THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PITTSFIELD X-A000(829), 15622 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: NOVEMBER 12, 2009 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 28 AND LEAVITT ROAD COMPLETION DATE: AUGUST 13, 2010 A F. L. MERRILL CONSTRUCTION, INC. 619 SAND ROAD, PEMBROKE, NH 03275 $ 622,406.75 B J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 635,337.50 C JOHN H. LYMAN & SONS, INC. 310 HOYT ROAD, GILFORD, NH 03249 $ 649,689.40 D WEAVER BROS., CONST., CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 685,399.30 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 693,483.00 F SUR CONSTRUCTION, INC. 233 CHESTNUT HILL ROAD, ROCHESTER, NH 03867 $ 699,850.00 G CONNIES'S SEPTIC SERVICE, INC. D/B/A C.S.S.I. 513 DONALD ST., BEDFORD, NH 03110 $ 744,309.30 H PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 774,079.50 I THIBEAULT CORPORATION OF NE 603 OLD MAMMOTH RD., LONDONDERRY, NH 03053 $ 825,057.31 J MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 851,131.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.31 FILL ABANDONED PIPE CY 25. 120.00 3,000.00 130.00 3,250.00 150.00 3,750.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 290.00 290.00 250.00 250.00 400.00 400.00 203.1 COMMON EXCAVATION CY 2,300. 7.00 16,100.00 9.00 20,700.00 7.00 16,100.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,375. 4.50 6,187.50 6.00 8,250.00 5.00 6,875.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 27.00 675.00 20.00 500.00 20.00 500.00 214. FINE GRADING U 1. 5,000.00 5,000.00 20,000.00 20,000.00 4,000.00 4,000.00 304.1 SAND (F) CY 515. 11.50 5,922.50 10.00 5,150.00 17.00 8,755.00 304.2 GRAVEL (F) CY 415. 14.25 5,913.75 15.00 6,225.00 20.00 8,300.00 304.3 CRUSHED GRAVEL (F) CY 1,675. 15.25 25,543.75 17.00 28,475.00 28.00 46,900.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,600. 70.00 112,000.00 70.00 112,000.00 67.60 108,160.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD HIGH STRENGTH TON 1,100. 80.00 88,000.00 78.00 85,800.00 74.00 81,400.00 15622 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 10. 187.00 1,870.00 160.00 1,600.00 130.00 1,300.00 403.6 PAVEMENT JOINT ADHESIVE LF 7,700. .28 2,156.00 .30 2,310.00 .25 1,925.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,775. 5.40 9,585.00 7.00 12,425.00 5.25 9,318.75 570.4 MORTAR RUBBLE MASONRY (F) CY 2.5 380.00 950.00 600.00 1,500.00 600.00 1,500.00 585.3 STONE FILL, CLASS C CY 10. 51.00 510.00 50.00 500.00 34.00 340.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 25. 5.45 136.25 10.00 250.00 3.00 75.00 603.00215 15" R.C. PIPE, 2000D LF 20. 75.00 1,500.00 45.00 900.00 56.50 1,130.00 604.12 CATCH BASINS TYPE B U 3. 2,200.00 6,600.00 1,800.00 5,400.00 1,800.00 5,400.00 604.32 DRAINAGE MANHOLES U 1. 2,500.00 2,500.00 2,000.00 2,000.00 1,800.00 1,800.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 250.00 500.00 150.00 300.00 350.00 700.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 1,875. 14.00 26,250.00 16.00 30,000.00 16.00 30,000.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 785. 24.00 18,840.00 18.00 14,130.00 27.00 21,195.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 200. 28.00 5,600.00 24.00 4,800.00 29.00 5,800.00 608.26 6" CONCRETE SIDEWALK (F) SY 8. 133.00 1,064.00 100.00 800.00 100.00 800.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 3. 350.00 1,050.00 450.00 1,350.00 350.00 1,050.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 1. 135.00 135.00 200.00 200.00 150.00 150.00 614.331 3" STEEL CONDUIT LF 113. 21.00 2,373.00 15.00 1,695.00 20.00 2,260.00 614.511 CONCRETE PULL BOX 14" EA 11. 290.00 3,190.00 300.00 3,300.00 283.00 3,113.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 290.00 1,160.00 310.00 1,240.00 283.00 1,132.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 790. 8.00 6,320.00 7.00 5,530.00 8.00 6,320.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 460. 17.00 7,820.00 15.00 6,900.00 16.00 7,360.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 3. 107.00 321.00 100.00 300.00 150.00 450.00 615.03 TRAFFIC SIGN TYPE C (F) SF 94. 33.00 3,102.00 45.00 4,230.00 45.00 4,230.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 6. 120.00 720.00 100.00 600.00 150.00 900.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 4. 28.00 112.00 50.00 200.00 25.00 100.00 616.101 TRAFFIC SIGNALS U 1. 84,500.00 84,500.00 80,000.00 80,000.00 81,585.00 81,585.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 618.7 FLAGGERS HR 1,500. 22.00 33,000.00 12.00 18,000.00 22.00 33,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 6,530.00 6,530.00 10,000.00 10,000.00 6,300.00 6,300.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 540.00 4,320.00 500.00 4,000.00 500.00 4,000.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 49.00 686.00 15.00 210.00 30.00 420.00 622.1 STEEL WITNESS MARKERS EA 5. 43.00 215.00 60.00 300.00 25.00 125.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,880. 3.00 11,640.00 2.00 7,760.00 1.50 5,820.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 23,000. .13 2,990.00 .12 2,760.00 .13 2,990.00 15622 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 940. .55 517.00 .50 470.00 .47 441.80 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 150. .80 120.00 .75 112.50 .89 133.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 105. 4.30 451.50 4.00 420.00 2.67 280.35 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 365. 11.00 4,015.00 10.00 3,650.00 4.00 1,460.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 10,500. .42 4,410.00 .38 3,990.00 .37 3,885.00 641. LOAM CY 225. 11.30 2,542.50 14.00 3,150.00 25.00 5,625.00 645.3 EROSION STONE TON 25. 54.00 1,350.00 35.00 875.00 34.00 850.00 645.531 SILT FENCE LF 1,250. 3.00 3,750.00 2.00 2,500.00 3.00 3,750.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,630.00 1,630.00 1,600.00 1,600.00 1,575.00 1,575.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 55.00 1,100.00 50.00 1,000.00 55.00 1,100.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.3 1,660.00 2,158.00 1,600.00 2,080.00 1,900.00 2,470.00 647.1 HUMUS CY 475. 9.60 4,560.00 12.00 5,700.00 20.00 9,500.00 650.2 LANDSCAPING U 1. 3,100.00 3,100.00 4,000.00 4,000.00 2,940.00 2,940.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 325.00 325.00 500.00 500.00 150.00 150.00 692. MOBILIZATION U 1. 17,200.00 17,200.00 30,000.00 30,000.00 26,500.00 26,500.00 698.13 FIELD OFFICE TYPE C MON 6. 1,050.00 6,300.00 1,200.00 7,200.00 1,550.00 9,300.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 $622,406.75 $635,337.50 $649,689.40 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PITTSFIELD X-A000(829), 15622 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: NOVEMBER 12, 2009 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 28 AND LEAVITT ROAD COMPLETION DATE: AUGUST 13, 2010 A F. L. MERRILL CONSTRUCTION, INC. 619 SAND ROAD, PEMBROKE, NH 03275 $ 622,406.75 B J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 635,337.50 C JOHN H. LYMAN & SONS, INC. 310 HOYT ROAD, GILFORD, NH 03249 $ 649,689.40 D WEAVER BROS., CONST., CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 685,399.30 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 693,483.00 F SUR CONSTRUCTION, INC. 233 CHESTNUT HILL ROAD, ROCHESTER, NH 03867 $ 699,850.00 G CONNIES'S SEPTIC SERVICE, INC. D/B/A C.S.S.I. 513 DONALD ST., BEDFORD, NH 03110 $ 744,309.30 H PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 774,079.50 I THIBEAULT CORPORATION OF NE 603 OLD MAMMOTH RD., LONDONDERRY, NH 03053 $ 825,057.31 J MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 851,131.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.31 FILL ABANDONED PIPE CY 25. 170.00 4,250.00 160.00 4,000.00 170.00 4,250.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 300.00 300.00 250.00 250.00 325.00 325.00 203.1 COMMON EXCAVATION CY 2,300. 6.50 14,950.00 10.00 23,000.00 6.00 13,800.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,375. 7.45 10,243.75 10.00 13,750.00 4.25 5,843.75 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 17.00 425.00 40.00 1,000.00 20.00 500.00 214. FINE GRADING U 1. 11,000.00 11,000.00 40,000.00 40,000.00 2,300.00 2,300.00 304.1 SAND (F) CY 515. 13.25 6,823.75 10.00 5,150.00 16.30 8,394.50 304.2 GRAVEL (F) CY 415. 13.25 5,498.75 12.00 4,980.00 18.10 7,511.50 304.3 CRUSHED GRAVEL (F) CY 1,675. 17.00 28,475.00 15.00 25,125.00 21.25 35,593.75 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,600. 76.00 121,600.00 64.00 102,400.00 64.00 102,400.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD HIGH STRENGTH TON 1,100. 76.00 83,600.00 74.00 81,400.00 74.00 81,400.00 15622 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 10. 125.00 1,250.00 110.00 1,100.00 110.00 1,100.00 403.6 PAVEMENT JOINT ADHESIVE LF 7,700. .27 2,079.00 .26 2,002.00 .26 2,002.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,775. 5.50 9,762.50 5.00 8,875.00 5.00 8,875.00 570.4 MORTAR RUBBLE MASONRY (F) CY 2.5 500.00 1,250.00 500.00 1,250.00 1,150.00 2,875.00 585.3 STONE FILL, CLASS C CY 10. 50.00 500.00 30.00 300.00 45.00 450.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 25. 7.00 175.00 16.00 400.00 3.50 87.50 603.00215 15" R.C. PIPE, 2000D LF 20. 40.00 800.00 50.00 1,000.00 40.00 800.00 604.12 CATCH BASINS TYPE B U 3. 1,700.00 5,100.00 2,000.00 6,000.00 2,290.00 6,870.00 604.32 DRAINAGE MANHOLES U 1. 1,900.00 1,900.00 2,000.00 2,000.00 2,090.00 2,090.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 300.00 600.00 500.00 1,000.00 230.00 460.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 1,875. 16.00 30,000.00 15.00 28,125.00 20.00 37,500.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 785. 20.00 15,700.00 20.00 15,700.00 28.30 22,215.50 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 200. 27.00 5,400.00 22.00 4,400.00 30.25 6,050.00 608.26 6" CONCRETE SIDEWALK (F) SY 8. 45.00 360.00 100.00 800.00 115.00 920.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 3. 425.00 1,275.00 300.00 900.00 275.00 825.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 1. 250.00 250.00 200.00 200.00 175.00 175.00 614.331 3" STEEL CONDUIT LF 113. 13.00 1,469.00 15.00 1,695.00 19.00 2,147.00 614.511 CONCRETE PULL BOX 14" EA 11. 290.00 3,190.00 300.00 3,300.00 270.00 2,970.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 325.00 1,300.00 300.00 1,200.00 270.00 1,080.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 790. 7.35 5,806.50 8.00 6,320.00 7.50 5,925.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 460. 16.00 7,360.00 16.00 7,360.00 15.40 7,084.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 3. 1,300.00 3,900.00 400.00 1,200.00 1,200.00 3,600.00 615.03 TRAFFIC SIGN TYPE C (F) SF 94. 47.00 4,418.00 45.00 4,230.00 45.00 4,230.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 6. 105.00 630.00 200.00 1,200.00 100.00 600.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 4. 27.00 108.00 25.00 100.00 25.00 100.00 616.101 TRAFFIC SIGNALS U 1. 82,000.00 82,000.00 78,000.00 78,000.00 77,700.00 77,700.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 618.7 FLAGGERS HR 1,500. 22.00 33,000.00 24.00 36,000.00 17.40 26,100.00 619.1 MAINTENANCE OF TRAFFIC U 1. 20,000.00 20,000.00 40,000.00 40,000.00 25,000.00 25,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 325.00 2,600.00 400.00 3,200.00 250.00 2,000.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 30.00 420.00 30.00 420.00 75.00 1,050.00 622.1 STEEL WITNESS MARKERS EA 5. 25.00 125.00 30.00 150.00 30.00 150.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,880. 1.25 4,850.00 2.00 7,760.00 1.00 3,880.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 23,000. .13 2,990.00 .12 2,760.00 .12 2,760.00 15622 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 940. .47 441.80 .45 423.00 .50 470.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 150. .90 135.00 .85 127.50 1.00 150.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 105. 2.65 278.25 2.55 267.75 2.00 210.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 365. 4.00 1,460.00 3.85 1,405.25 3.25 1,186.25 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 10,500. .40 4,200.00 .35 3,675.00 .35 3,675.00 641. LOAM CY 225. 20.00 4,500.00 20.00 4,500.00 28.00 6,300.00 645.3 EROSION STONE TON 25. 35.00 875.00 30.00 750.00 25.00 625.00 645.531 SILT FENCE LF 1,250. 2.70 3,375.00 2.00 2,500.00 3.30 4,125.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,600.00 1,600.00 1,500.00 1,500.00 1,200.00 1,200.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 55.00 1,100.00 50.00 1,000.00 51.00 1,020.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.3 2,000.00 2,600.00 1,525.00 1,982.50 1,525.00 1,982.50 647.1 HUMUS CY 475. 13.00 6,175.00 20.00 9,500.00 20.00 9,500.00 650.2 LANDSCAPING U 1. 3,600.00 3,600.00 3,000.00 3,000.00 3,640.00 3,640.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 125.00 125.00 250.00 250.00 125.00 125.00 692. MOBILIZATION U 1. 55,000.00 55,000.00 40,000.00 40,000.00 79,651.75 79,651.75 698.13 FIELD OFFICE TYPE C MON 6. 1,700.00 10,200.00 100.00 600.00 2,000.00 12,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 $685,399.30 $693,483.00 $699,850.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PITTSFIELD X-A000(829), 15622 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: NOVEMBER 12, 2009 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 28 AND LEAVITT ROAD COMPLETION DATE: AUGUST 13, 2010 A F. L. MERRILL CONSTRUCTION, INC. 619 SAND ROAD, PEMBROKE, NH 03275 $ 622,406.75 B J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 635,337.50 C JOHN H. LYMAN & SONS, INC. 310 HOYT ROAD, GILFORD, NH 03249 $ 649,689.40 D WEAVER BROS., CONST., CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 685,399.30 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 693,483.00 F SUR CONSTRUCTION, INC. 233 CHESTNUT HILL ROAD, ROCHESTER, NH 03867 $ 699,850.00 G CONNIES'S SEPTIC SERVICE, INC. D/B/A C.S.S.I. 513 DONALD ST., BEDFORD, NH 03110 $ 744,309.30 H PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 774,079.50 I THIBEAULT CORPORATION OF NE 603 OLD MAMMOTH RD., LONDONDERRY, NH 03053 $ 825,057.31 J MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 851,131.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.31 FILL ABANDONED PIPE CY 25. 135.00 3,375.00 225.00 5,625.00 298.92 7,473.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 500.00 500.00 300.00 300.00 1,091.26 1,091.26 203.1 COMMON EXCAVATION CY 2,300. 10.00 23,000.00 13.00 29,900.00 7.53 17,319.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,375. 5.00 6,875.00 7.00 9,625.00 11.23 15,441.25 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 35.00 875.00 20.00 500.00 301.26 7,531.50 214. FINE GRADING U 1. 5,000.00 5,000.00 20,000.00 20,000.00 5,661.01 5,661.01 304.1 SAND (F) CY 515. 14.50 7,467.50 22.50 11,587.50 14.40 7,416.00 304.2 GRAVEL (F) CY 415. 18.50 7,677.50 22.50 9,337.50 14.29 5,930.35 304.3 CRUSHED GRAVEL (F) CY 1,675. 22.50 37,687.50 27.00 45,225.00 16.43 27,520.25 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,600. 68.00 108,800.00 69.80 111,680.00 73.75 118,000.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD HIGH STRENGTH TON 1,100. 78.00 85,800.00 75.80 83,380.00 84.43 92,873.00 15622 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 10. 150.00 1,500.00 150.00 1,500.00 133.60 1,336.00 403.6 PAVEMENT JOINT ADHESIVE LF 7,700. .35 2,695.00 .26 2,002.00 .32 2,464.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,775. 5.50 9,762.50 4.95 8,786.25 5.34 9,478.50 570.4 MORTAR RUBBLE MASONRY (F) CY 2.5 1,000.00 2,500.00 600.00 1,500.00 534.39 1,335.98 585.3 STONE FILL, CLASS C CY 10. 50.00 500.00 55.00 550.00 16.71 167.10 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 25. 3.00 75.00 1.00 25.00 24.35 608.75 603.00215 15" R.C. PIPE, 2000D LF 20. 40.00 800.00 65.00 1,300.00 36.82 736.40 604.12 CATCH BASINS TYPE B U 3. 1,800.00 5,400.00 2,500.00 7,500.00 2,132.94 6,398.82 604.32 DRAINAGE MANHOLES U 1. 1,800.00 1,800.00 2,700.00 2,700.00 2,245.16 2,245.16 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 450.00 900.00 300.00 600.00 197.72 395.44 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 1,875. 16.00 30,000.00 25.00 46,875.00 14.49 27,168.75 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 785. 30.00 23,550.00 42.00 32,970.00 21.07 16,539.95 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 200. 33.00 6,600.00 58.00 11,600.00 21.47 4,294.00 608.26 6" CONCRETE SIDEWALK (F) SY 8. 90.00 720.00 200.00 1,600.00 115.00 920.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 3. 350.00 1,050.00 250.00 750.00 213.75 641.25 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 1. 100.00 100.00 160.00 160.00 267.19 267.19 614.331 3" STEEL CONDUIT LF 113. 13.50 1,525.50 20.00 2,260.00 14.96 1,690.48 614.511 CONCRETE PULL BOX 14" EA 11. 325.00 3,575.00 275.00 3,025.00 293.91 3,233.01 614.522 MOLDED PULL BOX 13"X24" EA 4. 325.00 1,300.00 275.00 1,100.00 293.91 1,175.64 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 790. 7.00 5,530.00 8.00 6,320.00 7.48 5,909.20 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 460. 16.50 7,590.00 16.00 7,360.00 17.10 7,866.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 3. 250.00 750.00 1,200.00 3,600.00 534.39 1,603.17 615.03 TRAFFIC SIGN TYPE C (F) SF 94. 45.00 4,230.00 45.00 4,230.00 10.69 1,004.86 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 6. 200.00 1,200.00 100.00 600.00 534.39 3,206.34 615.06 TRAFFIC SIGN TYPE CC (F) SF 4. 40.00 160.00 25.00 100.00 53.44 213.76 616.101 TRAFFIC SIGNALS U 1. 88,000.00 88,000.00 80,000.00 80,000.00 84,000.00 84,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 618.7 FLAGGERS HR 1,500. 23.00 34,500.00 21.00 31,500.00 32.06 48,090.00 619.1 MAINTENANCE OF TRAFFIC U 1. 60,000.00 60,000.00 30,000.00 30,000.00 39,726.75 39,726.75 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 350.00 2,800.00 300.00 2,400.00 267.19 2,137.52 621.31 SINGLE DELINEATOR WITH POST EA 14. 30.00 420.00 45.00 630.00 374.07 5,236.98 622.1 STEEL WITNESS MARKERS EA 5. 25.00 125.00 40.00 200.00 267.19 1,335.95 628.2 SAWED BITUMINOUS PAVEMENT LF 3,880. 1.75 6,790.00 1.00 3,880.00 4.28 16,606.40 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 23,000. .18 4,140.00 .12 2,760.00 .48 11,040.00 15622 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 940. 1.05 987.00 .50 470.00 1.07 1,005.80 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 150. 1.54 231.00 1.00 150.00 1.07 160.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 105. 3.96 415.80 2.00 210.00 2.14 224.70 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 365. 11.00 4,015.00 3.25 1,186.25 5.34 1,949.10 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 10,500. .28 2,940.00 .35 3,675.00 .53 5,565.00 641. LOAM CY 225. 20.00 4,500.00 20.00 4,500.00 19.52 4,392.00 645.3 EROSION STONE TON 25. 40.00 1,000.00 25.00 625.00 30.76 769.00 645.531 SILT FENCE LF 1,250. 2.50 3,125.00 3.00 3,750.00 3.21 4,012.50 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,000.00 2,000.00 1,500.00 1,500.00 1,282.52 1,282.52 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 75.00 1,500.00 50.00 1,000.00 90.85 1,817.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.3 2,500.00 3,250.00 1,900.00 2,470.00 1,603.16 2,084.11 647.1 HUMUS CY 475. 12.00 5,700.00 12.00 5,700.00 20.60 9,785.00 650.2 LANDSCAPING U 1. 3,500.00 3,500.00 3,000.00 3,000.00 6,046.56 6,046.56 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 500.00 500.00 300.00 300.00 1,068.77 1,068.77 692. MOBILIZATION U 1. 52,000.00 52,000.00 60,000.00 60,000.00 107,945.82 107,945.82 698.13 FIELD OFFICE TYPE C MON 6. 1,500.00 9,000.00 1,000.00 6,000.00 1,603.16 9,618.96 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 $744,309.30 $774,079.50 $825,057.31 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PITTSFIELD X-A000(829), 15622 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: NOVEMBER 12, 2009 SCOPE OF WORK: ROADWAY REHABILITATION LOCATION: NH ROUTE 28 AND LEAVITT ROAD COMPLETION DATE: AUGUST 13, 2010 A F. L. MERRILL CONSTRUCTION, INC. 619 SAND ROAD, PEMBROKE, NH 03275 $ 622,406.75 B J. PARKER & DAUGHTERS, INC. 70 DAROSKA ROAD, PITTSFIELD, NH 03263 $ 635,337.50 C JOHN H. LYMAN & SONS, INC. 310 HOYT ROAD, GILFORD, NH 03249 $ 649,689.40 D WEAVER BROS., CONST., CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 685,399.30 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 693,483.00 F SUR CONSTRUCTION, INC. 233 CHESTNUT HILL ROAD, ROCHESTER, NH 03867 $ 699,850.00 G CONNIES'S SEPTIC SERVICE, INC. D/B/A C.S.S.I. 513 DONALD ST., BEDFORD, NH 03110 $ 744,309.30 H PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 774,079.50 I THIBEAULT CORPORATION OF NE 603 OLD MAMMOTH RD., LONDONDERRY, NH 03053 $ 825,057.31 J MORRILL CONSTRUCTION, INC. 190 HORSE MEADOW RD., NORTH HAVERHILL, NH 03774 $ 851,131.75 ------------------------------------------------------------------------------------------------------------------------------------ ITEM J NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.31 FILL ABANDONED PIPE CY 25. 300.00 7,500.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 1. 350.00 350.00 203.1 COMMON EXCAVATION CY 2,300. 13.00 29,900.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,375. 6.50 8,937.50 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25. 35.00 875.00 214. FINE GRADING U 1. 5,500.00 5,500.00 304.1 SAND (F) CY 515. 20.00 10,300.00 304.2 GRAVEL (F) CY 415. 25.00 10,375.00 304.3 CRUSHED GRAVEL (F) CY 1,675. 30.00 50,250.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 1,600. 69.80 111,680.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD HIGH STRENGTH TON 1,100. 75.80 83,380.00 15622 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM J NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 10. 150.00 1,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 7,700. .26 2,002.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,775. 4.95 8,786.25 570.4 MORTAR RUBBLE MASONRY (F) CY 2.5 600.00 1,500.00 585.3 STONE FILL, CLASS C CY 10. 45.00 450.00 593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 25. 13.00 325.00 603.00215 15" R.C. PIPE, 2000D LF 20. 45.00 900.00 604.12 CATCH BASINS TYPE B U 3. 2,500.00 7,500.00 604.32 DRAINAGE MANHOLES U 1. 2,500.00 2,500.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 500.00 1,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 1,875. 42.00 78,750.00 605.512 12" PERF. CORR. POLYETHLY PIPE UND. LF 785. 44.00 34,540.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 200. 51.00 10,200.00 608.26 6" CONCRETE SIDEWALK (F) SY 8. 120.00 960.00 608.54 DETECTABLE WARNING DEVICES, CAST IRON SY 3. 275.00 825.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 1. 250.00 250.00 614.331 3" STEEL CONDUIT LF 113. 19.00 2,147.00 614.511 CONCRETE PULL BOX 14" EA 11. 270.00 2,970.00 614.522 MOLDED PULL BOX 13"X24" EA 4. 270.00 1,080.00 614.7314 3" PVC PLASTIC CONDUIT, SCHEDULE 40 LF 790. 7.50 5,925.00 614.7318 3" PVC PLASTIC CONDUIT, SCHEDULE 80 LF 460. 15.40 7,084.00 615.024 RELOCATING TRAFFIC SIGN, TYPE B U 3. 2,650.00 7,950.00 615.03 TRAFFIC SIGN TYPE C (F) SF 94. 45.00 4,230.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 6. 200.00 1,200.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 4. 25.00 100.00 616.101 TRAFFIC SIGNALS U 1. 77,700.00 77,700.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 618.7 FLAGGERS HR 1,500. 25.00 37,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 16,000.00 16,000.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 8. 800.00 6,400.00 621.31 SINGLE DELINEATOR WITH POST EA 14. 50.00 700.00 622.1 STEEL WITNESS MARKERS EA 5. 44.00 220.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,880. 3.00 11,640.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 23,000. .12 2,760.00 15622 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM J NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 940. .50 470.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 150. .75 112.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 105. 4.00 420.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 365. 10.00 3,650.00 632.9104 OBLITERATE PAVEMENT MARKING, 4" LINE LF 10,500. .38 3,990.00 641. LOAM CY 225. 48.00 10,800.00 645.3 EROSION STONE TON 25. 40.00 1,000.00 645.531 SILT FENCE LF 1,250. 4.00 5,000.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,500.00 1,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 50.00 1,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1.3 1,525.00 1,982.50 647.1 HUMUS CY 475. 35.00 16,625.00 650.2 LANDSCAPING U 1. 3,640.00 3,640.00 670.0661 MULTIPLE MAILBOXES SUPPORT ASSEMBLIES EA 1. 300.00 300.00 692. MOBILIZATION U 1. 80,000.00 80,000.00 698.13 FIELD OFFICE TYPE C MON 6. 2,000.00 12,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 5,000.00 5,000.00 $851,131.75