Administration > Finance and Contracts > 2009 Bid Results
New Hampshire Department of Transportation Road and Bridge and Public Works construction project bid opening results are listed below. Click the Project Name to access bid results. Files are in *.txt or *.pdf format.
Printing Bid Results: You may need to configure your browser (View > Text Size > Smaller) to accommodate printing these documents.
2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004
| Project Name | State Project Number |
Federal Project Number |
Bid Open | Scope of Work |
|---|---|---|---|---|
| Andover | 14169 | X-A000(219) | 3/3/2009 | NH 11 & US 4, Bridge removal & roadway reconstruction |
| Ashland-Alexandria-New London | 15580 | X-A000(796) | 2/26/2009 | I-93, NH 11, NH 25 & NH 104, culvert rehabilitations/replacement |
| Ashland | 15659 | X-A000857) | 10/22/2009 | I-93 NB & SB, maintenance repainting over US 3 & NH 25 |
| Auburn-Candia | 15614 | X-A000(818) | 7/16/2009 | NH 101, Installation of medium guardrail |
| Bedford-Manchester-Londonderry-Merrimack | 11512F | A000(256) | 3/13/2009 | Roadway and bridge construction US 3 Manchester Airport Access Road |
| 11512I | A000(258) | 4/9/2009 | Airport access road, widen F>E> Everett Turnpike | |
| 11512-J | A000(390) | 7/9/2009 | Airport access road, earthwork contract west of the Merrimack River | |
| Boscawen | 13957-A | X-A000(741) | 6/11/2009 | Interim intersection improvements on US 4 & Goodhue Road |
| Bow | 15383 | 4/16/2009 | I-89. Replace existing median guardrail with concrete barriers | |
| Brentwood | 15619 | X-A000(826) | 12/10/2009 | NH 125, Safety improvements at two intersections |
| 15647 | X-A000(841) | 4/29/2009 | Pavement rehabilitation on I-93 between Exits 27 & 28 | |
| Chesterfield-Gilsum | 15581 | X-A000(797) | 2/26/2009 | NH 63 & NH 10, Culvert rehabilitation/replacement & drainage |
| Concord | SBG-33-02-2009 | 1/8/2009 | Pavement maintenance @ Concord Municipal Airport | |
| Concord | 15613 | X-A000(816) | 4/2/2009 | Culvert replacement I-393 WB Exit 1 on and off ramps |
| 15644 | X-A000(838) | 5/14/2009 | Pavement rehabilitation I-393 in the city of Concord and the town of Pembroke | |
| 15645 | X-A000(839) | 5/14/2009 | Pavement rehabilitation on I-93 Exit 14 to Exit 17 | |
| Concord | 13742-C | 9/17/2009 | I-93, Bridge redecking over NH 9 and Loudon Road | |
| Conway | 15604 | X-A000(809) | 10/15/2009 | Encass steel h-piles over Lovejoy Brook on River Road |
| Derry | 13249 | MGS-STP-X-5119(007) | 1/8/2009 | NH 28, Intersection improvement @ NH 102 |
| District One Resurfacing | 15460 | X-A000(745) | 3/5/2009 | Roadway resurfacing |
| Dorchester | 15503 | X-A000(753) | 2/19/2009 | NH 118, Pavement rehabilitation & guardrail replacement |
| Dover | 13042 | BRF-X-T-2220(001) | 10/22/2009 | NH 9, Replace bridge over the Pan Am railways |
| Dummer | 15804 | X-A000(968) | 15804 | NH 16, 110A & 110B, emergency road rehabilitation |
| 14923 | X-A000(620) | 3/10/2009 | NH 101, Pavement rehabilitation from Exit 6 in Epping to Exit 9 in Exeter | |
| Epsom | 15623 | X-A000(830) | 8/27/2009 | US 4, Safety improvements @ the intersection of NH 107 |
| Exeter-Hampton | 14922 | X-A000(619) | 12/17/2009 | NH 101, Resurfacing, guardrail and drainage upgrades |
| Gilford | 15583 | 3/4/2009 | Building demolition at NH 11 & 11C intersection | |
| Grantham-Enfield | 15382 | X-A000(727) | 1/8/2009 | I-89, Pavement rehabilitation, and bridge and guardrail work |
| Hampton-North Hampton | 15678-A | 7/23/2009 | I-95, Road widening for Exit 2 ramps and Hampton mainline toll | |
| Hampton-North Hampton | 15678-B | 9/24/2009 | I-95, Construction of open road tolling lanes | |
| Holderness | 15309 | X-A000(732) | 7/9/2009 | NH 175/NH 175A, reconstruct "Y" intersection into a "T" intersection |
| Hopkinton | 15298 | X-A000(683) | 3/3/2009 | I-89, Pavement and bridge rehabilitation |
| Hooksett | 14695-A | 2/24/2009 | NH 3A, permanent restoration for damage due to May 2006 flood | |
| Keene | 10309-R | X-A000(895) | 4/30/2009 | Landscaping within the roundabout @ the intersection of NH 10/12/101 |
| Lebanon-Hanover | 14340 | X-A000(310) | 3/10/2009 | NH 10, Pavement rehabilitation, guardrail & underdrain installation |
| Lebanon, NH-Hartford, VT | 14957-A | A000(858) | 6/30/2009 | US 4, Advance detour bridge for bridge replacement over the Connecticut River |
| 11700 & 11700-A | IM-T-0891(177) & A000(947) | 9/15/2009 | I-89, reinterchange and bridge work at Exit 20 | |
| Merrimack | 14509 | 3/5/2009 | Toll plaza canopy painting F.E. Everett Turnpike | |
| Nashua | 13716 | 6/25/2009 | Bridge rehabiliation D.W. Highway over F.E. Everett Turnpike | |
| Nashua-Hooksett | 15377 | 3/5/2009 | Roadway resurfacing in Merrimack and Hillsborough counties | |
| New Castle-Rye | 15624 | X-A000(834) | 10/8/2009 | NH 1B, Replacement of concrete pile encasement |
| 15651 | X-A000(845) | 5/6/2009 | Pavement & bridge rehabilitation on I-93 | |
| New Hampton-Thornton | 14567-M | 7/28/2009 | Remove & replace underground storage tanks | |
| New London | 14884 | 2/5/2009 | I-89, Exit 12, Expand park & ride facility | |
| 15652 | X-A000(846) | 3/17/2009 | I-89 Exit 11 north to Exit 12A, pavement rehabilitation | |
| 15643 | X-A000(837) | 4/29/2009 | Microsurfacing on I-89 Exit 12A to Exit 13 | |
| New London -Wilmot | 14451 & 14451-A | X-A000(389) & X-A000(730) | 5/7/2009 | NH 11, Roadway work and pavement rehabilitation |
| Northfield | 15628 | X-A000(833) | 7/16/2009 | I-93, sliplining & repairs of an existing concrete culvert |
| 15646 | X-A000(840) | 5/6/2009 | Pavement & bridge rehabilitation on I-93 | |
| Pittsfield | 15622 | X-A000(829) | 11/12/2009 | NH 28, Safety improvements @ intersection with Leavitt Road |
| Portsmouth-Dover-Farmington | 15378 | 3/3/2009 | Eastern Turnpike resurfacing | |
| Portsmouth | 15304 | 4/9/2009 | I-95, culvert lining | |
| 15648 | X-A000(842) | 6/11/2009 | I-95, Pavement overlay, bridge deck rehab & guardrail | |
| Portsmouth | 14376 | A000(337) | 9/24/2009 | I-95, Paint bridge approaches to bridge over the Piscataqua River |
| Porstmouth | 13678G | A000(993) | 10/29/2009 | Emergency bridge repairs to the Memorial Bridge |
| Randolph | 13602-A | X-A000(211) | 6/18/2009 | Reconstruction of US Route 2 |
| Resurfacing District 1 | 15561 | 2/24/2009 | Counties of Carroll & Grafton | |
| Resurfacing District 2 | 15562 | 2/26/2009 | Counties of Grafton, Merrimack & Sullivan | |
| Resurfacing District 3 | 15563 | 2/26/2009 | Counties of Grafton, Belknap & Carroll | |
| Resurfacing District 4 | 15564 | 2/24/2009 | Counties of Cheshire & Hillsboro | |
| Resurfacing District 5 | 15565 | 3/5/2009 | Roadway resurfacing in Hillsborough, Merrimack and Rockingham counties | |
| Resurfacing District 6 | 15566 | 3/3/2009 | Counties of Carroll, Strafford & Rockingham | |
| 15671 | X-A000(871) | 3/19/2009 | Counties of Coos, Carroll & Grafton | |
| 15672 | X-A000(872) | 3/19/2009 | Counties of Grafton, Merrimack & Sullivan | |
| 15673 | X-A000(873) | 3/24/2009 | Counties of Grafton, Belknap & Carroll | |
| 15674 | X-A000(874) | 4/29/2009 | Counties of Cheshire & Hillsborough | |
| 15675 | X-A000(875) | 4/30/2009 | Counties of Hillsborough, Merrimack & Rockingham | |
| 15676 | X-A000(876) | 4/30/2009 | Counties of Strafford & Rockingham | |
| Rochester | 10620H | 2/17/2009 | Roadway reconstruction & widening on the Spaulding Turnpike (NH 16) | |
| Rochester | 10620M | 5/19/2009 | Smark work zone on Spaulding Turnpike, exits 11 to 16 | |
| Rochester | 10620I | 6/25/2009 | Roadway rehabilitation on Spaulding Turnpike (NH 16) | |
| Salem-Atkinson | 15504 | X-A000(754) | 4/16/2009 | NH 111, Pavement rehabilitation |
| 13933-G | A000(127) | 4/15/2009 | I-93, Exit 3 area, NB mainline construction from Salem TL to Exit 3 | |
| Sanbornton-New Hampton | 15650 | X-A000(844) | 12/10/2009 | I-93, Exit 22 north to Exit 23, roadway & bridge rehabilitation |
| Statewide crack seal | 15295 | X-A000(682) | 4/9/2009 | Crack sealing various roads |
| Statewide crack seal | 15295-A | X-A000(883) | 4/9/2009 | Crack sealing various roads |
| Statewide | 15694 | 4/23/2009 | Chip seal, rubber chip seal or fibermat chip seal at various locations in Districts III, IV, V, & VI | |
| Statewide | 15617 | 5/7/2009 | Install mile markers on various roadways | |
| Statewide | 15365 | X-A000(720) | 5/21/2009 | Milled rumble strips @ various locations |
| Statewide | 15656 | X-A000(855) | 8/13/2009 | Placement of warning signs and delineation |
| Tamworth-Carroll | 14567N | 7/30/2009 | Fuel tank removal and replacement | |
| Woodstock | 14773 | X-A000(508) | 3/12/2009 | I-93 test & replace rock bolts and hand scaling |
| 15706 | X-A000(899) | 9/24/2009 | NH 112, Pavement and bridge rehabilitation | |
| 15649 | X-A000(843) | 6/30/2009 | Road and bridge rehabilitation on I-93 | |
| Woodstock-Littleton | 14246 | X-A000(252) | 4/2/2009 | Traffic sign replacement I-93 from Exits 40 to 42 |
| 2009 PUBLIC WORKS PROJECT BID RESULTS | ||||
| Project Name | State Project Number |
Federal Project Number |
Bid Open | Scope of Work |
| Bedford | 80408R-D | 3/25/2009 | Construct highway & bridge maintenance facilities | |
| Concord | 80362-B | 2/4/2009 | Roof replacement & electrical upgrades | |
| Concord (re-adv) | 80365-A | 2/4/2009 | Demolition of 2 buildings @ 83 & 85 Pleasant Street | |
| Concord | 80410R-B | 2/4/2009 | Roof replacement @ Bldg. L, 4 Pembroke Road | |
| Concord | 80358B | 3/5/2009 | South wall/tower reconstruction State Prison | |
| Concord | 80322R-B | 3/12/2009 | Roof replacement & renovations to Building F, NH Air National Guard | |
| Concord | 80455R-A | 4/23/2009 | Re-pointing the granite arch at the State House | |
| Concord | 80426R-A | 6/11/2009 | Roof replacement @ White Farm | |
| Concord | 80461A | 7/30/2009 | Roof replacement for LOB | |
| Concord | 80363-B | 9/17/2009 | Asbestos & Lead abatement @ 105 Pleasant Street | |
| Concord | 80462-A | 10/15/2009 | Removal of UST & replacement of AST, 33 North State Street | |
| Concord | 80478-A | 12/3/2009 | Lighting retrofit @ State Office Park South | |
| Concord | 80394-B | 12/3/2009 | Restroom renovations @ State House Annex | |
| Hopkinton | 80428R-A | 3/25/2009 | Fire Protection on the Contoocook covered railroad bridge | |
| Jaffrey | 80373-A | 4/30/2009 | Construct new toilet building @ Monadnock State Park | |
| Laconia-Concord | 80464-A | 9/24/2009 | Mothballing of 13 buildings | |
| Laconia-Concord | 80464-A (re-adv) | 12/10/2009 | Mothballing of various buildings | |
| Manchester | 80433-B | 3/10/2009 | Renovations to Manchester courthouse, 35 Amherst Street | |
| Manchester | 80475-A | 11/12/2009 | Abatement & interior demolition @ Hillsboro County Courthouse | |
| Manchester | 80475-A (re-adv) | 12/10/2009 | Abatement & interior demolition @ Hillsboro County Courthouse | |
| Statewide | 80410-C | 2/12/2009 | Roof replacement & repairs @ armories | |
| Statewide | 80452R-A | 4/02/2009 | Repair steps, retaining wall and walkways, Bureau of Court Facilities | |
| Statewide | 80449R-B | 7/9/2009 | Electrical upgrade to 3-phase power | |
| Statewide | 80443R-B | 10/8/2009 | Electrical renovations at various Turnpike facilities | |
| Statewide | 80477-A | 10/15/2009 | Roof replacement @ 30 Spring Street in Nashua and 7 Hazen Drive, Concord | |
| Tilton | 80463-A | 8/20/2009 | Veteran's Home exterior painting | |
