THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: HAMPTON-NORTH HAMPTON 15678B COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: SEPTEMBER 24, 2009 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: HAMPTON TOLL PLAZA COMPLETION DATE: JULY 30, 2010 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 7,433,776.00 B CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 7,758,029.00 C SUR CONSTRUCTION, INC. 233 CHESTNUT HILL RD., ROCHESTER, NH 03866 $ 8,422,400.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .2 10,000.00 2,000.00 8,000.00 1,600.00 11,000.00 2,200.00 201.8821 INVASIVE SPECIES CONTROL TYPE II A .2 3,500.00 700.00 5,000.00 1,000.00 50,000.00 10,000.00 202.31 FILL ABANDONED PIPE CY 30. 175.00 5,250.00 150.00 4,500.00 140.00 4,200.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 1,000. 11.50 11,500.00 12.00 12,000.00 13.25 13,250.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 16. 300.00 4,800.00 300.00 4,800.00 410.00 6,560.00 203.1 COMMON EXCAVATION CY 6,400. 8.00 51,200.00 8.00 51,200.00 5.50 35,200.00 203.2 ROCK EXCAVATION CY 60. 25.00 1,500.00 20.00 1,200.00 5.00 300.00 203.35 HANDLING EXCAVATED CONTAM SOILS (DEPARTMENT DISPOSAL) CY 50. 20.00 1,000.00 25.00 1,250.00 30.00 1,500.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 3. 875.00 2,625.00 1,000.00 3,000.00 460.00 1,380.00 203.6 EMBANKMENT-IN-PLACE (F) CY 400. 4.00 1,600.00 2.00 800.00 1.00 400.00 206.1 COMMON STRUCTURE EXCAVATION CY 450. 20.50 9,225.00 25.00 11,250.00 18.00 8,100.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 21.00 1,050.00 50.00 2,500.00 20.00 1,000.00 214. FINE GRADING U 1. 15,000.00 15,000.00 15,000.00 15,000.00 12,500.00 12,500.00 304.1 SAND (F) CY 2,000. 7.50 15,000.00 16.00 32,000.00 5.25 10,500.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 4,000. 15.00 60,000.00 24.00 96,000.00 26.00 104,000.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 5,000. 15.00 75,000.00 24.00 120,000.00 26.00 130,000.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 12,500. 60.00 750,000.00 64.00 800,000.00 61.90 773,750.00 15678B PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11092 HOT BIT. PAVE., MACHINE METHOD (NIGHT) (QC/QA TIER 2) TON 14,000. 60.00 840,000.00 66.00 924,000.00 62.90 880,600.00 403.1199 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (NIGHT) TON 2,000. 65.00 130,000.00 74.00 148,000.00 69.50 139,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 600. 125.00 75,000.00 50.00 30,000.00 175.00 105,000.00 403.4 MATERIAL TRANSFER VEHICLE TON 27,000. .55 14,850.00 1.00 27,000.00 1.50 40,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 150,000. .25 37,500.00 .25 37,500.00 .27 40,500.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 60. 75.00 4,500.00 75.00 4,500.00 125.00 7,500.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 300. 75.00 22,500.00 64.00 19,200.00 75.00 22,500.00 417. COLD PLANING BITUMINOUS SURFACES SY 47,000. 1.86 87,420.00 1.75 82,250.00 2.15 101,050.00 510.1 PILE DRIVING EQUIPMENT U 1. 6,250.00 6,250.00 11,000.00 11,000.00 13,850.00 13,850.00 510.61 FURNISHING & DRIVING STEE BEARING PILES LB 73,000. .94 68,620.00 1.10 80,300.00 .97 70,810.00 510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA 46. 290.00 13,340.00 175.00 8,050.00 260.00 11,960.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 230. 235.00 54,050.00 230.00 52,900.00 230.00 52,900.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 230. 450.00 103,500.00 440.00 101,200.00 440.00 101,200.00 520.001 CONCRETE CLASS AAA CY 700. 325.00 227,500.00 325.00 227,500.00 320.00 224,000.00 520.01 CONCRETE CLASS AA CY 100. 250.00 25,000.00 245.00 24,500.00 245.00 24,500.00 520.2 CONCRETE CLASS B CY 350. 265.00 92,750.00 230.00 80,500.00 265.00 92,750.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 110. 89.50 9,845.00 200.00 22,000.00 150.00 16,500.00 544.1 REINFORCING STEEL (ROADWAY) LB 43,000. 1.00 43,000.00 1.50 64,500.00 1.00 43,000.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT (6" WIDE) LF 200. 66.00 13,200.00 65.00 13,000.00 65.00 13,000.00 566.1 ELASTOMERIC JOINT SEAL (F) LF 1,800. 15.00 27,000.00 26.00 46,800.00 3.75 6,750.00 585.3 STONE FILL, CLASS C CY 170. 35.00 5,950.00 30.00 5,100.00 45.00 7,650.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 500. .90 450.00 2.00 1,000.00 1.50 750.00 603.00315 15" R.C. PIPE, 3000D LF 4,500. 29.00 130,500.00 37.00 166,500.00 33.50 150,750.00 603.00318 18" R.C. PIPE, 3000D LF 1,800. 33.00 59,400.00 41.00 73,800.00 39.50 71,100.00 603.00321 21" R. C. PIPE, 3000D LF 610. 37.00 22,570.00 45.00 27,450.00 34.00 20,740.00 603.00324 24" R.C. PIPE, 3000D LF 320. 62.00 19,840.00 50.00 16,000.00 46.00 14,720.00 603.00327 27" R. C. PIPE, 3000D LF 220. 52.00 11,440.00 62.00 13,640.00 55.75 12,265.00 603.00330 30" R.C. PIPE, 3000D LF 410. 55.00 22,550.00 65.00 26,650.00 56.00 22,960.00 603.00336 36" R.C. PIPE, 3000D LF 130. 88.00 11,440.00 78.00 10,140.00 104.00 13,520.00 15678B PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.30124 24" R.C. END SECTIONS EA 1. 750.00 750.00 725.00 725.00 640.00 640.00 603.30136 36" R.C. END SECTIONS EA 1. 1,075.00 1,075.00 1,050.00 1,050.00 1,060.00 1,060.00 604.0007 POLYETHYLENE LINER EA 70. 165.00 11,550.00 135.00 9,450.00 150.00 10,500.00 604.114 CATCH BASINS TYPE A 4-FOOT DIAMETER U 52. 2,050.00 106,600.00 2,000.00 104,000.00 1,810.00 94,120.00 604.115 CATCH BASINS TYPE A, 5-FOOT DIAMETER U 6. 2,650.00 15,900.00 2,500.00 15,000.00 2,660.00 15,960.00 604.214 DROP INLETS, TYPE A (4' DIAMETER) U 8. 1,750.00 14,000.00 1,600.00 12,800.00 1,600.00 12,800.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 2. 2,775.00 5,550.00 2,500.00 5,000.00 2,355.00 4,710.00 604.326 DRAINAGE MANHOLES, 6-FOOT U 1. 4,000.00 4,000.00 3,800.00 3,800.00 4,335.00 4,335.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 20. 775.00 15,500.00 275.00 5,500.00 305.00 6,100.00 604.6 MANHOLE COVERS & FRAMES EA 8. 300.00 2,400.00 425.00 3,400.00 650.00 5,200.00 604.71 GRATES & FRAMES, TYPE A EA 70. 300.00 21,000.00 425.00 29,750.00 763.00 53,410.00 605.906 6" PIPE UNDERDRAIN (CON- TRACTORS OPTION) LF 10. 22.00 220.00 25.00 250.00 10.00 100.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 1,200. 17.50 21,000.00 16.50 19,800.00 16.50 19,800.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 3. 2,250.00 6,750.00 2,200.00 6,600.00 2,200.00 6,600.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 550.00 1,650.00 550.00 1,650.00 550.00 1,650.00 606.411 CONCRETE BARRIER, SINGLE- FACED, PRECAST LF 80. 290.00 23,200.00 75.00 6,000.00 120.00 9,600.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 3,000. 67.50 202,500.00 72.50 217,500.00 76.00 228,000.00 606.4139 SINGLE SLOPE CONCRETE BARRIER, PRECAST (MODIFIED) LF 7,300. 83.00 605,900.00 90.00 657,000.00 93.50 682,550.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 14,000. 16.30 228,200.00 15.00 210,000.00 7.75 108,500.00 606.49231 TRANSITION SINGLE SLOPE CONCRETE BARRIER (CONTRACTORS OPTION) U 8. 2,300.00 18,400.00 1,825.00 14,600.00 2,390.00 19,120.00 606.49359 54" SINGLE SLOPE CONCRETE BARRIER, VARIABLE WIDTH (CONTRACTOR'S OPTION) U 4. 18,985.00 75,940.00 20,000.00 80,000.00 19,950.00 79,800.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 3,900.00 7,800.00 3,500.00 7,000.00 5,950.00 11,900.00 607.6351 CHAIN LINK FENCE W/ VINYL COATED STEEL FABRIC, 3 FT HIGH (MODIFIED) LF 600. 14.00 8,400.00 14.00 8,400.00 9.45 5,670.00 607.639 POST ASSEMBLIES FOR CHAIN LINK FENCE, 3 FT HIGH EA 60. 110.00 6,600.00 110.00 6,600.00 242.00 14,520.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 250. 16.50 4,125.00 14.00 3,500.00 15.00 3,750.00 15678B PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 20. 16.50 330.00 14.00 280.00 15.00 300.00 614.311 1" STEEL CONDUIT LF 1,000. 8.00 8,000.00 7.80 7,800.00 7.80 7,800.00 614.3122 1 1/2" STEEL CONDUIT LF 120. 12.00 1,440.00 11.80 1,416.00 11.80 1,416.00 614.321 2" STEEL CONDUIT LF 1,100. 11.00 12,100.00 10.80 11,880.00 10.80 11,880.00 614.331 3" STEEL CONDUIT LF 740. 14.50 10,730.00 14.30 10,582.00 14.30 10,582.00 614.4122 1 1/2" ELECTRICAL METALIC TUBING LF 60. 12.50 750.00 12.50 750.00 12.50 750.00 614.513 24"X24"X2' CONCRETE PULL BOX EA 8. 1,200.00 9,600.00 1,190.00 9,520.00 1,190.00 9,520.00 614.514 30"X30"X2' CONCRETE PULL BOX EA 2. 1,650.00 3,300.00 1,650.00 3,300.00 1,650.00 3,300.00 614.522 MOLDED PULL BOX 13"X24" EA 2. 385.00 770.00 381.00 762.00 381.00 762.00 614.7118 1" PVC SCHEDULE 80 LF 2,000. 5.50 11,000.00 5.50 11,000.00 5.50 11,000.00 614.7218 2" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 1,000. 7.40 7,400.00 7.40 7,400.00 7.40 7,400.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 1,800. 8.50 15,300.00 8.50 15,300.00 8.50 15,300.00 615.008 TOLL PLAZA SUPPORT SYSTEM - TOLL GANTRY U 2. 65,000.00 130,000.00 125,000.00 250,000.00 125,000.00 250,000.00 615.012 TRAFFIC SIGN TYPE A, BREAKAWAY MOUNTS (F) SF 1,245. 58.00 72,210.00 58.00 72,210.00 57.50 71,587.50 615.013 REMOVING TRAFFIC SIGN TYPE A U 25. 800.00 20,000.00 800.00 20,000.00 800.00 20,000.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 60. 88.00 5,280.00 88.00 5,280.00 87.50 5,250.00 615.032 TRAFFIC SIGN TYPE C, BREAKAWAY MOUNTS (F) SF 72. 98.00 7,056.00 98.00 7,056.00 98.00 7,056.00 615.033 REMOVING TRAFFIC SIGN TYPE C U 9. 200.00 1,800.00 200.00 1,800.00 200.00 1,800.00 615.036 TRAFFIC SIGN TYPE C, MOUNTED ON NEW FACILITIES SF 50. 52.50 2,625.00 53.00 2,650.00 52.50 2,625.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 4,725. 17.00 80,325.00 17.00 80,325.00 17.00 80,325.00 615.043 REMOVING TRAFFIC SIGN TYPE AA FACILITIES U 22. 250.00 5,500.00 250.00 5,500.00 250.00 5,500.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 16. 20.00 320.00 20.00 320.00 20.00 320.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 140. 10.00 1,400.00 10.00 1,400.00 10.00 1,400.00 615.10001 FULL TRAFFIC SIGN STRUCTURE U 1. 79,250.00 79,250.00 79,200.00 79,200.00 79,200.00 79,200.00 615.10002 FULL TRAFFIC SIGN STRUCTURE U 1. 57,400.00 57,400.00 57,400.00 57,400.00 57,400.00 57,400.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 26,200.00 26,200.00 26,200.00 26,200.00 26,200.00 26,200.00 615.30001 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30002 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 15678B PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.30003 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30004 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30005 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 615.30006 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 615.30007 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30008 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30009 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 615.30010 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 615.30011 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30012 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30013 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30014 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 615.30015 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 615.30016 BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 9,100.00 615.30301 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30302 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30303 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30304 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30305 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30306 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30307 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30308 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30309 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30310 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30311 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 15678B PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 615.30312 REMOING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 615.30313 REMOVING BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 1. 750.00 750.00 750.00 750.00 750.00 750.00 616.25 FLASHING BEACON (SOLAR) EA 2. 3,300.00 6,600.00 3,300.00 6,600.00 3,300.00 6,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 80,000.00 80,000.00 50,000.00 50,000.00 100,000.00 100,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 6. 3,750.00 22,500.00 3,000.00 18,000.00 9,000.00 54,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 12,000.00 24,000.00 5,000.00 10,000.00 14,850.00 29,700.00 621.11 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR (WHITE) EA 35. 10.00 350.00 25.00 875.00 10.00 350.00 621.12 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR (YELLOW) EA 105. 10.00 1,050.00 25.00 2,625.00 10.00 1,050.00 621.21 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (WHITE) EA 15. 5.00 75.00 5.00 75.00 5.00 75.00 621.22 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR (YELLOW) EA 10. 5.00 50.00 5.00 50.00 5.00 50.00 621.71 FLEXIBLE DELINEATORS, SOIL MOUNT EA 60. 52.50 3,150.00 50.00 3,000.00 50.00 3,000.00 621.719 FLEXIBLE DELINEATORS, SOIL MOUNT (SALVAGE TO DEPARTMENT) EA 300. 30.00 9,000.00 30.00 9,000.00 30.00 9,000.00 628.1 SAWED CONCRETE PAVEMENT LF 200. .55 110.00 3.00 600.00 4.00 800.00 628.2 SAWED BITUMINOUS PAVEMENT LF 6,000. .90 5,400.00 1.00 6,000.00 1.50 9,000.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 57,000. .11 6,270.00 .11 6,270.00 .15 8,550.00 632.0112 RETROREFLECTIVE PAINT PAVE. MARKING, 12" LINE LF 15,000. .22 3,300.00 .22 3,300.00 .36 5,400.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 15,000. 1.75 26,250.00 1.75 26,250.00 1.30 19,500.00 632.6106 PREFORMED RETROREFLECTIVE TAPE, LEVEL II, 6" LINE LF 1,450. 6.50 9,425.00 6.50 9,425.00 8.25 11,962.50 632.71306 GROOVED RETOREFLECTIVE POLYUREA PVMNT MRKNG (CERAMIC BEADS), 6" LINE LF 76,000. 1.15 87,400.00 1.15 87,400.00 .95 72,200.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 9,500. .35 3,325.00 .35 3,325.00 .35 3,325.00 645.3 EROSION STONE TON 65. 15.00 975.00 25.00 1,625.00 30.00 1,950.00 645.41 TEMPORARY SLOPE STABILIZATION TYPE A SY 3,400. 1.50 5,100.00 1.45 4,930.00 1.45 4,930.00 645.46 PERMANENT CHANNEL STABILIZATION TYPE B SY 3,400. 3.25 11,050.00 3.25 11,050.00 3.25 11,050.00 15678B PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 645.48 EROSION CONTROL MIX CY 200. 27.25 5,450.00 30.00 6,000.00 34.75 6,950.00 645.531 SILT FENCE LF 1,000. 2.00 2,000.00 3.00 3,000.00 2.50 2,500.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,800.00 1,800.00 2,200.00 2,200.00 1,250.00 1,250.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 240. 50.00 12,000.00 60.00 14,400.00 42.50 10,200.00 646.2 TURF ESTABLISHMENT WITH- OUT MULCH A 1.1 1,750.00 1,925.00 1,750.00 1,925.00 1,750.00 1,925.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.1 1,600.00 1,760.00 1,600.00 1,760.00 1,600.00 1,760.00 647.1 HUMUS CY 1,050. 25.00 26,250.00 16.00 16,800.00 20.00 21,000.00 670.104 TEMPORARY PORTABLE LIGHTING U 2. 4,500.00 9,000.00 1,000.00 2,000.00 10,000.00 20,000.00 670.55 TOLL PLAZA FACILITY MODIFICATION/DEMOLITION AND RESTORATIONS U 1. 525,000.00 525,000.00 522,858.00 522,858.00 522,858.00 522,858.00 678.2 IMPACT ATTENUATION DEVICE (TEST LEVEL 3) U 4. 25,000.00 100,000.00 24,675.00 98,700.00 24,675.00 98,700.00 678.201 IMPACT ATTENUATOR FOUNDATION PAD U 4. 2,000.00 8,000.00 1,000.00 4,000.00 1,300.00 5,200.00 678.5 BULL NOSE ATTENUATOR U 1. 7,850.00 7,850.00 7,850.00 7,850.00 7,850.00 7,850.00 692. MOBILIZATION U 1. 385,000.00 385,000.00 311,000.00 311,000.00 965,111.00 965,111.00 698.12912 FIELD OFFICE (EQUIPMENT AND SUPPLIES) MON 12. 750.00 9,000.00 1,000.00 12,000.00 1,775.00 21,300.00 698.2 PHYSICAL TESTING LABORATORY MON 12. 600.00 7,200.00 1,000.00 12,000.00 585.00 7,020.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 801.11 ELECTRICAL WORK U 1. 50,000.00 50,000.00 49,700.00 49,700.00 40,400.00 40,400.00 1008.43 ALT. AND ADD. AS NEEDED - REMOVAL/UPGRADE OF TOLL PLAZA SYSTEM EQUIPMENT $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - INVASIVE SPECIES MANAGEMENT $ 1. 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 1009.1 PROJECT HEALTH AND SAFETY PLAN $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUND WATER (FRAC TANK) $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1010.5 COMPLETION INCENTIVE/ DISINCENTIVE $ 1. 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 $7,433,776.00 $7,758,029.00 $8,422,400.00