THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: DISTRICT III RESURFACING X-A000(873), 15673 COUNTIES AND CODES: GRAFTON 009 BELKNAP 001 CARROLL 003 DATE BIDS OPEN: MARCH 24, 2009 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 11, 2009 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 3,077,940.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 6,200. 23.00 142,600.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 9,200. 78.00 717,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 150.00 7,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 104,000. .26 27,040.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 1,100. 84.00 92,400.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 22,700. 82.00 1,861,400.00 417. COLD PLANING BITUMINOUS SURFACES SY 5,700. 7.50 42,750.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 618.7 FLAGGERS HR 1,700. 23.00 39,100.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 425.00 2,550.00 692. MOBILIZATION U 1. 65,000.00 65,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 $3,077,940.00