THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH X-A000(842), 15648 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: JUNE 11, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: SPAULDING TURNPIKE COMPLETION DATE: AUGUST 27, 2010 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 4,872,391.35 B R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 5,045,527.00 C CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 5,276,381.85 D BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 6,100,843.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.701 REMOVAL OF GUARDRAIL LF 17,250. 1.20 20,700.00 1.70 29,325.00 1.50 25,875.00 203.1 COMMON EXCAVATION CY 550. 22.00 12,100.00 30.00 16,500.00 20.00 11,000.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 5. 1,100.00 5,500.00 700.00 3,500.00 1,500.00 7,500.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 702.00 1,404.00 500.00 1,000.00 1,000.00 2,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 400. 16.00 6,400.00 21.00 8,400.00 10.00 4,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 95. 38.00 3,610.00 65.00 6,175.00 100.00 9,500.00 304.301 CRUSHED GRAVEL CY 430. 30.00 12,900.00 38.00 16,340.00 30.00 12,900.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 575. 34.00 19,550.00 28.00 16,100.00 30.00 17,250.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 340. 70.00 23,800.00 69.50 23,630.00 72.00 24,480.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 192. 70.00 13,440.00 69.50 13,344.00 75.00 14,400.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 15,300. 70.00 1,071,000.00 69.00 1,055,700.00 77.00 1,178,100.00 403.11092 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 2) TON 1,850. 70.00 129,500.00 69.50 128,575.00 76.00 140,600.00 403.1199 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (NIGHT) TON 900. 85.00 76,500.00 90.00 81,000.00 90.00 81,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 475. 125.00 59,375.00 100.00 47,500.00 100.00 47,500.00 403.129 HOT BITUMINOUS PAVEMENT, HAND METHOD (NIGHT) TON 100. 150.00 15,000.00 135.00 13,500.00 135.00 13,500.00 15648 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.4 MATERIAL TRANSFER VEHICLE TON 15,300. .80 12,240.00 1.00 15,300.00 1.00 15,300.00 403.6 PAVEMENT JOINT ADHESIVE LF 112,000. .25 28,000.00 .23 25,760.00 .35 39,200.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 192. 150.00 28,800.00 125.00 24,000.00 125.00 24,000.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 60. 70.00 4,200.00 100.00 6,000.00 100.00 6,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 75. 70.00 5,250.00 100.00 7,500.00 100.00 7,500.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 88,000. 3.00 264,000.00 2.50 220,000.00 1.95 171,600.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 90,000.00 90,000.00 86,000.00 86,000.00 38,000.00 38,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 95,000.00 95,000.00 86,000.00 86,000.00 39,000.00 39,000.00 502.103 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 82,000.00 82,000.00 38,000.00 38,000.00 502.104 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 126,000.00 126,000.00 98,000.00 98,000.00 86,000.00 86,000.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 439. 12.00 5,268.00 14.00 6,146.00 12.00 5,268.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 440. 12.00 5,280.00 14.00 6,160.00 12.00 5,280.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 1,094. 8.10 8,861.40 12.00 13,128.00 12.00 13,128.00 511.0004 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 1,376. 8.10 11,145.60 12.00 16,512.00 12.00 16,512.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 223. 303.00 67,569.00 450.00 100,350.00 275.00 61,325.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 101. 531.00 53,631.00 760.00 76,760.00 500.00 50,500.00 520.01 CONCRETE CLASS AA CY 61. 809.00 49,349.00 470.00 28,670.00 520.00 31,720.00 520.02 CONCRETE CLASS AA, ABOVE FOOTINGS CY 174. 1,010.00 175,740.00 825.00 143,550.00 895.00 155,730.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 180. 125.00 22,500.00 130.00 23,400.00 140.00 25,200.00 534.1 WATER REPELLENT (LINSEED OIL) GAL 12. 86.00 1,032.00 50.00 600.00 100.00 1,200.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 38. 101.00 3,838.00 100.00 3,800.00 100.00 3,800.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 3,349. 25.50 85,399.50 27.00 90,423.00 25.90 86,739.10 544. REINFORCING STEEL (F) LB 9,725. 5.00 48,625.00 2.75 26,743.75 3.85 37,441.25 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT, 6" WIDE (F) LF 520. 66.00 34,320.00 65.00 33,800.00 60.00 31,200.00 15648 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT, 20" WIDE (F) LF 123. 101.00 12,423.00 100.00 12,300.00 90.00 11,070.00 560.201 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT REHABILITATION (F) LF 130. 152.00 19,760.00 60.00 7,800.00 63.00 8,190.00 562.101 SILICONE JOINT SEALANT LF 385. 4.10 1,578.50 10.00 3,850.00 15.00 5,775.00 563.22 BRIDGE RAIL T2 (F) LF 238. 123.00 29,274.00 115.00 27,370.00 115.00 27,370.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LF 464. 150.00 69,600.00 145.00 67,280.00 140.00 64,960.00 563.423 BRIDGE RAIL STEEL BEAM (THRIE BEAM) (STEEL POSTS) (F) LF 183. 113.00 20,679.00 120.00 21,960.00 120.00 21,960.00 563.81 REHABILITATION OF BRIDGE RAIL (F) LF 422. 29.00 12,238.00 28.00 11,816.00 25.00 10,550.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 294. 154.00 45,276.00 145.00 42,630.00 140.00 41,160.00 565.91 BRIDGE APPROACH RAIL, THRIE BEAM TRANSITION (STEEL POSTS) U 6. 2,490.00 14,940.00 2,500.00 15,000.00 2,500.00 15,000.00 566.1 ELASTOMERIC JOINT SEAL (F) LF 178. 15.00 2,670.00 50.00 8,900.00 40.00 7,120.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 60. 25.50 1,530.00 68.00 4,080.00 50.00 3,000.00 604.0007 POLYETHYLENE LINER EA 98. 145.00 14,210.00 185.00 18,130.00 150.00 14,700.00 604.245 DROP INLETS TYPE D-E U 6. 2,960.00 17,760.00 1,830.00 10,980.00 1,600.00 9,600.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 100. 261.00 26,100.00 270.00 27,000.00 325.00 32,500.00 604.4009 MODIFY EXISTING BARREL BLOCK CATCH BASIN U 13. 3,470.00 45,110.00 2,700.00 35,100.00 2,000.00 26,000.00 604.72 GRATES & FRAMES, TYPE B EA 18. 405.00 7,290.00 270.00 4,860.00 400.00 7,200.00 604.75 GRATES & FRAMES, TYPE E EA 85. 577.00 49,045.00 465.00 39,525.00 500.00 42,500.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 11,250. 16.00 180,000.00 16.00 180,000.00 16.00 180,000.00 606.1203 BEAM GUARDRAIL STANDARD SECTION, THRIE BEAM LF 50. 29.00 1,450.00 27.50 1,375.00 27.00 1,350.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 5. 2,250.00 11,250.00 2,250.00 11,250.00 2,200.00 11,000.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,960.00 5,880.00 1,900.00 5,700.00 1,900.00 5,700.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 8. 461.00 3,688.00 450.00 3,600.00 500.00 4,000.00 606.21203 DOUBLE-FACED BEAM GUARDRAIL (GALVANIZED), THRIE BEAM LF 950. 34.50 32,775.00 34.50 32,775.00 40.00 38,000.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 6. 5,220.00 31,320.00 4,500.00 27,000.00 5,000.00 30,000.00 606.413 SINGLE SLOPE CONC. MED. BARRIER, PRECAST LF 4,180. 69.00 288,420.00 75.00 313,500.00 82.00 342,760.00 15648 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 4,700. 21.00 98,700.00 28.00 131,600.00 20.00 94,000.00 606.4179 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL, DEPARTMENT SUPPLIED LF 180. 7.50 1,350.00 23.00 4,140.00 10.00 1,800.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 6. 5,320.00 31,920.00 5,300.00 31,800.00 6,000.00 36,000.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 35. 19.50 682.50 30.00 1,050.00 16.00 560.00 608.24 4" CONCRETE SIDEWALK (F) SY 55. 36.00 1,980.00 35.00 1,925.00 37.00 2,035.00 608.28 8" CONCRETE SIDEWALK (F) SY 410. 48.50 19,885.00 48.00 19,680.00 50.00 20,500.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 8. 379.00 3,032.00 375.00 3,000.00 400.00 3,200.00 609.5 RESET GRANITE CURB LF 3,500. 7.10 24,850.00 5.00 17,500.00 6.00 21,000.00 609.55 RESET GRANITE CURB (BRIDGE) LF 40. 60.50 2,420.00 45.00 1,800.00 85.00 3,400.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 8,100. 3.60 29,160.00 4.00 32,400.00 4.00 32,400.00 615.30801 RESET BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 4. 6,580.00 26,320.00 1,600.00 6,400.00 2,000.00 8,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 13,200.00 13,200.00 13,000.00 13,000.00 13,000.00 13,000.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 303.00 303.00 300.00 300.00 300.00 300.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 4. 607.00 2,428.00 600.00 2,400.00 600.00 2,400.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 4,250.00 4,250.00 4,200.00 4,200.00 4,200.00 4,200.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 191,000.00 191,000.00 191,000.00 191,000.00 200,000.00 200,000.00 618.7 FLAGGERS HR 600. 21.00 12,600.00 16.00 9,600.00 24.00 14,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 110,000.00 110,000.00 87,000.00 87,000.00 325,000.00 325,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 8,500.00 17,000.00 10,000.00 20,000.00 25,000.00 50,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 279.00 5,580.00 600.00 12,000.00 300.00 6,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 4. 3,190.00 12,760.00 1,100.00 4,400.00 1,000.00 4,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 7,790.00 15,580.00 12,000.00 24,000.00 25,000.00 50,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 50. 15.00 750.00 15.00 750.00 5.00 250.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 165. 4.40 726.00 4.00 660.00 5.00 825.00 621.31 SINGLE DELINEATOR WITH POST EA 30. 32.50 975.00 30.00 900.00 28.00 840.00 621.32 DOUBLE DELINEATOR WITH POST EA 35. 38.50 1,347.50 35.00 1,225.00 32.00 1,120.00 628.2 SAWED BITUMINOUS PAVEMENT LF 12,760. .91 11,611.60 .75 9,570.00 2.00 25,520.00 15648 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 6,925. .11 761.75 .11 761.75 .12 831.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 72,000. .12 8,640.00 .14 10,080.00 .15 10,800.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 265. 2.00 530.00 1.50 397.50 3.00 795.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 60. 3.00 180.00 2.00 120.00 3.00 180.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 1,650. 1.40 2,310.00 1.50 2,475.00 1.25 2,062.50 632.12 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) SYMBOL OR WORD SF 35. 10.00 350.00 10.00 350.00 10.00 350.00 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 7,200. 1.20 8,640.00 1.40 10,080.00 1.75 12,600.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 250. 3.50 875.00 2.00 500.00 4.00 1,000.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,500. .30 750.00 .30 750.00 .40 1,000.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 30,000. .32 9,600.00 .35 10,500.00 .35 10,500.00 645.3 EROSION STONE TON 200. 17.00 3,400.00 45.00 9,000.00 40.00 8,000.00 645.531 SILT FENCE LF 11,200. 1.00 11,200.00 2.00 22,400.00 3.00 33,600.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 7,400. 3.10 22,940.00 2.75 20,350.00 .50 3,700.00 670.104 TEMPORARY PORTABLE LIGHTING U 6. 3,540.00 21,240.00 4,000.00 24,000.00 500.00 3,000.00 678.3201 RELOCATE IMPACT ATTENUATOR DEVICE U 1. 2,550.00 2,550.00 7,500.00 7,500.00 8,500.00 8,500.00 692. MOBILIZATION U 1. 174,000.00 174,000.00 414,000.00 414,000.00 450,000.00 450,000.00 698.12 FIELD OFFICE TYPE B MON 14. 1,280.00 17,920.00 1,785.00 24,990.00 2,000.00 28,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 $4,872,391.35 $5,045,527.00 $5,276,381.85 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH X-A000(842), 15648 COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: JUNE 11, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: SPAULDING TURNPIKE COMPLETION DATE: AUGUST 27, 2010 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 4,872,391.35 B R. S. AUDLEY, INC. 609 RT 3A, BOW, NH 03304 $ 5,045,527.00 C CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 5,276,381.85 D BROX INDUSTRIES INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 6,100,843.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.701 REMOVAL OF GUARDRAIL LF 17,250. 1.70 29,325.00 203.1 COMMON EXCAVATION CY 550. 50.00 27,500.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 5. 1,900.00 9,500.00 203.5555 GUARDRAIL 25'EAGRT PLATFORM U 2. 1,500.00 3,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 400. 16.50 6,600.00 206.2 ROCK STRUCTURE EXCAVATION CY 95. 80.00 7,600.00 304.301 CRUSHED GRAVEL CY 430. 35.00 15,050.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 575. 28.00 16,100.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 340. 90.00 30,600.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 192. 90.00 17,280.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 1) TON 15,300. 83.00 1,269,900.00 403.11092 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA TIER 2) TON 1,850. 90.00 166,500.00 403.1199 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (NIGHT) TON 900. 117.00 105,300.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 475. 150.00 71,250.00 403.129 HOT BITUMINOUS PAVEMENT, HAND METHOD (NIGHT) TON 100. 150.00 15,000.00 15648 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.4 MATERIAL TRANSFER VEHICLE TON 15,300. 1.50 22,950.00 403.6 PAVEMENT JOINT ADHESIVE LF 112,000. .35 39,200.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 192. 200.00 38,400.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 60. 150.00 9,000.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 75. 150.00 11,250.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 88,000. 2.75 242,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 90,000.00 90,000.00 502.102 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 95,000.00 95,000.00 502.103 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 502.104 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 125,000.00 125,000.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 439. 12.00 5,268.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 440. 12.00 5,280.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 1,094. 8.00 8,752.00 511.0004 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 1,376. 8.00 11,008.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 223. 300.00 66,900.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 101. 525.00 53,025.00 520.01 CONCRETE CLASS AA CY 61. 800.00 48,800.00 520.02 CONCRETE CLASS AA, ABOVE FOOTINGS CY 174. 1,000.00 174,000.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 180. 200.00 36,000.00 534.1 WATER REPELLENT (LINSEED OIL) GAL 12. 85.00 1,020.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 38. 100.00 3,800.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 3,349. 25.00 83,725.00 544. REINFORCING STEEL (F) LB 9,725. 5.00 48,625.00 559.41 MODIFIED ELASTOMERIC PLUG TYPE FLEXIBLE JOINT, 6" WIDE (F) LF 520. 65.00 33,800.00 15648 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT, 20" WIDE (F) LF 123. 100.00 12,300.00 560.201 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT REHABILITATION (F) LF 130. 150.00 19,500.00 562.101 SILICONE JOINT SEALANT LF 385. 4.00 1,540.00 563.22 BRIDGE RAIL T2 (F) LF 238. 132.00 31,416.00 563.223 BRIDGE RAIL T2 WITH SNOW SCREENING (F) LF 464. 152.00 70,528.00 563.423 BRIDGE RAIL STEEL BEAM (THRIE BEAM) (STEEL POSTS) (F) LF 183. 122.00 22,326.00 563.81 REHABILITATION OF BRIDGE RAIL (F) LF 422. 32.00 13,504.00 565.222 BRIDGE APPROACH RAIL T2 (STEEL POSTS) (F) LF 294. 154.00 45,276.00 565.91 BRIDGE APPROACH RAIL, THRIE BEAM TRANSITION (STEEL POSTS) U 6. 2,462.00 14,772.00 566.1 ELASTOMERIC JOINT SEAL (F) LF 178. 15.00 2,670.00 603.83212 12" PLASTIC PIPE (SMOOTH INTERIOR) LF 60. 50.00 3,000.00 604.0007 POLYETHYLENE LINER EA 98. 150.00 14,700.00 604.245 DROP INLETS TYPE D-E U 6. 2,300.00 13,800.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 100. 300.00 30,000.00 604.4009 MODIFY EXISTING BARREL BLOCK CATCH BASIN U 13. 2,550.00 33,150.00 604.72 GRATES & FRAMES, TYPE B EA 18. 500.00 9,000.00 604.75 GRATES & FRAMES, TYPE E EA 85. 750.00 63,750.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 11,250. 16.00 180,000.00 606.1203 BEAM GUARDRAIL STANDARD SECTION, THRIE BEAM LF 50. 29.00 1,450.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 5. 2,225.00 11,125.00 606.1455 BEAM GUARDRAIL (TERM. UNIT EAGRT 25 FT.) U 3. 1,950.00 5,850.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 8. 460.00 3,680.00 606.21203 DOUBLE-FACED BEAM GUARDRAIL (GALVANIZED), THRIE BEAM LF 950. 35.00 33,250.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 6. 6,000.00 36,000.00 606.413 SINGLE SLOPE CONC. MED. BARRIER, PRECAST LF 4,180. 80.00 334,400.00 15648 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 4,700. 30.00 141,000.00 606.4179 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL, DEPARTMENT SUPPLIED LF 180. 12.00 2,160.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 6. 6,600.00 39,600.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 35. 60.00 2,100.00 608.24 4" CONCRETE SIDEWALK (F) SY 55. 65.00 3,575.00 608.28 8" CONCRETE SIDEWALK (F) SY 410. 90.00 36,900.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 8. 400.00 3,200.00 609.5 RESET GRANITE CURB LF 3,500. 7.50 26,250.00 609.55 RESET GRANITE CURB (BRIDGE) LF 40. 60.00 2,400.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 8,100. 4.75 38,475.00 615.30801 RESET BRIDGE MOUNTED TRAFFIC SIGN STRUCTURE U 4. 6,500.00 26,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 13,000.00 13,000.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 300.00 300.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 4. 500.00 2,000.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 4,200.00 4,200.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 191,000.00 191,000.00 618.7 FLAGGERS HR 600. 24.00 14,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 450,000.00 450,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 16,000.00 32,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 20. 350.00 7,000.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 4. 3,000.00 12,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 30,000.00 60,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 50. 8.00 400.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 165. 5.00 825.00 621.31 SINGLE DELINEATOR WITH POST EA 30. 35.00 1,050.00 621.32 DOUBLE DELINEATOR WITH POST EA 35. 40.00 1,400.00 628.2 SAWED BITUMINOUS PAVEMENT LF 12,760. 1.50 19,140.00 15648 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 6,925. .11 761.75 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 72,000. .13 9,360.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 265. 1.25 331.25 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 60. 1.75 105.00 632.1104 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) 4" LINE LF 1,650. 1.40 2,310.00 632.12 PREFORMED RETROREFLECTIVE TAPE, TYPE I (REMOVABLE) SYMBOL OR WORD SF 35. 14.50 507.50 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 7,200. 1.35 9,720.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 250. 2.05 512.50 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 2,500. .35 875.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 30,000. .40 12,000.00 645.3 EROSION STONE TON 200. 75.00 15,000.00 645.531 SILT FENCE LF 11,200. 8.00 89,600.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 7,400. .35 2,590.00 670.104 TEMPORARY PORTABLE LIGHTING U 6. 14,000.00 84,000.00 678.3201 RELOCATE IMPACT ATTENUATOR DEVICE U 1. 2,500.00 2,500.00 692. MOBILIZATION U 1. 350,000.00 350,000.00 698.12 FIELD OFFICE TYPE B MON 14. 2,500.00 35,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 15,000.00 15,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 50,000.00 50,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 70,000.00 70,000.00 $6,100,843.00