THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: NORTHFIELD-SANBORNTON X-A000(840), 15646 COUNTIES AND CODES: BELKNAP 001 MERRIMACK 013 DATE BIDS OPEN: MAY 6, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION AND BRIDGE REHABILITATION LOCATION: I-93 IN NORTHFIELD AND SANBORNTON COMPLETION DATE: JUNE 11, 2010 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,427,725.50 B CONTINENTAL PAVING INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 2,472,275.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 6,600. 1.35 8,910.00 1.35 8,910.00 206.2 ROCK STRUCTURE EXCAVATION CY 40. 50.00 2,000.00 20.00 800.00 209.1 GRANULAR BACKFILL CY 7. 165.00 1,155.00 50.00 350.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 3,450. 18.00 62,100.00 24.00 82,800.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 300. 75.50 22,650.00 72.00 21,600.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 8,300. 68.50 568,550.00 72.00 597,600.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA - TIER 1) TON 2,250. 72.50 163,125.00 74.00 166,500.00 403.11092 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA - TIER 2) TON 1,150. 74.00 85,100.00 74.00 85,100.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 10. 225.00 2,250.00 125.00 1,250.00 403.129 HOT BITUMINOUS PAVEMENT, HAND METHOD (NIGHT) TON 25. 225.00 5,625.00 200.00 5,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 95,300. .25 23,825.00 .35 33,355.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 69. 250.00 17,250.00 150.00 10,350.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 5,300. 72.00 381,600.00 72.00 381,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 8,250. 4.50 37,125.00 5.00 41,250.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 604. 10.50 6,342.00 15.00 9,060.00 15646 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 620. 10.50 6,510.00 15.00 9,300.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 62. 250.00 15,500.00 310.00 19,220.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 24. 475.00 11,400.00 1,000.00 24,000.00 520.01 CONCRETE CLASS AA CY 8. 725.00 5,800.00 750.00 6,000.00 520.02 CONCRETE AA, ABOVE FOOTINGS CY 6. 1,000.00 6,000.00 1,750.00 10,500.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 1,224. 35.00 42,840.00 25.00 30,600.00 559.412 MODIFIED ELASTOMERIC PLUG TYPE EXPANSION JOINT, 20" WIDE (F) LF 215. 92.00 19,780.00 92.00 19,780.00 561.1121 PREFABRICATED EXPANSION JOINT, TYPE A REHABILITATION (F) LF 222. 115.00 25,530.00 65.00 14,430.00 565.801 RESETTING BRIDGE APPROACH RAIL LF 235. 20.00 4,700.00 20.00 4,700.00 604.0007 POLYETHYLENE LINER EA 25. 150.00 3,750.00 150.00 3,750.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 10. 475.00 4,750.00 300.00 3,000.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 725. 7.50 5,437.50 7.50 5,437.50 606.014 6"X8" WOOD POST REPLACE- MENTS FOR BEAM GUARDRAIL POSTS EA 120. 46.00 5,520.00 46.00 5,520.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 120. 8.00 960.00 8.00 960.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 5,700. 13.50 76,950.00 13.50 76,950.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 7. 1,850.00 12,950.00 1,850.00 12,950.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 3. 460.00 1,380.00 460.00 1,380.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 600. 25.00 15,000.00 20.00 12,000.00 606.9147 RESETTING TERMINAL UNIT TYPE G-2 EA 8. 90.00 720.00 90.00 720.00 606.915 RESETTING GUARDRAIL BLOCK & RAIL ONLY LF 7,000. 3.50 24,500.00 3.50 24,500.00 606.9513 TEMP. IMPACT ATTENUATION DEVICE (REDIRECTIVE), TEST LEVEL 3 U 2. 11,000.00 22,000.00 7,500.00 15,000.00 608.28 8" CONCRETE SIDEWALK (F) SY 180. 40.00 7,200.00 50.00 9,000.00 609.5 RESET GRANITE CURB LF 640. 10.50 6,720.00 7.00 4,480.00 15646 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 609.55 RESET GRANITE CURB (BRIDGE) LF 96. 100.00 9,600.00 100.00 9,600.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 80. 20.00 1,600.00 5.00 400.00 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 4. 700.00 2,800.00 700.00 2,800.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 2. 3,000.00 6,000.00 3,000.00 6,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 80,000.00 80,000.00 80,000.00 80,000.00 618.7 FLAGGERS HR 500. 22.00 11,000.00 24.00 12,000.00 619.001 WIRELESS IN-PAVEMENT COMBINED WEATHER AND TRAFFIC SENSOR U 1. 21,000.00 21,000.00 20,000.00 20,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 97,500.00 97,500.00 75,000.00 75,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 28. 350.00 9,800.00 300.00 8,400.00 619.273 TRAILER - MOUNTED SPEED LIMIT SIGN UWK 28. 100.00 2,800.00 100.00 2,800.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 130. 4.00 520.00 5.00 650.00 621.31 SINGLE DELINEATOR WITH POST EA 320. 28.00 8,960.00 28.00 8,960.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,200. 1.00 1,200.00 2.00 2,400.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 24,000. .13 3,120.00 .13 3,120.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 2,850. .40 1,140.00 .40 1,140.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 750. .55 412.50 .55 412.50 632.3116 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 16" LINE LF 110. 1.75 192.50 1.75 192.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 60. 2.50 150.00 2.50 150.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 290. 2.50 725.00 2.50 725.00 632.71206 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 6" LINE LF 95,700. .85 81,345.00 .85 81,345.00 632.71212 GROOVED RETROREFLECTIVE POLYUREA PAVEMENT MARKING, 12" LINE LF 4,300. 2.75 11,825.00 2.75 11,825.00 632.9106 OBLITERATE PAVEMENT MARKING, 6" LINE LF 13,300. .35 4,655.00 .35 4,655.00 632.9112 OBLITERATE PAVEMENT MARKING, 12" LINE LF 4,300. .65 2,795.00 .65 2,795.00 632.9116 OBLITERATE PAVEMENT MARKING, 16" LINE LF 110. 1.00 110.00 1.00 110.00 632.9118 OBLITERATE PAVEMENT MARKING, 18" LINE LF 60. 1.10 66.00 1.00 60.00 15646 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 290. .75 217.50 .75 217.50 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 5.1 1,625.00 8,287.50 1,650.00 8,415.00 647.1 HUMUS CY 2,400. 22.00 52,800.00 20.00 48,000.00 670.104 TEMPORARY LIGHTING PORTABLE U 2. 1,000.00 2,000.00 3,000.00 6,000.00 692. MOBILIZATION U 1. 135,000.00 135,000.00 155,000.00 155,000.00 698.13 FIELD OFFICE TYPE C MON 14. 1,400.00 19,600.00 1,600.00 22,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 47,000.00 47,000.00 47,000.00 47,000.00 $2,427,725.50 $2,472,275.00