE 6 FT B&B EA 4. 380.00 1,520.00 270.00 1,080.00 295.00 1,180.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 15,000.00 15,000.00 125,000.00 125,000.00 150,000.00 150,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 15,000.00 15,000.00 130,000.00 130,000.00 150,000.00 150,000.00 670.0491 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 45,000.00 45,000.00 50,000.00 50,000.00 670.0492 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 45,000.00 45,000.00 50,000.00 50,000.00 670.0493 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 35,000.00 35,000.00 50,000.00 50,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 140.00 420.00 175.00 525.00 150.00 450.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 240.00 240.00 250.00 250.00 300.00 300.00 692. MOBILIZATION U 1. 42,300.00 42,300.00 275,000.00 275,000.00 158,899.19 158,899.19 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.11913 FIELD OFFICE (EQUIPMENT & SUPPLIES) MON 25. 1,200.00 30,000.00 1,000.00 25,000.00 250.00 6,250.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.24 ALTERATIONS AND ADDITIONS AS NEEDED - PAVEMENT PATCH $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 $3,777,054.30 $4,338,718.55 $4,474,027.25 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-MANCHESTER A000(126), 13933F COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: MAY 20, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: BROOKDALE ROAD BRIDGE OVER I-93 COMPLETION DATE: JUNE 1, 2012 A S & R CORPORATION 706 BROADWAY STREET, LOWELL, MA 01854 $ 3,777,054.30 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 4,338,718.55 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,474,027.25 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,558,787.10 E GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 4,816,268.71 F SPS NEW ENGLAND, INC. 98 ELM ST., SALISBURY, MA 01952 $ 4,875,830.00 G MIG CORPORATION, INC. ONE ACTON PLACE - SUITE 200, ACTON, MA 01720 $ 5,457,557.70 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.14 6,500.00 13,910.00 12,000.00 25,680.00 6,500.00 13,910.00 201.8822 INVASIVE SPECIES CONTROL TYPE II SY 9,600. 1.50 14,400.00 1.00 9,600.00 14.00 134,400.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 30. 20.00 600.00 14.50 435.00 12.00 360.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 250.00 250.00 435.00 435.00 350.00 350.00 202.7 REMOVAL OF GUARDRAIL (F) LF 780. 1.60 1,248.00 4.40 3,432.00 5.00 3,900.00 203.1 COMMON EXCAVATION CY 15,700. 6.00 94,200.00 10.35 162,495.00 6.00 94,200.00 203.2 ROCK EXCAVATION CY 320. 50.00 16,000.00 10.35 3,312.00 80.00 25,600.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 6. 1,200.00 7,200.00 2,025.00 12,150.00 1,700.00 10,200.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 3. 1,200.00 3,600.00 1,350.00 4,050.00 1,100.00 3,300.00 203.6 EMBANKMENT-IN-PLACE (F) CY 952. 3.00 2,856.00 6.15 5,854.80 7.50 7,140.00 206.1 COMMON STRUCTURE EXCAVATION CY 180. 9.50 1,710.00 12.80 2,304.00 11.00 1,980.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 15.00 150.00 35.00 350.00 34.00 340.00 206.2 ROCK STRUCTURE EXCAVATION CY 18. 50.00 900.00 35.00 630.00 100.00 1,800.00 13933F PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.1 GRANULAR BACKFILL CY 25. 28.00 700.00 35.00 875.00 24.00 600.00 209.2 GRANULAR BACKFILL (BRIDGE) CY 2,090. 32.00 66,880.00 17.50 36,575.00 22.00 45,980.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 129. 32.00 4,128.00 35.00 4,515.00 18.00 2,322.00 214. FINE GRADING U 1. 8,500.00 8,500.00 5,350.00 5,350.00 3,000.00 3,000.00 304.1 SAND (F) CY 879. 28.00 24,612.00 25.70 22,590.30 17.00 14,943.00 304.2 GRAVEL (F) CY 881. 28.00 24,668.00 23.50 20,703.50 19.00 16,739.00 304.3 CRUSHED GRAVEL (F) CY 879. 30.00 26,370.00 23.50 20,656.50 22.00 19,338.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 140. 34.00 4,760.00 23.50 3,290.00 22.00 3,080.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 820. 70.00 57,400.00 78.00 63,960.00 75.00 61,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 65. 115.00 7,475.00 132.00 8,580.00 130.00 8,450.00 403.6 PAVEMENT JOINT ADHESIVE LF 8,000. .50 4,000.00 .26 2,080.00 1.00 8,000.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 57. 180.00 10,260.00 132.00 7,524.00 180.00 10,260.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,900. 70.00 133,000.00 78.00 148,200.00 80.00 152,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 6,350. 2.50 15,875.00 7.00 44,450.00 4.00 25,400.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 250,000.00 250,000.00 193,000.00 193,000.00 250,000.00 250,000.00 503.201 COFFERDAMS U 1. 110,000.00 110,000.00 150,000.00 150,000.00 100,000.00 100,000.00 503.202 COFFERDAMS U 1. 40,000.00 40,000.00 60,000.00 60,000.00 100,000.00 100,000.00 503.203 COFFERDAMS U 1. 100,000.00 100,000.00 85,000.00 85,000.00 150,000.00 150,000.00 504.101 COMMON BRIDGE EXCAVATION CY 3,020. 6.00 18,120.00 11.50 34,730.00 19.00 57,380.00 508. STRUCTURAL FILL CY 239. 50.00 11,950.00 36.00 8,604.00 23.00 5,497.00 510.1 PILE DRIVING EQUIPMENT U 1. 25,000.00 25,000.00 40,000.00 40,000.00 45,000.00 45,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 31,800. .58 18,444.00 .60 19,080.00 .75 23,850.00 510.9 PILE SPLICES EA 5. 250.00 1,250.00 220.00 1,100.00 100.00 500.00 520.01007 CONCRETE CLASS AA (PRECAST OPTION) (F) CY 117. 500.00 58,500.00 470.00 54,990.00 750.00 87,750.00 520.01027 CONCRETE CLASS AA (QC/QA) (PRECAST OPTION) (F) CY 43. 800.00 34,400.00 620.00 26,660.00 1,100.00 47,300.00 520.03027 CONCRETE, CLASS AA, APPROACH SLABS (QC/QA) (PRECAST OPTION) (F) CY 52. 275.00 14,300.00 255.00 13,260.00 270.00 14,040.00 520.21097 CONCRETE CLASS B (MOD), FOOTINGS (ON SOIL) (PRECAST OPTION) (F) CY 75. 250.00 18,750.00 255.00 19,125.00 250.00 18,750.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 251. 750.00 188,250.00 428.00 107,428.00 885.00 222,135.00 528.51 PRESTRESSED CONCRETE DECK PANELS (F) SF 7,752. 15.00 116,280.00 20.80 161,241.60 13.00 100,776.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 90. 90.00 8,100.00 44.00 3,960.00 75.00 6,750.00 13933F PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 20. 25.00 500.00 61.00 1,220.00 22.00 440.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 19. 25.00 475.00 20.00 380.00 115.00 2,185.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 995. 20.00 19,900.00 20.00 19,900.00 21.00 20,895.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 56. 10.00 560.00 2.00 112.00 5.00 280.00 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 17,840. 1.00 17,840.00 1.33 23,727.20 1.10 19,624.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 91,623. 1.10 100,785.30 1.07 98,036.61 1.25 114,528.75 547. SHEAR CONNECTORS (F) EA 2,168. 3.75 8,130.00 3.80 8,238.40 3.00 6,504.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 12. 2,000.00 24,000.00 2,300.00 27,600.00 2,000.00 24,000.00 550.1 STRUCTURAL STEEL (F) LB 367,069. 1.70 624,017.30 1.65 605,663.85 1.70 624,017.30 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 67. 480.00 32,160.00 395.00 26,465.00 475.00 31,825.00 562.1 SILICONE JOINT SEALANT (F LF 102. 30.00 3,060.00 21.00 2,142.00 27.00 2,754.00 563.22 BRIDGE RAIL T2 (F) LF 629. 105.00 66,045.00 124.00 77,996.00 120.00 75,480.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 507. 41.00 20,787.00 42.00 21,294.00 40.00 20,280.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 117. 165.00 19,305.00 155.00 18,135.00 150.00 17,550.00 585.2 STONE FILL, CLASS B CY 420. 30.00 12,600.00 30.00 12,600.00 19.00 7,980.00 585.3 STONE FILL, CLASS C CY 462. 30.00 13,860.00 33.00 15,246.00 19.00 8,778.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 3,870. 44.00 170,280.00 42.65 165,055.50 45.00 174,150.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 210. 2.50 525.00 1.65 346.50 2.50 525.00 603.00212 12" R.C. PIPE, 2000D LF 230. 30.00 6,900.00 40.00 9,200.00 35.00 8,050.00 603.00215 15" R.C. PIPE, 2000D LF 180. 32.00 5,760.00 42.40 7,632.00 40.00 7,200.00 603.00312 12" R.C. PIPE, 3000D LF 20. 30.00 600.00 40.00 800.00 53.00 1,060.00 603.00315 15" R.C. PIPE, 3000D LF 150. 32.00 4,800.00 43.00 6,450.00 50.00 7,500.00 603.30115 15" R.C. END SECTIONS EA 1. 500.00 500.00 400.00 400.00 600.00 600.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 3. 375.00 1,125.00 350.00 1,050.00 450.00 1,350.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 180. 32.00 5,760.00 35.00 6,300.00 38.00 6,840.00 604.0007 POLYETHYLENE LINER EA 8. 220.00 1,760.00 200.00 1,600.00 220.00 1,760.00 604.12 CATCH BASINS TYPE B U 2. 1,300.00 2,600.00 1,150.00 2,300.00 1,600.00 3,200.00 604.15 CATCH BASINS TYPE E U 5. 1,400.00 7,000.00 1,525.00 7,625.00 2,100.00 10,500.00 604.16 CATCH BASINS TYPE F U 6. 1,600.00 9,600.00 1,400.00 8,400.00 2,500.00 15,000.00 604.18 CATCH BASINS, WITH FRAMES AND GRATES FURNISHED BY OTHERS U 2. 1,100.00 2,200.00 950.00 1,900.00 2,100.00 4,200.00 604.32 DRAINAGE MANHOLES U 3. 2,200.00 6,600.00 1,220.00 3,660.00 2,200.00 6,600.00 13933F PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 605.79 UNDERDRAIN FLUSHING BASINS EA 3. 250.00 750.00 415.00 1,245.00 650.00 1,950.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,000. 15.00 15,000.00 18.50 18,500.00 17.00 17,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 512.5 20.00 10,250.00 22.70 11,633.75 22.00 11,275.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 21.00 4,725.00 22.70 5,107.50 22.00 4,950.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 26.00 975.00 27.00 1,012.50 25.00 937.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 6. 2,200.00 13,200.00 2,100.00 12,600.00 2,000.00 12,000.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,950.00 5,850.00 1,660.00 4,980.00 1,600.00 4,800.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 650.00 1,950.00 465.00 1,395.00 450.00 1,350.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,830. 28.00 51,240.00 46.30 84,729.00 23.00 42,090.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,250.00 1,250.00 1,450.00 1,450.00 1,400.00 1,400.00 606.91 RESETTING OR SETTING GUARDRAIL LF 1,350. 12.50 16,875.00 7.90 10,665.00 8.00 10,800.00 606.93 TEMPORARY BEAM GUARDRAIL LF 1,450. 15.00 21,750.00 9.00 13,050.00 9.00 13,050.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 4,800.00 9,600.00 3,220.00 6,440.00 2,500.00 5,000.00 606.9614 TEMPORARY SINGLE FACED TRANSITION RAIL, WOOD POSTS U 2. 3,650.00 7,300.00 2,000.00 4,000.00 1,100.00 2,200.00 607.655 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 5 FEET HIGH LF 550. 26.50 14,575.00 23.75 13,062.50 18.00 9,900.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 5. 250.00 1,250.00 235.00 1,175.00 150.00 750.00 609.01 STRAIGHT GRANITE CURB LF 160. 26.00 4,160.00 27.50 4,400.00 23.00 3,680.00 609.8111 BITUMINOUS CURB, TYPE CAPE COD (4" REVEAL) LF 600. 4.50 2,700.00 5.00 3,000.00 5.50 3,300.00 611.8204 4" DRY STANDPIPE (BRIDGE) U 1. 6,500.00 6,500.00 7,120.00 7,120.00 7,500.00 7,500.00 614.331 3" STEEL CONDUIT LF 15. 17.00 255.00 27.50 412.50 20.00 300.00 614.342 4" 2-DUCT STEEL CONDUIT LF 84. 55.00 4,620.00 30.80 2,587.20 60.00 5,040.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 312. 75.00 23,400.00 43.00 13,416.00 85.00 26,520.00 614.512 CONCRETE PULL BOX 18" EA 3. 425.00 1,275.00 540.00 1,620.00 475.00 1,425.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 7.50 1,950.00 10.45 2,717.00 8.00 2,080.00 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 8.00 2,080.00 11.80 3,068.00 8.50 2,210.00 614.7428 4" 2- DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 72. 22.00 1,584.00 18.70 1,346.40 22.00 1,584.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 1. 9,000.00 9,000.00 9,350.00 9,350.00 7,000.00 7,000.00 13933F PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.03 TRAFFIC SIGN TYPE C (F) SF 48.3 75.00 3,622.50 77.00 3,719.10 70.00 3,381.00 615.033 REMOVING TRAFFIC SIGN, TYPE C U 4. 160.00 640.00 165.00 660.00 135.00 540.00 615.303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN U 1. 1,600.00 1,600.00 1,650.00 1,650.00 700.00 700.00 616.171 PORTABLE TRAFFIC U 1. 50,000.00 50,000.00 70,000.00 70,000.00 65,000.00 65,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 618.7 FLAGGERS HR 1,000. 22.00 22,000.00 18.00 18,000.00 .01 10.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 80,000.00 80,000.00 65,000.00 65,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 4. 12,000.00 48,000.00 20,500.00 82,000.00 500.00 2,000.00 622.2 CONCRETE BOUNDS EA 1. 350.00 350.00 270.00 270.00 300.00 300.00 622.4 STONE BOUNDS EA 9. 350.00 3,150.00 270.00 2,430.00 425.00 3,825.00 628.2 SAWED BITUMINOUS PAVEMENT LF 7,300. 1.00 7,300.00 .70 5,110.00 2.25 16,425.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 21,500. .13 2,795.00 .13 2,795.00 .15 3,225.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 21,500. .16 3,440.00 .17 3,655.00 .17 3,655.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 50. 3.00 150.00 3.30 165.00 10.00 500.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,800. .40 1,120.00 .39 1,092.00 .55 1,540.00 641. LOAM CY 235. 25.00 5,875.00 25.00 5,875.00 23.00 5,405.00 645.119 MULCH WITH TACKIFIERS A .5 950.00 475.00 1,980.00 990.00 1,950.00 975.00 645.3 EROSION STONE TON 3,600. 22.00 79,200.00 23.00 82,800.00 22.00 79,200.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 14,850. 1.75 25,987.50 1.40 20,790.00 1.50 22,275.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 8,750. 1.25 10,937.50 1.40 12,250.00 1.50 13,125.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 500. 3.00 1,500.00 3.60 1,800.00 7.00 3,500.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 550. 25.00 13,750.00 22.00 12,100.00 22.00 12,100.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 550. 25.00 13,750.00 24.50 13,475.00 12.00 6,600.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 800. 8.00 6,400.00 8.50 6,800.00 9.00 7,200.00 645.531 SILT FENCE LF 5,750. 3.00 17,250.00 2.90 16,675.00 3.50 20,125.00 645.532 SILT FENCE WITH SUPPORT FENCE LF 550. 4.00 2,200.00 5.35 2,942.50 8.00 4,400.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 7,500.00 7,500.00 6,500.00 6,500.00 3,500.00 3,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 300. 55.00 16,500.00 64.00 19,200.00 52.00 15,600.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.9 1,500.00 2,850.00 1,790.00 3,401.00 1,750.00 3,325.00 13933F PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 640. 8.00 5,120.00 21.00 13,440.00 14.00 8,960.00 647.16 HUMUS, 6" DEEP CY 80. 8.00 640.00 37.00 2,960.00 14.00 1,120.00 650.2 LANDSCAPING U 1. 1,000.00 1,000.00 1.00 1.00 1.45 1.45 651.34061 PICEA GLAUCA WHITE SPRUCE 6 FT B&B EA 4. 260.00 1,040.00 325.00 1,300.00 350.00 1,400.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 120,000.00 120,000.00 185,000.00 185,000.00 175,000.00 175,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 115,000.00 115,000.00 185,000.00 185,000.00 185,000.00 185,000.00 670.0491 CONSTRUCT ACCESS LANES U 1. 60,000.00 60,000.00 95,700.00 95,700.00 65,000.00 65,000.00 670.0492 CONSTRUCT ACCESS LANES U 1. 45,000.00 45,000.00 103,000.00 103,000.00 55,000.00 55,000.00 670.0493 CONSTRUCT ACCESS LANES U 1. 40,000.00 40,000.00 86,700.00 86,700.00 55,000.00 55,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 250.00 750.00 275.00 825.00 75.00 225.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 300.00 300.00 385.00 385.00 125.00 125.00 692. MOBILIZATION U 1. 290,000.00 290,000.00 250,000.00 250,000.00 235,000.00 235,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 698.11913 FIELD OFFICE (EQUIPMENT & SUPPLIES) MON 25. 500.00 12,500.00 360.00 9,000.00 800.00 20,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.24 ALTERATIONS AND ADDITIONS AS NEEDED - PAVEMENT PATCH $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 $4,558,787.10 $4,816,268.71 $4,875,830.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: SALEM-MANCHESTER A000(126), 13933F COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: MAY 20, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: BROOKDALE ROAD BRIDGE OVER I-93 COMPLETION DATE: JUNE 1, 2012 A S & R CORPORATION 706 BROADWAY STREET, LOWELL, MA 01854 $ 3,777,054.30 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 4,338,718.55 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,474,027.25 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,558,787.10 E GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 4,816,268.71 F SPS NEW ENGLAND, INC. 98 ELM ST., SALISBURY, MA 01952 $ 4,875,830.00 G MIG CORPORATION, INC. ONE ACTON PLACE - SUITE 200, ACTON, MA 01720 $ 5,457,557.70 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 2.14 8,000.00 17,120.00 201.8822 INVASIVE SPECIES CONTROL TYPE II SY 9,600. 1.00 9,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 30. 12.00 360.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 220.00 220.00 202.7 REMOVAL OF GUARDRAIL (F) LF 780. 3.35 2,613.00 203.1 COMMON EXCAVATION CY 15,700. 9.00 141,300.00 203.2 ROCK EXCAVATION CY 320. 30.00 9,600.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 6. 800.00 4,800.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 3. 500.00 1,500.00 203.6 EMBANKMENT-IN-PLACE (F) CY 952. 10.00 9,520.00 206.1 COMMON STRUCTURE EXCAVATION CY 180. 33.00 5,940.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 40.00 400.00 206.2 ROCK STRUCTURE EXCAVATION CY 18. 50.00 900.00 13933F PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 209.1 GRANULAR BACKFILL CY 25. 40.00 1,000.00 209.2 GRANULAR BACKFILL (BRIDGE) CY 2,090. 32.00 66,880.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 129. 35.00 4,515.00 214. FINE GRADING U 1. 12,000.00 12,000.00 304.1 SAND (F) CY 879. 28.00 24,612.00 304.2 GRAVEL (F) CY 881. 30.00 26,430.00 304.3 CRUSHED GRAVEL (F) CY 879. 33.00 29,007.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 140. 45.00 6,300.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 820. 72.00 59,040.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 65. 230.00 14,950.00 403.6 PAVEMENT JOINT ADHESIVE LF 8,000. .25 2,000.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 57. 122.00 6,954.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,900. 72.00 136,800.00 417. COLD PLANING BITUMINOUS SURFACES SY 6,350. 3.50 22,225.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 300,000.00 300,000.00 503.201 COFFERDAMS U 1. 100,000.00 100,000.00 503.202 COFFERDAMS U 1. 100,000.00 100,000.00 503.203 COFFERDAMS U 1. 100,000.00 100,000.00 504.101 COMMON BRIDGE EXCAVATION CY 3,020. 15.00 45,300.00 508. STRUCTURAL FILL CY 239. 40.00 9,560.00 510.1 PILE DRIVING EQUIPMENT U 1. 50,000.00 50,000.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 31,800. .80 25,440.00 510.9 PILE SPLICES EA 5. 1.00 5.00 520.01007 CONCRETE CLASS AA (PRECAST OPTION) (F) CY 117. 550.00 64,350.00 520.01027 CONCRETE CLASS AA (QC/QA) (PRECAST OPTION) (F) CY 43. 625.00 26,875.00 520.03027 CONCRETE, CLASS AA, APPROACH SLABS (QC/QA) (PRECAST OPTION) (F) CY 52. 315.00 16,380.00 520.21097 CONCRETE CLASS B (MOD), FOOTINGS (ON SOIL) (PRECAST OPTION) (F) CY 75. 255.00 19,125.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 251. 755.00 189,505.00 528.51 PRESTRESSED CONCRETE DECK PANELS (F) SF 7,752. 18.00 139,536.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 90. 88.00 7,920.00 13933F PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 20. 40.00 800.00 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 19. 20.00 380.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 995. 19.00 18,905.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 56. 10.00 560.00 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 17,840. .90 16,056.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 91,623. .90 82,460.70 547. SHEAR CONNECTORS (F) EA 2,168. 4.00 8,672.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 12. 2,150.00 25,800.00 550.1 STRUCTURAL STEEL (F) LB 367,069. 1.60 587,310.40 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 67. 450.00 30,150.00 562.1 SILICONE JOINT SEALANT (F LF 102. 10.00 1,020.00 563.22 BRIDGE RAIL T2 (F) LF 629. 100.00 62,900.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 507. 40.00 20,280.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 117. 145.00 16,965.00 585.2 STONE FILL, CLASS B CY 420. 55.00 23,100.00 585.3 STONE FILL, CLASS C CY 462. 50.00 23,100.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 3,870. 55.00 212,850.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 210. 2.50 525.00 603.00212 12" R.C. PIPE, 2000D LF 230. 30.00 6,900.00 603.00215 15" R.C. PIPE, 2000D LF 180. 35.00 6,300.00 603.00312 12" R.C. PIPE, 3000D LF 20. 45.00 900.00 603.00315 15" R.C. PIPE, 3000D LF 150. 45.00 6,750.00 603.30115 15" R.C. END SECTIONS EA 1. 550.00 550.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 3. 550.00 1,650.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 180. 35.00 6,300.00 604.0007 POLYETHYLENE LINER EA 8. 220.00 1,760.00 604.12 CATCH BASINS TYPE B U 2. 2,150.00 4,300.00 604.15 CATCH BASINS TYPE E U 5. 2,150.00 10,750.00 604.16 CATCH BASINS TYPE F U 6. 2,250.00 13,500.00 604.18 CATCH BASINS, WITH FRAMES AND GRATES FURNISHED BY OTHERS U 2. 1,075.00 2,150.00 604.32 DRAINAGE MANHOLES U 3. 2,200.00 6,600.00 13933F PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 605.79 UNDERDRAIN FLUSHING BASINS EA 3. 1,400.00 4,200.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,000. 20.00 20,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 512.5 21.00 10,762.50 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 21.00 4,725.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 25.00 937.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 6. 2,000.00 12,000.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,550.00 4,650.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 450.00 1,350.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,830. 45.00 82,350.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,330.00 1,330.00 606.91 RESETTING OR SETTING GUARDRAIL LF 1,350. 7.50 10,125.00 606.93 TEMPORARY BEAM GUARDRAIL LF 1,450. 8.50 12,325.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 4,200.00 8,400.00 606.9614 TEMPORARY SINGLE FACED TRANSITION RAIL, WOOD POSTS U 2. 2,000.00 4,000.00 607.655 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 5 FEET HIGH LF 550. 22.00 12,100.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 5. 220.00 1,100.00 609.01 STRAIGHT GRANITE CURB LF 160. 22.00 3,520.00 609.8111 BITUMINOUS CURB, TYPE CAPE COD (4" REVEAL) LF 600. 5.00 3,000.00 611.8204 4" DRY STANDPIPE (BRIDGE) U 1. 10,000.00 10,000.00 614.331 3" STEEL CONDUIT LF 15. 16.00 240.00 614.342 4" 2-DUCT STEEL CONDUIT LF 84. 31.00 2,604.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 312. 72.00 22,464.00 614.512 CONCRETE PULL BOX 18" EA 3. 500.00 1,500.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 10.00 2,600.00 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 11.00 2,860.00 614.7428 4" 2- DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 72. 18.00 1,296.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 1. 8,750.00 8,750.00 13933F PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.03 TRAFFIC SIGN TYPE C (F) SF 48.3 72.00 3,477.60 615.033 REMOVING TRAFFIC SIGN, TYPE C U 4. 152.00 608.00 615.303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN U 1. 1,552.00 1,552.00 616.171 PORTABLE TRAFFIC U 1. 70,000.00 70,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 200,000.00 200,000.00 618.7 FLAGGERS HR 1,000. 35.00 35,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 4. 10,000.00 40,000.00 622.2 CONCRETE BOUNDS EA 1. 250.00 250.00 622.4 STONE BOUNDS EA 9. 275.00 2,475.00 628.2 SAWED BITUMINOUS PAVEMENT LF 7,300. 1.40 10,220.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 21,500. .12 2,580.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 21,500. .15 3,225.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 50. 3.50 175.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,800. .40 1,120.00 641. LOAM CY 235. 40.00 9,400.00 645.119 MULCH WITH TACKIFIERS A .5 950.00 475.00 645.3 EROSION STONE TON 3,600. 32.00 115,200.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 14,850. 1.30 19,305.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 8,750. 1.30 11,375.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 500. 2.80 1,400.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 550. 22.00 12,100.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 550. 25.00 13,750.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 800. 10.00 8,000.00 645.531 SILT FENCE LF 5,750. 3.00 17,250.00 645.532 SILT FENCE WITH SUPPORT FENCE LF 550. 12.00 6,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 300. 55.00 16,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.9 1,550.00 2,945.00 13933F PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 647.1 HUMUS CY 640. 15.00 9,600.00 647.16 HUMUS, 6" DEEP CY 80. 15.00 1,200.00 650.2 LANDSCAPING U 1. 1,500.00 1,500.00 651.34061 PICEA GLAUCA WHITE SPRUCE 6 FT B&B EA 4. 255.00 1,020.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 225,000.00 225,000.00 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 225,000.00 225,000.00 670.0491 CONSTRUCT ACCESS LANES U 1. 150,000.00 150,000.00 670.0492 CONSTRUCT ACCESS LANES U 1. 150,000.00 150,000.00 670.0493 CONSTRUCT ACCESS LANES U 1. 132,000.00 132,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 130.00 390.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 400.00 400.00 692. MOBILIZATION U 1. 440,450.00 440,450.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 698.11913 FIELD OFFICE (EQUIPMENT & SUPPLIES) MON 25. 600.00 15,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 50,000.00 50,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 5,000.00 5,000.00 1008.24 ALTERATIONS AND ADDITIONS AS NEEDED - PAVEMENT PATCH $ 1. 5,000.00 5,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 15,400.00 15,400.00 $5,457,557.70 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: SALEM-MANCHESTER A000(126), 13933F COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: MAY 20, 2010 SCOPE OF WORK: BRIDGE REPLACEMENT LOCATION: BROOKDALE ROAD BRIDGE OVER I-93 COMPLETION DATE: JUNE 1, 2012 A S & R CORPORATION 706 BROADWAY STREET, LOWELL, MA 01854 $ 3,777,054.30 B R. S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 4,338,718.55 C E. D. SWETT, INC. 8 INDUSTRIAL PARK DR., CONCORD, NH 03301 $ 4,474,027.25 D R. M. PIPER, INC. PO BOX 490, PLYMOUTH, NH 03264 $ 4,558,787.10 E GEORGE R. CAIRNS AND SONS, INC. 8 LEDGE ROAD, WINDHAM, NH 03087 $ 4,816,268.71 F SPS NEW ENGLAND, INC. 98 ELM ST., SALISBURY, MA 01952 $ 4,875,830.00 G MIG CORPORATION, INC. ONE ACTON PLACE - SUITE 200, ACTON, MA 01720 $ 5,457,557.70 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.1 CLEARING AND GRUBBING (F) A 2.14 5,600.00 11,984.00 8,390.00 17,954.60 -5,970.60 201.8822 INVASIVE SPECIES CONTROL TYPE II SY 9,600. .20 1,920.00 4.00 38,400.00 -36,480.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 30. 29.00 870.00 16.50 495.00 375.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 940.00 940.00 330.00 330.00 610.00 202.7 REMOVAL OF GUARDRAIL (F) LF 780. 5.00 3,900.00 3.00 2,340.00 1,560.00 203.1 COMMON EXCAVATION CY 15,700. 6.00 94,200.00 12.00 188,400.00 -94,200.00 203.2 ROCK EXCAVATION CY 320. 30.00 9,600.00 25.00 8,000.00 1,600.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 6. 640.00 3,840.00 1,500.00 9,000.00 -5,160.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 3. 640.00 1,920.00 1,000.00 3,000.00 -1,080.00 203.6 EMBANKMENT-IN-PLACE (F) CY 952. 2.50 2,380.00 12.00 11,424.00 -9,044.00 206.1 COMMON STRUCTURE EXCAVATION CY 180. 9.00 1,620.00 15.00 2,700.00 -1,080.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 26.00 260.00 47.00 470.00 -210.00 13933F PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 206.2 ROCK STRUCTURE EXCAVATION CY 18. 81.00 1,458.00 100.00 1,800.00 -342.00 209.1 GRANULAR BACKFILL CY 25. 19.00 475.00 25.00 625.00 -150.00 209.2 GRANULAR BACKFILL (BRIDGE) CY 2,090. 15.00 31,350.00 27.00 56,430.00 -25,080.00 209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 129. 15.00 1,935.00 30.00 3,870.00 -1,935.00 214. FINE GRADING U 1. 4,100.00 4,100.00 20,000.00 20,000.00 -15,900.00 304.1 SAND (F) CY 879. 24.00 21,096.00 26.00 22,854.00 -1,758.00 304.2 GRAVEL (F) CY 881. 16.00 14,096.00 28.00 24,668.00 -10,572.00 304.3 CRUSHED GRAVEL (F) CY 879. 16.00 14,064.00 28.00 24,612.00 -10,548.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 140. 20.00 2,800.00 35.00 4,900.00 -2,100.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 820. 92.00 75,440.00 75.00 61,500.00 13,940.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 65. 154.00 10,010.00 120.00 7,800.00 2,210.00 403.6 PAVEMENT JOINT ADHESIVE LF 8,000. 1.00 8,000.00 .30 2,400.00 5,600.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 57. 150.00 8,550.00 175.00 9,975.00 -1,425.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,900. 92.00 174,800.00 75.00 142,500.00 32,300.00 417. COLD PLANING BITUMINOUS SURFACES SY 6,350. 6.50 41,275.00 3.00 19,050.00 22,225.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 250,000.00 250,000.00 300,000.00 300,000.00 -50,000.00 503.201 COFFERDAMS U 1. 141,600.00 141,600.00 100,000.00 100,000.00 41,600.00 503.202 COFFERDAMS U 1. 82,000.00 82,000.00 100,000.00 100,000.00 -18,000.00 503.203 COFFERDAMS U 1. 82,000.00 82,000.00 75,000.00 75,000.00 7,000.00 504.101 COMMON BRIDGE EXCAVATION CY 3,020. 9.00 27,180.00 18.00 54,360.00 -27,180.00 508. STRUCTURAL FILL CY 239. 32.00 7,648.00 30.00 7,170.00 478.00 510.1 PILE DRIVING EQUIPMENT U 1. 7,900.00 7,900.00 75,000.00 75,000.00 -67,100.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 31,800. 1.00 31,800.00 1.00 31,800.00 510.9 PILE SPLICES EA 5. 460.00 2,300.00 50.00 250.00 2,050.00 520.01007 CONCRETE CLASS AA (PRECAST OPTION) (F) CY 117. 400.00 46,800.00 600.00 70,200.00 -23,400.00 520.01027 CONCRETE CLASS AA (QC/QA) (PRECAST OPTION) (F) CY 43. 564.00 24,252.00 900.00 38,700.00 -14,448.00 520.03027 CONCRETE, CLASS AA, APPROACH SLABS (QC/QA) (PRECAST OPTION) (F) CY 52. 194.00 10,088.00 350.00 18,200.00 -8,112.00 520.21097 CONCRETE CLASS B (MOD), FOOTINGS (ON SOIL) (PRECAST OPTION) (F) CY 75. 215.00 16,125.00 300.00 22,500.00 -6,375.00 520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY 251. 470.00 117,970.00 1,000.00 251,000.00 -133,030.00 528.51 PRESTRESSED CONCRETE DECK PANELS (F) SF 7,752. 9.00 69,768.00 26.00 201,552.00 -131,784.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 90. 44.00 3,960.00 100.00 9,000.00 -5,040.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 20. 38.00 760.00 50.00 1,000.00 -240.00 13933F PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 538.5 BARRIER MEMBRANE, WELDED BY TORCH (F) SY 19. 26.00 494.00 70.00 1,330.00 -836.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 995. 26.00 25,870.00 25.00 24,875.00 995.00 541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF 56. 1.40 78.40 8.00 448.00 -369.60 544.3 REINFORCING STEEL (CONTRACTOR DETAILED) LB 17,840. 1.00 17,840.00 2.00 35,680.00 -17,840.00 544.31 REINFORCING STEEL, EPOXY COATED (CONTRACTOR DETAILED) LB 91,623. 1.00 91,623.00 2.25 206,151.75 -114,528.75 547. SHEAR CONNECTORS (F) EA 2,168. 5.00 10,840.00 4.25 9,214.00 1,626.00 548.21 ELASTOMERIC BEARING ASSEMBLIES (F) EA 12. 2,100.00 25,200.00 2,500.00 30,000.00 -4,800.00 550.1 STRUCTURAL STEEL (F) LB 367,069. 2.00 734,138.00 2.00 734,138.00 561.110 PREFABRICATED EXPANSION JOINT, TYPE A (F) LF 67. 424.00 28,408.00 700.00 46,900.00 -18,492.00 562.1 SILICONE JOINT SEALANT (F LF 102. 8.00 816.00 20.00 2,040.00 -1,224.00 563.22 BRIDGE RAIL T2 (F) LF 629. 140.00 88,060.00 125.00 78,625.00 9,435.00 563.923 SNOW SCREENING FOR OVERPASS STRUCTURES T2 OR T4 RAIL LF 507. 40.00 20,280.00 35.00 17,745.00 2,535.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 117. 231.00 27,027.00 150.00 17,550.00 9,477.00 585.2 STONE FILL, CLASS B CY 420. 51.00 21,420.00 35.00 14,700.00 6,720.00 585.3 STONE FILL, CLASS C CY 462. 26.00 12,012.00 45.00 20,790.00 -8,778.00 592.1 MECHANICALLY STABILIZED EARTH RETAINING WALL SF 3,870. 48.00 185,760.00 38.00 147,060.00 38,700.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 210. 2.50 525.00 4.00 840.00 -315.00 603.00212 12" R.C. PIPE, 2000D LF 230. 28.00 6,440.00 43.00 9,890.00 -3,450.00 603.00215 15" R.C. PIPE, 2000D LF 180. 31.00 5,580.00 43.00 7,740.00 -2,160.00 603.00312 12" R.C. PIPE, 3000D LF 20. 28.00 560.00 55.00 1,100.00 -540.00 603.00315 15" R.C. PIPE, 3000D LF 150. 32.00 4,800.00 60.00 9,000.00 -4,200.00 603.30115 15" R.C. END SECTIONS EA 1. 580.00 580.00 643.00 643.00 -63.00 603.36115 15" ALUMINIZED STEEL END SECTION EA 3. 320.00 960.00 323.00 969.00 -9.00 603.83215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF 180. 13.00 2,340.00 34.00 6,120.00 -3,780.00 604.0007 POLYETHYLENE LINER EA 8. 110.00 880.00 225.00 1,800.00 -920.00 604.12 CATCH BASINS TYPE B U 2. 2,470.00 4,940.00 1,800.00 3,600.00 1,340.00 604.15 CATCH BASINS TYPE E U 5. 2,040.00 10,200.00 1,800.00 9,000.00 1,200.00 604.16 CATCH BASINS TYPE F U 6. 2,085.00 12,510.00 2,000.00 12,000.00 510.00 604.18 CATCH BASINS, WITH FRAMES AND GRATES FURNISHED BY OTHERS U 2. 1,770.00 3,540.00 1,450.00 2,900.00 640.00 604.32 DRAINAGE MANHOLES U 3. 2,400.00 7,200.00 2,280.00 6,840.00 360.00 605.79 UNDERDRAIN FLUSHING BASINS EA 3. 225.00 675.00 525.00 1,575.00 -900.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 1,000. 8.00 8,000.00 18.00 18,000.00 -10,000.00 13933F PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 512.5 26.00 13,325.00 15.00 7,687.50 5,637.50 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 225. 26.00 5,850.00 16.00 3,600.00 2,250.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 31.00 1,162.50 22.00 825.00 337.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 6. 2,453.00 14,718.00 2,210.00 13,260.00 1,458.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,940.00 5,820.00 1,820.00 5,460.00 360.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 542.00 1,626.00 560.00 1,680.00 -54.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 1,830. 6.00 10,980.00 23.00 42,090.00 -31,110.00 606.84 ANCHOR FOR CURVED GUARD- RAIL W/CRT POSTS U 1. 1,680.00 1,680.00 1,200.00 1,200.00 480.00 606.91 RESETTING OR SETTING GUARDRAIL LF 1,350. 9.00 12,150.00 14.00 18,900.00 -6,750.00 606.93 TEMPORARY BEAM GUARDRAIL LF 1,450. 10.00 14,500.00 11.00 15,950.00 -1,450.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 2. 4,500.00 9,000.00 3,500.00 7,000.00 2,000.00 606.9614 TEMPORARY SINGLE FACED TRANSITION RAIL, WOOD POSTS U 2. 22.00 44.00 3,200.00 6,400.00 -6,356.00 607.655 CHAIN LINK FENCE WITH VINYL-COATED STEEL FABRIC, 5 FEET HIGH LF 550. 22.00 12,100.00 20.00 11,000.00 1,100.00 607.659 POST ASSEMBLIES FOR CHAIN LINK FENCE, 5 FT. HIGH EA 5. 185.00 925.00 200.00 1,000.00 -75.00 609.01 STRAIGHT GRANITE CURB LF 160. 25.00 4,000.00 22.00 3,520.00 480.00 609.8111 BITUMINOUS CURB, TYPE CAPE COD (4" REVEAL) LF 600. 6.00 3,600.00 5.00 3,000.00 600.00 611.8204 4" DRY STANDPIPE (BRIDGE) U 1. 6,800.00 6,800.00 8,000.00 8,000.00 -1,200.00 614.331 3" STEEL CONDUIT LF 15. 32.00 480.00 25.00 375.00 105.00 614.342 4" 2-DUCT STEEL CONDUIT LF 84. 36.00 3,024.00 87.00 7,308.00 -4,284.00 614.3429 4 INCH 2-DUCT STEEL CONDUIT (BRIDGE) LF 312. 50.00 15,600.00 65.00 20,280.00 -4,680.00 614.512 CONCRETE PULL BOX 18" EA 3. 360.00 1,080.00 310.00 930.00 150.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 12.00 3,120.00 6.60 1,716.00 1,404.00 614.7414 4" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 260. 14.00 3,640.00 12.60 3,276.00 364.00 614.7428 4" 2- DUCT PVC PLASTIC CONDUIT, SCHEDULE 80 LF 72. 22.00 1,584.00 16.00 1,152.00 432.00 615.014 RELOCATING TRAFFIC SIGN, TYPE A U 1. 2,380.00 2,380.00 4,200.00 4,200.00 -1,820.00 615.03 TRAFFIC SIGN TYPE C (F) SF 48.3 48.00 2,318.40 43.00 2,076.90 241.50 615.033 REMOVING TRAFFIC SIGN, TYPE C U 4. 256.00 1,024.00 52.00 208.00 816.00 615.303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN U 1. 960.00 960.00 2,500.00 2,500.00 -1,540.00 13933F PAGE 5 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 616.171 PORTABLE TRAFFIC U 1. 60,000.00 60,000.00 40,000.00 40,000.00 20,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 618.7 FLAGGERS HR 1,000. 21.00 21,000.00 22.00 22,000.00 -1,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 100,000.00 100,000.00 -85,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 4. 3,500.00 14,000.00 10,000.00 40,000.00 -26,000.00 622.2 CONCRETE BOUNDS EA 1. 190.00 190.00 270.00 270.00 -80.00 622.4 STONE BOUNDS EA 9. 190.00 1,710.00 310.00 2,790.00 -1,080.00 628.2 SAWED BITUMINOUS PAVEMENT LF 7,300. 1.00 7,300.00 3.00 21,900.00 -14,600.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 21,500. .20 4,300.00 .12 2,580.00 1,720.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 21,500. .20 4,300.00 .11 2,365.00 1,935.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 50. 12.00 600.00 2.70 135.00 465.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,800. .64 1,792.00 .35 980.00 812.00 641. LOAM CY 235. 22.00 5,170.00 25.00 5,875.00 -705.00 645.119 MULCH WITH TACKIFIERS A .5 3,300.00 1,650.00 295.00 147.50 1,502.50 645.3 EROSION STONE TON 3,600. 12.00 43,200.00 50.00 180,000.00 -136,800.00 645.42 TEMPORARY SLOPE STABILIZATION TYPE B (WILDLIFE FRIENDLY) SY 14,850. 1.00 14,850.00 2.00 29,700.00 -14,850.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 8,750. 1.20 10,500.00 2.75 24,062.50 -13,562.50 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 500. 1.50 750.00 2.00 1,000.00 -250.00 645.48 EROSION CONTROL MIX (STUMP GRINDINGS) CY 550. 18.00 9,900.00 15.00 8,250.00 1,650.00 645.481 WOODCHIPS FOR TEMPORARY EROSION CONTROL CY 550. 18.00 9,900.00 15.00 8,250.00 1,650.00 645.51 HAY BALES FOR TEMPORARY EROSION CONTROL EA 800. 7.00 5,600.00 7.50 6,000.00 -400.00 645.531 SILT FENCE LF 5,750. .82 4,715.00 3.20 18,400.00 -13,685.00 645.532 SILT FENCE WITH SUPPORT FENCE LF 550. 1.72 946.00 4.20 2,310.00 -1,364.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 5,000.00 5,000.00 -2,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 300. 100.00 30,000.00 65.00 19,500.00 10,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.9 2,000.00 3,800.00 1,680.00 3,192.00 608.00 647.1 HUMUS CY 640. 25.00 16,000.00 22.00 14,080.00 1,920.00 647.16 HUMUS, 6" DEEP CY 80. 25.00 2,000.00 22.00 1,760.00 240.00 650.2 LANDSCAPING U 1. 1,280.00 1,280.00 5,000.00 5,000.00 -3,720.00 651.34061 PICEA GLAUCA WHITE SPRUCE 6 FT B&B EA 4. 380.00 1,520.00 200.00 800.00 720.00 670.0451 CONSTRUCT AND REMOVE DETOUR U 1. 15,000.00 15,000.00 230,000.00 230,000.00 -215,000.00 13933F PAGE 6 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 670.0452 CONSTRUCT AND REMOVE DETOUR U 1. 15,000.00 15,000.00 223,000.00 223,000.00 -208,000.00 670.0491 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 70,000.00 70,000.00 -65,000.00 670.0492 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 60,000.00 60,000.00 -55,000.00 670.0493 CONSTRUCT ACCESS LANES U 1. 5,000.00 5,000.00 60,000.00 60,000.00 -55,000.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 140.00 420.00 200.00 600.00 -180.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 240.00 240.00 400.00 400.00 -160.00 692. MOBILIZATION U 1. 42,300.00 42,300.00 245,000.00 245,000.00 -202,700.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 698.11913 FIELD OFFICE (EQUIPMENT & SUPPLIES) MON 25. 1,200.00 30,000.00 1,000.00 25,000.00 5,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1008.1 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY LIGHTING $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.24 ALTERATIONS AND ADDITIONS AS NEEDED - PAVEMENT PATCH $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.3 ALTERATIONS AND ADDITIONS AS NEEDED - TEMPORARY DRAINAGE $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.41 QUALITY CONTROL QUALITY ASSURANCE (QC/QA FOR CONCRETE $ 1. 15,400.00 15,400.00 15,400.00 15,400.00 $3,777,054.30 $5,581,434.75 -1,804,380.45