THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: CONCORD X-A000(839), 15645 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: MAY 14, 2009 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: OCTOBER 15, 2010 A CONTINENTAL PAVING, INC. ONE CONTINENTAL DR., LONDONDERRY, NH 03053 $ 7,272,324.36 B PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 7,568,420.10 C BROX INDUSTRIES, INC. 1471 METHUEN STREET, DRACUT, MA 01826 $ 8,544,634.50 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.7 REMOVAL OF GUARDRAIL (F) LF 25,500. 1.75 44,625.00 1.75 44,625.00 1.17 29,835.00 203.1 COMMON EXCAVATION CY 5,000. 10.00 50,000.00 7.55 37,750.00 9.00 45,000.00 206.1 COMMON STRUCTURE EXCAVATION CY 100. 35.00 3,500.00 21.00 2,100.00 75.00 7,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 10. 65.00 650.00 30.00 300.00 100.00 1,000.00 209.1 GRANULAR BACKFILL CY 100. 16.00 1,600.00 20.00 2,000.00 75.00 7,500.00 304.201 GRAVEL CY 5,800. 16.00 92,800.00 22.00 127,600.00 22.00 127,600.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 3,250. 20.00 65,000.00 22.00 71,500.00 24.00 78,000.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 351. 70.00 24,570.00 90.00 31,590.00 80.00 28,080.00 403.11091 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA - TIER 1) TON 30,000. 66.00 1,980,000.00 71.00 2,130,000.00 80.00 2,400,000.00 403.11092 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, NIGHT (QC/QA - TIER 2) TON 6,500. 68.00 442,000.00 71.00 461,500.00 85.00 552,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 282. 95.00 26,790.00 95.00 26,790.00 130.00 36,660.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 30,000. 2.00 60,000.00 .85 25,500.00 2.50 75,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 225,000. .25 56,250.00 .25 56,250.00 .30 67,500.00 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 312. 125.00 39,000.00 135.00 42,120.00 175.00 54,600.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 1,500. 68.00 102,000.00 75.00 112,500.00 90.00 135,000.00 411.19 HOT BITUMINOUS CONCRETE LEVELING COURSE (NIGHT) TON 4,500. 68.00 306,000.00 71.00 319,500.00 85.00 382,500.00 15645 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 413.69 CRACK FILL PRIOR TO THIN LIFT OVERLAY (NIGHT) LB 8,000. 3.15 25,200.00 1.95 15,600.00 1.93 15,440.00 417.19 COLD PLANING BITUMINOUS SURFACES (NIGHT) SY 115,000. 1.90 218,500.00 2.20 253,000.00 3.20 368,000.00 417.51 COLD PLANING EXISTING RUMBLE STRIPS (F) LF 8,000. .40 3,200.00 .70 5,600.00 .75 6,000.00 418.119 MICRO-SURFACING (NIGHT) SY 49,000. 3.54 173,460.00 3.55 173,950.00 4.20 205,800.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 190,000.00 190,000.00 190,000.00 190,000.00 190,000.00 190,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 16,500.00 16,500.00 25,000.00 25,000.00 28,000.00 28,000.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 5. 30.00 150.00 50.00 250.00 30.00 150.00 508. STRUCTURAL FILL CY 20. 50.00 1,000.00 40.00 800.00 75.00 1,500.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 5,502. 6.00 33,012.00 6.00 33,012.00 7.00 38,514.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 110. 200.00 22,000.00 200.00 22,000.00 200.00 22,000.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 192. 380.00 72,960.00 380.00 72,960.00 380.00 72,960.00 520.01 CONCRETE CLASS AA CY 14. 400.00 5,600.00 400.00 5,600.00 400.00 5,600.00 520.02 CONCRETE CLASS AA, ABOVE FOOTINGS CY 110. 800.00 88,000.00 800.00 88,000.00 800.00 88,000.00 520.2 CONCRETE CLASS B CY 30. 300.00 9,000.00 375.00 11,250.00 265.00 7,950.00 534.1 WATER REPELLENT (LINSEED OIL) GAL 33. 70.00 2,310.00 70.00 2,310.00 70.00 2,310.00 534.3 WATER REPELLENT (SILANE- SILOXANE) GAL 24. 100.00 2,400.00 100.00 2,400.00 100.00 2,400.00 538.2 BARRIER MEMBRANE, VERTICAL SURFACES (F) SY 22. 25.00 550.00 25.00 550.00 25.00 550.00 538.6 BARRIER MEMBRANE, WELDED BY TORCH, MACHINE METHOD (F) SY 5,472. 24.50 134,064.00 24.50 134,064.00 24.50 134,064.00 544.1 REINFORCING STEEL (ROADWAY) LB 2,100. 1.50 3,150.00 2.00 4,200.00 1.75 3,675.00 550.101 STRUCTURAL STEEL (F) LB 12,100. 7.00 84,700.00 7.00 84,700.00 7.00 84,700.00 560.201 PREFABRICATED COMPRESSION SEAL EXPANSION JOINT, REHABILITATION (F) LF 106. 70.00 7,420.00 70.00 7,420.00 70.00 7,420.00 561.1121 PREFABRICATED EXPANSION JOINT, TYPE A REHABILITATION (F) LF 107. 490.00 52,430.00 490.00 52,430.00 490.00 52,430.00 561.301 PREFABRICATED EXPANSION JOINT, FINGER JOINT (F) LF 107. 1,700.00 181,900.00 1,700.00 181,900.00 1,700.00 181,900.00 563.423 BRIDGE RAIL STEEL BEAM (THRIE BEAM) (STEEL POSTS) (F) LF 519. 95.00 49,305.00 95.00 49,305.00 113.00 58,647.00 563.8 RESETTING BRIDGE RAIL (F) LF 3. 700.00 2,100.00 700.00 2,100.00 61.00 183.00 15645 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 565.801 RESETTING BRIDGE APPROACH RAIL LF 640. 10.00 6,400.00 10.00 6,400.00 12.00 7,680.00 566.1 ELASTOMERIC JOINT SEAL (F) LF 519. 27.00 14,013.00 27.00 14,013.00 27.00 14,013.00 604.0007 POLYETHYLENE LINER EA 168. 150.00 25,200.00 130.00 21,840.00 175.00 29,400.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 432. 300.00 129,600.00 220.00 95,040.00 300.00 129,600.00 604.5 RECONSTRUCTING/ADJUSTING MANHOLES LF 4. 300.00 1,200.00 225.00 900.00 300.00 1,200.00 604.72 GRATES & FRAMES, TYPE B EA 99. 425.00 42,075.00 425.00 42,075.00 650.00 64,350.00 606.000 STEEL BEAM FOR BEAM GUARDRAIL LF 1,500. 8.00 12,000.00 8.00 12,000.00 7.37 11,055.00 606.0142 6"X8" WOOD POST ASSEMBLIES FOR BEAM GUARDRAIL POSTS EA 50. 10.00 500.00 10.00 500.00 15.42 771.00 606.120 BEAM GUARDRAIL (STANDARD SECTION-STEEL POST) LF 16,700. 14.70 245,490.00 14.70 245,490.00 14.77 246,659.00 606.12036 BEAM GUARDRAIL (THRIE BEAM) (6FT STEEL POSTS) LF 2,000. 22.00 44,000.00 22.00 44,000.00 22.22 44,440.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 1,700. 14.70 24,990.00 14.70 24,990.00 15.77 26,809.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 24. 2,000.00 48,000.00 2,000.00 48,000.00 2,048.00 49,152.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 16. 500.00 8,000.00 500.00 8,000.00 377.00 6,032.00 606.21213 DOUBLE-FACED STEEL BEAM GR (GALV) (THRIE BEAM) (6FT STEEL POSTS) LF 9,300. 32.50 302,250.00 32.50 302,250.00 33.72 313,596.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POST U 2. 3,200.00 6,400.00 3,200.00 6,400.00 2,787.00 5,574.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,500. 20.00 70,000.00 28.00 98,000.00 26.00 91,000.00 606.9147 RESETTING TERMINAL UNIT TYPE G-2 EA 6. 144.00 864.00 250.00 1,500.00 144.00 864.00 606.915 RESETTING TERMINAL UNIT BLOCKS AND RAIL ONLY LF 11,000. 3.50 38,500.00 3.50 38,500.00 3.88 42,680.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 6. 6,000.00 36,000.00 12,750.00 76,500.00 6,300.00 37,800.00 608.28 8" CONCRETE SIDEWALK (F) SY 585. 50.00 29,250.00 50.00 29,250.00 50.00 29,250.00 609.5 RESET GRANITE CURB LF 2,000. 6.00 12,000.00 13.85 27,700.00 8.00 16,000.00 609.55 RESET GRANITE CURB (BRIDGE) LF 30. 80.00 2,400.00 80.00 2,400.00 80.00 2,400.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 5,000. 3.00 15,000.00 4.25 21,250.00 6.00 30,000.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 220. 16.00 3,520.00 16.25 3,575.00 17.00 3,740.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 36,900.00 36,900.00 37,000.00 37,000.00 36,200.00 36,200.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 15645 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 616.650 TRAFFIC SIGNAL DETECTOR LOOP 6 FT X 50 FT EA 14. 550.00 7,700.00 575.00 8,050.00 600.00 8,400.00 616.95 INSTALL TRAFFIC STUDY EQUIPMENT U 1. 4,800.00 4,800.00 5,000.00 5,000.00 6,500.00 6,500.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 618.7 FLAGGERS HR 620. 22.00 13,640.00 21.00 13,020.00 30.00 18,600.00 619.1 MAINTENANCE OF TRAFFIC U 1. 150,000.00 150,000.00 125,000.00 125,000.00 275,000.00 275,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 125. 300.00 37,500.00 300.00 37,500.00 250.00 31,250.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 4. 1,000.00 4,000.00 4,500.00 18,000.00 4,000.00 16,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 EA 2. 20,000.00 40,000.00 16,500.00 33,000.00 20,000.00 40,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 562. 4.28 2,405.36 4.25 2,388.50 4.50 2,529.00 621.31 SINGLE DELINEATOR WITH POST EA 200. 28.00 5,600.00 28.00 5,600.00 27.00 5,400.00 621.32 DOUBLE DELINEATOR WITH POST EA 50. 32.00 1,600.00 32.00 1,600.00 32.00 1,600.00 622.1 STEEL WITNESS MARKERS EA 50. 25.00 1,250.00 26.00 1,300.00 28.00 1,400.00 628.2 SAWED BITUMINOUS PAVEMENT LF 4,980. 1.00 4,980.00 1.00 4,980.00 1.00 4,980.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 192. 10.00 1,920.00 11.00 2,112.00 10.00 1,920.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 475,000. .13 61,750.00 .13 61,750.00 .13 61,750.00 632.01061 MILLED RETROREFLECTIVE PAINT, 6" LINE LF 2,750. .89 2,447.50 .90 2,475.00 .45 1,237.50 632.3112 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 12" LINE LF 10,250. 1.20 12,300.00 1.20 12,300.00 1.25 12,812.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 400. 1.75 700.00 1.90 760.00 1.85 740.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 800. 3.75 3,000.00 4.00 3,200.00 3.75 3,000.00 632.9112 OBLITERATE PAVEMENT MARKING, 12" LINE LF 750. .45 337.50 .45 337.50 .75 562.50 632.9118 OBLITERATE PAVEMENT MARKING, 18" LINE LF 400. .55 220.00 .60 240.00 .95 380.00 632.93 OBLITERATE PAVEMENT MARKINGS, RAISED PAVEMENT MARKINGS EA 367. 3.00 1,101.00 4.30 1,578.10 20.00 7,340.00 645.3 EROSION STONE TON 200. 18.00 3,600.00 19.50 3,900.00 50.00 10,000.00 645.531 SILT FENCE LF 2,000. 3.00 6,000.00 2.00 4,000.00 6.00 12,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,650.00 1,650.00 1,700.00 1,700.00 4,000.00 4,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 55. 60.00 3,300.00 60.00 3,300.00 80.00 4,400.00 15645 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 7. 1,625.00 11,375.00 1,650.00 11,550.00 1,650.00 11,550.00 646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND HUMUS SY 200. 2.50 500.00 3.15 630.00 2.50 500.00 647.1 HUMUS CY 3,300. 18.00 59,400.00 19.50 64,350.00 13.50 44,550.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 9,500.00 9,500.00 45,000.00 45,000.00 74,000.00 74,000.00 670.0462 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 9,500.00 9,500.00 93,000.00 93,000.00 40,000.00 40,000.00 670.104 TEMP. PORTABLE LIGHTING U 2. 3,000.00 6,000.00 5,100.00 10,200.00 10,000.00 20,000.00 678.2 IMPACT ATTENUATION DEVICE (TEST LEVEL 3) U 5. 20,000.00 100,000.00 20,000.00 100,000.00 20,000.00 100,000.00 678.201 IMPACT ATTENUATOR FOUNDATION PAD U 5. 1,000.00 5,000.00 1,600.00 8,000.00 3,500.00 17,500.00 692. MOBILIZATION U 1. 300,000.00 300,000.00 200,000.00 200,000.00 275,000.00 275,000.00 698.12 FIELD OFFICE TYPE B MON 12. 2,000.00 24,000.00 1,500.00 18,000.00 3,000.00 36,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED- UNANTICIPATED WORK $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.31 ALTERATIONS AND ADDITIONS AS NEEDED - DRAINAGE ADJUSTMENTS $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 135,000.00 135,000.00 135,000.00 135,000.00 135,000.00 135,000.00 $7,272,324.36 $7,568,420.10 $8,544,634.50